Closed
1016654387 2025-SUS-007 Rail Infrastructure Carbon Conventions
Rail Safety Standards Board (RSSB) · Public undertaking
In brief
Rail Safety Standards Board (RSSB) was looking for suppliers for research work. Bidding has closed and no award has been published yet.
The estimated value is £125,000 excluding VAT.
The contract runs for 9 months, starting 6 July 2026.
The buyer says it is suitable for small and medium-sized businesses.
Built from the notice's own fields. Always check the official notice before you bid.
What the notice says
RSSB is seeking to procure a research supplier to deliver the project scope detailed in the Work Packages (WPs) detailed in the Project Scope. The Objectives of the RICCs are to: 1. Develop a GB rail specific translation of the ICMS 3 asset taxonomy that maintains full ICMS 3 compatibilities while enabling like-for-like comparison of assessments 2. Develop a proportionate, standardised set of GB-rail asset and works descriptors, together with a simplified uncertainty framework, to enable designers to consistently reuse and interpret past assessments and to clearly understand and communicate the associated levels of uncertainty 3. Establish a set of standardised GB rail component build-ups…Read the full description
RSSB is seeking to procure a research supplier to deliver the project scope detailed in the Work Packages (WPs) detailed in the Project Scope. The Objectives of the RICCs are to:
1. Develop a GB rail specific translation of the ICMS 3 asset taxonomy that maintains full ICMS 3 compatibilities while enabling like-for-like comparison of assessments
2. Develop a proportionate, standardised set of GB-rail asset and works descriptors, together with a simplified uncertainty framework, to enable designers to consistently reuse and interpret past assessments and to clearly understand and communicate the associated levels of uncertainty
3. Establish a set of standardised GB rail component build-ups that make underlying assumptions explicit and consistent, reducing assessor variation and saving time by enabling faster, more efficient early-stage WLCAs
4. Establish a consolidated, GB rail appropriate set of default emission factors that standardises assumptions, reduces assessment variability, and delivers cost and time savings by enabling more consistent and efficient early-stage WLCAs
5. Define consistent, GB rail appropriate lifespan, replacement, and maintenance assumptions to reduce modelling variability and save time and cost by enabling more reliable, efficient early-stage WLCAs
6. Ensure the conventions are, as far as practicable, compatible with existing GB and EU standards and informed by recognised best practice both within rail and across other sectors.
For more information about this opportunity, please visit the eSourcing portal at:
https://www.delta-esourcing.com/tenders/UK-UK-London:-Research-services./6UU9C87W2P
To respond to this opportunity, please click here:
https://www.delta-esourcing.com/respond/6UU9C87W2P
Timeline
- Tender notice · UK4, notice 031567-2026
About the buyer
Rail Safety Standards Board (RSSB)Last 12 months
Procurements
46Awards
22Suppliers it has used most for research
- Ove Arup & Partners Ltd2 contracts
- Andromeda Engineering Ltd1 contract
- DGauge Ltd1 contract
- Engineering Support Group Limited1 contract
- OptiConsulting Limited1 contract
Similar open tenders
All open research tenders- £350kestimated
- £100kestimated
- £80kestimated
- £260mframework ceiling
- £170kestimated
From notice 031567-2026 on Find a Tender, first published 7 April 2026. We last checked for changes on 28 September 2026.