AwardedAwarded 15 September 2025

9002513 - Supply of Horizontal and Vertical Collimator Assemblies

Diamond Light Source Limited · Central government

In brief

Diamond Light Source Limited awarded this contract to FMB Feinwerk- und Messtechnik GmbH on 15 September 2025.

Built from the notice's own fields. Always check the official notice before you bid.

What the notice says

Located on the Harwell Science and Innovation Campus in Oxfordshire, Diamond Light Source (DLS) is a leading-edge facility for science, engineering and innovation. Diamond allows researchers from academia and industry to investigate the structure and behaviour of the world around us at the atomic and molecular level. To continue delivering the world-changing science that Diamond enables, the facility is being upgraded to Diamond-II, a co-ordinated programme of development that combines a major machine upgrade with new instruments and complementary improvements to optics,detectors, sample environment and delivery capabilities, and computing, as well as integrated and correlative methods.…Read the full description
Located on the Harwell Science and Innovation Campus in Oxfordshire, Diamond Light Source (DLS) is a leading-edge facility for science, engineering and innovation. Diamond allows researchers from academia and industry to investigate the structure and behaviour of the world around us at the atomic and molecular level. To continue delivering the world-changing science that Diamond enables, the facility is being upgraded to Diamond-II, a co-ordinated programme of development that combines a major machine upgrade with new instruments and complementary improvements to optics,detectors, sample environment and delivery capabilities, and computing, as well as integrated and correlative methods. This will be transformative in speed and spatial resolution and will offer users streamlined access to enhanced instruments for life and physical sciences. The scope of this contract is to design and manufacture two types of Collimator assemblies which form part of the Diamond-II Storage Ring, this will require several development activities, such as design, trials, manufacture, welding, inspection, testing and delivery to Diamond Light Sources. Installation at DLS is not included. There will be six (6) Collimator assemblies required for Diamond-II, three Vertical and three Horizontal. These are used to collect particles lost from the electron beam and to provide machine protection for sensitive components within the Diamond-II Storage Ring, they will be fitted at specific positions around the storage ring mounted on MS Girders.

Who won

WinnerValueDates
FMB Feinwerk- und Messtechnik GmbH (SME)€510,800
15 September 2025 to 18 December 2026

Values as the award notice gives them, excluding VAT where stated.

Timeline

  1. Contract details notice · UK7, notice 060528-2025

About the buyer

Procurements

34

Awards

25

Suppliers it has used most

From notice 060528-2025 on Find a Tender, first published 29 September 2025. We last checked for changes on 28 September 2026.