AwardedAwarded 1 October 2025
9002558 - Supply of I17 Front End for Diamond-II
Diamond Light Source Limited · Central government
In brief
Diamond Light Source Limited awarded this contract to FMB Feinwerk- und Messtechnik GmbH on 1 October 2025.
Built from the notice's own fields. Always check the official notice before you bid.
What the notice says
Located on the Harwell Science & Innovation Campus in Oxfordshire, Diamond Light Source (DLS) is a leading-edge facility for science, engineering and innovation. DLS allows researchers from academia and industry to investigate the structure and behaviour of the world around us at the atomic and molecular level. To continue delivering the world-changing science that Diamond enables, the facility is being upgraded to Diamond-II, a co-ordinated programme of development that combines a major machine upgrade with new instruments and complementary improvements to optics,detectors, sample environment and delivery capabilities, and computing, as well as integrated and correlative methods. This will…Read the full description
Located on the Harwell Science & Innovation Campus in Oxfordshire, Diamond Light Source (DLS) is a leading-edge facility for science, engineering and innovation. DLS allows researchers from academia and industry to investigate the structure and behaviour of the world around us at the atomic and molecular level.
To continue delivering the world-changing science that Diamond enables, the facility is being upgraded to Diamond-II, a co-ordinated programme of development that combines a major machine upgrade with new instruments and complementary improvements to optics,detectors, sample environment and delivery capabilities, and computing, as well as integrated and correlative methods. This will be transformative in speed and spatial resolution and will offer users streamlined access to enhanced instruments for life and physical sciences.
The scope of the contract is to design, manufacture, supply, test and deliver one Front end for the I17 beamline in Diamond-II.
The term 'Front End' refers to the section of the synchrotron that runs between the stoage ring and the shield wall. The front end conditions the beam in preparation for use on the beamline.
The Front End will be located in a restricted area so it must be capable of continuous operation over long periods without maintenenance. The support frames must be rigid construction and constructed so that they minimise the effects of ground vibrations. The support frames must be supported from the floor with 3 manually adjustable feet to allow them to be accurately surveyed into position.
The Front End will be procured as a single turnkey unit, subject to the performance specification. The system comprises:
1. One complete Front End
2. All cabling, cable management features & connections to
junction boxes & bulkheads located on the Front Ends
3. One lifting frame
4. Bake out equipment
5. Sufficient spare parts to guarantee system operation with
minimum down-time for a period of at least two years from the
date of final acceptance.
Who won
| Winner | Value | Dates |
|---|---|---|
| FMB Feinwerk- und Messtechnik GmbH (SME) | €449,700 | 1 October 2025 to 31 May 2027 |
Values as the award notice gives them, excluding VAT where stated.
Timeline
- Contract details notice · UK7, notice 064157-2025
About the buyer
Diamond Light Source LimitedLast 12 months
Procurements
33Awards
25Suppliers it has used most
- XDS Oxford Limited5 contracts
- Instrument Design Technology Limited4 contracts
- Kyma S.p.A.3 contracts
- Danfysik2 contracts
- FMB Feinwerk- und Messtechnik GmbH2 contracts
- NCF Engineering Ltd (T/A Ferrositi)2 contracts
- Bestec GmbH1 contract
- Bluescientific Limited1 contract
From notice 064157-2025 on Find a Tender, first published 10 October 2025. We last checked for changes on 28 September 2026.