Upcoming
Auto-Reconfiguration Signalling Power Supply Systems - Preliminary Market Engagement
Network Rail Infrastructure Limited · Central government
In brief
Network Rail Infrastructure Limited has announced plans to buy this contract. This is an early notice: there is nothing to bid on yet, but it tells you a tender may follow.
The notice does not state a value.
The contract runs for 4 years, starting 1 January 2028.
The buyer says it is suitable for small and medium-sized businesses.
Built from the notice's own fields. Always check the official notice before you bid.
Can I win this?
Competition
Typical: a median of 3 bids per contract for this buyer (from 28 awards in the last 12 months).
What the notice says
Network Rail operates a large portfolio of Auto Reconfiguration systems used to support the resilience of 400V TN S and 650V IT signalling power supplies. Many of these systems have been operational for more than two decades and face several challenges: • Obsolescence of essential components affecting maintainability and availability • Reliance on legacy telecoms (such as 3G) due to national network withdrawals • Rising failure risk due to ageing cables, switchgear and protection components • Limited diagnostic capability in existing systems • Inconsistent compatibility with modern power protection and monitoring solutions • Increasing sustainability pressures, including carbon reduction…Read the full description
Network Rail operates a large portfolio of Auto Reconfiguration systems used to support the resilience of 400V TN S and 650V IT signalling power supplies. Many of these systems have been operational for more than two decades and face several challenges:
• Obsolescence of essential components affecting maintainability and availability
• Reliance on legacy telecoms (such as 3G) due to national network withdrawals
• Rising failure risk due to ageing cables, switchgear and protection components
• Limited diagnostic capability in existing systems
• Inconsistent compatibility with modern power protection and monitoring solutions
• Increasing sustainability pressures, including carbon reduction and waste minimisation
To support Network Rail’s long-term asset strategy and maintain operational performance, we are exploring a future programme to introduce a modern, cyber secure, modular, maintainable Auto Reconfiguration SPS platform.
This aligns to wider organisational objectives including:
• Improving safety and reliability for passengers and freight
• Supporting digital railway capabilities
• Reducing operational carbon
• Enhancing maintainability
• Delivering sustainable whole life value
This preliminary market engagement will help confirm commercial viability, test supplier capability, and identify innovative approaches to support a future-proofed solution. It also seeks to understand the level of interest from the supply chain for any future tendering activity.
How to bid
- Read the full notice on Find a Tender, including any tender documents it links to.
- Register your organisation on the Central Digital Platform (through Find a Tender) if you have not already. Suppliers need to be registered to take part in procurements under the Procurement Act 2023.
- Follow the submission instructions in the notice; it does not name an e-tendering portal.
Timeline
- Preliminary market engagement notice · UK2, notice 026290-2026
About the buyer
Network Rail Infrastructure LimitedLast 12 months
Procurements
248Awards
83Suppliers it has used most
- Oracle Corporation UK Limited5 contracts
- Ground Control Limited4 contracts
- Tended Limited3 contracts
- Inspire (Structures) Ltd2 contracts
- Pole Star Eam Limited2 contracts
- QTS Group Limited2 contracts
- Siemens Mobility Limited2 contracts
- TrackSYS Non Destructive Testing Limited2 contracts
From notice 026290-2026 on Find a Tender, first published 23 March 2026. We last checked for changes on 28 September 2026.