Upcoming

Automated People Mover (APM) Infrastructure

High Speed Two (HS2) Limited · Local or regional public body

In brief

High Speed Two (HS2) Limited has announced plans to buy construction work. This is an early notice: there is nothing to bid on yet, but it tells you a tender may follow.

The estimated value is £154,000,000 excluding VAT.

The contract runs for 51 months, starting 19 April 2029.

The buyer says it is suitable for small and medium-sized businesses.

Built from the notice's own fields. Always check the official notice before you bid.

Can I win this?

Competition

Usually high: a median of 6 bids per contract for construction contracts across the UK (from 1973 awards in the last 12 months).

What the notice says

The HS2 Phase One route is from London Euston to the West Midlands and includes the development of high-speed rail stations at London Euston, London Old Oak Common, Birmingham Interchange and Birmingham Curzon Street.The proposed HS2 Birmingham Interchange Station will be situated approximately 20 km to the southeast of Birmingham city centre, close to Birmingham Airport. An Automated People Mover (APM) is required to transport passengers from adjacent areas to the Interchange Station and the wider HS2 network. The APM network will consist of a maintenance facility and four stops detailed herein: I. Interchange Station stop; II. National Exhibition Centre stop; III. Birmingham…Read the full description
The HS2 Phase One route is from London Euston to the West Midlands and includes the development of high-speed rail stations at London Euston, London Old Oak Common, Birmingham Interchange and Birmingham Curzon Street.The proposed HS2 Birmingham Interchange Station will be situated approximately 20 km to the southeast of Birmingham city centre, close to Birmingham Airport. An Automated People Mover (APM) is required to transport passengers from adjacent areas to the Interchange Station and the wider HS2 network. The APM network will consist of a maintenance facility and four stops detailed herein: I. Interchange Station stop; II. National Exhibition Centre stop; III. Birmingham International Railway Station stop; and IV. Birmingham Airport stop. The APM has been designed as an elevated mass transit system, which will transport passengers between those stops detailed above. The APM route will consist of a 2.3km long viaduct, four stops and a maintenance facility. The Interchange Station Stop is at ground level and the three other stops and maintenance facility are on the viaduct (above ground level). The route has several major crossings to navigate, such as the M42 motorway, the West Coast Main Line (WCML) and Pendigo Lake at the National Exhibition Centre (NEC) site. The key design features of the APM Infrastructure include reinforced central concrete piers, weathered steel deck and escape walkway gratings throughout the entirety of the track. To minimise impact to the existing developed site and public roads, the entire 2.3km route is on an elevated viaduct. This is made up of a range of single and twin track at various points along the route to allow trains to pass each other.The piers range from 6 metres high to 14 metres, depending on the topography along the route. In order to maintain a consistent level for the viaduct, the columns will need to vary in height. The stops at Birmingham Airport and at Interchange Station will have a single platform face and the intermediate stops at the NEC and Birmingham International Railway Station have two platform faces. The platforms vary from 36m to 40m long and all platforms are fully covered with canopies and have step free access. The APM Infrastructure scope includes the detailed design and delivery of all piers, viaducts, APM stops, the APM maintenance facility as well as temporary works. The APM Infrastructure Contractor will be the Principal Contractor for the works and will be responsible for managing the APM Systems Contractor as well as nominated HS2 Contractors during these works. The APM Infrastructure Contractor will be responsible for managing all the interfaces and access for the works. Further details on interfacing contractors will be provided in the Tender documentation for the APM Infrastructure procurement.

How to bid

  1. Read the full notice on Find a Tender, including any tender documents it links to.
  2. Register your organisation on the Central Digital Platform (through Find a Tender) if you have not already. Suppliers need to be registered to take part in procurements under the Procurement Act 2023.
  3. Follow the submission instructions in the notice; it does not name an e-tendering portal.

Timeline

  1. Pipeline notice · UK1, notice 048677-2026

About the buyer

Similar open tenders

All open construction tenders
  1. APX056 - Competitive Land, Design and Build Competition for Westbank Derry

    Apex Housing AssociationNorthern IrelandConstruction

    Closing soon2 hours leftLow competition

    £50mestimated
  2. St Edmunds College Air Conditioning Services

    ST Edmund's College CambridgeEast of EnglandHeating, plumbing and ventilation, Construction

    Closing soon2 hours leftSmall contract

    Value not stated
  3. St Edmunds College Gutter Cleaning Services

    ST Edmund's College CambridgeEast of EnglandConstruction, Building maintenance and repairs

    Closing soon2 hours leftSmall contract

    Value not stated
  4. St Edmunds College Roller Shutter Maintenance Services

    ST Edmund's College CambridgeEast of EnglandConstruction, Building maintenance and repairs

    Closing soon2 hours leftSmall contract

    Value not stated
  5. Flooring Measured Term Contract

    City Hospitals Independent Commercial Enterprises LimitedNorth EastConstruction, Building maintenance and repairs

    Closing soon2 hours leftLow competition2 lotsSuitable for SMEsSmall contract

    £400kestimated

From notice 048677-2026 on Find a Tender, first published 26 May 2026. We last checked for changes on 28 September 2026.