Open20 days left · express interest by 10am, Tuesday 20 October 2026

Basildon Station Platform Replacements (1&2) GRIP 5-8 2026

C2C Railway Limited · Public undertaking

In brief

C2C Railway Limited is looking for suppliers for lift and construction work (East of England, London).

The estimated value is £20,000,000 excluding VAT.

The contract runs for 15 months, starting 28 January 2027.

This is the first stage: register your interest by 10am, Tuesday 20 October 2026, and shortlisted suppliers are invited to bid.

Built from the notice's own fields. Always check the official notice before you bid.

Can I win this?

Key dates

Express interest by
10am, Tuesday 20 October 2026

This is the first stage. You register interest now, and shortlisted suppliers are invited to bid later.

How bids are scored

Technical/Quality 55% · Commercial 35% · Social Value 10%

Quality matters most. You can win without being the cheapest.

Competition

Typical: a median of 4.5 bids per contract for lift contracts in this region (from 16 awards in the last 12 months).

What the notice says

Contract for the multi-disciplinary detailed design for renewal of the two platforms and associated infrastructure and both passenger lifts at Basildon station, in south Essex. Basildon station is located at 24miles 26chains on the FSS2 Fenchurch Street to Shoeburyness line. Basildon Station was constructed in the 1970s comprising 2No. platforms which were partially founded on an embankment constructed in the 1930s. The main station buildings are at street level, with each platform accessed via a lift or staircase. The platforms have short canopies, where the platform construction is built off a bridge deck, that spans over Station Way public highway and the booking hall, at street level.…Read the full description
Contract for the multi-disciplinary detailed design for renewal of the two platforms and associated infrastructure and both passenger lifts at Basildon station, in south Essex. Basildon station is located at 24miles 26chains on the FSS2 Fenchurch Street to Shoeburyness line. Basildon Station was constructed in the 1970s comprising 2No. platforms which were partially founded on an embankment constructed in the 1930s. The main station buildings are at street level, with each platform accessed via a lift or staircase. The platforms have short canopies, where the platform construction is built off a bridge deck, that spans over Station Way public highway and the booking hall, at street level. The remainder of the platforms are exposed and of suspended concrete construction. The platforms were found to be subject to serious defects and movement during routine inspection work carried out during summer 2021, whereafter it was concluded that the platforms were beyond economic repair. This resulted in the platforms being subject to temporary propping, monitoring and regular inspection, all pending demolition and renewal of the platforms. C2c are now looking to run a procurement process to enter into a JCT Design & Build contract for renewal of the 1974 sections of both platforms 1 and 2 at Basildon, along with renewal of the station lifts serving the platforms, and associated station systems.

Should I bid?

Tick what applies to you. Nothing is saved.

How to bid

  1. Read the full notice on Find a Tender, including any tender documents it links to.
  2. Register your organisation on the Central Digital Platform (through Find a Tender) if you have not already. Suppliers need to be registered to take part in procurements under the Procurement Act 2023.
  3. Follow the submission instructions in the notice; it does not name an e-tendering portal.
  4. Register your interest before 10am, Tuesday 20 October 2026. Shortlisted suppliers are then invited to bid.

Timeline

  1. Tender notice · UK4, notice 091178-2026

About the buyer

Similar open tenders

All open lift tenders
  1. The provision of Lift Replacement, Lift Modernisation and ongoing maintenance

    London Borough of SuttonNorth East, North West, Yorkshire and the Humber, East Midlands, West Midlands, East of England, London, South East, South WestConstruction, Electrical

    Closing soon5 days leftSuitable for SMEsSmall contract

    £3mestimated
  2. 607 West Horndon Station Footbridge FSS2/59 Renewal

    C2C Railway LimitedEast of EnglandConstruction, Electrical

    Open19 days leftExpress interestSuitable for SMEs

    £4.5mestimated

From notice 091178-2026 on Find a Tender, first published 25 September 2026. We last checked for changes on 28 September 2026.