Upcoming

Construction Framework - Depot & Stations Infrastructure Works

Northern Trains Limited · Central government

In brief

Northern Trains Limited has announced plans to buy construction work. This is an early notice: there is nothing to bid on yet, but it tells you a tender may follow.

It is a framework worth up to £300,000,000 excluding VAT: the most the buyer expects to spend across all suppliers, not one contract.

The contract runs for 5 years, up to 8 years with extensions, starting 1 March 2027.

The buyer says it is suitable for small and medium-sized businesses.

Built from the notice's own fields. Always check the official notice before you bid.

Can I win this?

Competition

Typical: a median of 5 bids per contract for this buyer (from 11 awards in the last 12 months).

Framework

Winning puts you on a list of suppliers the buyer can call on; it does not guarantee work. The £300,000,000 is the most the buyer expects to spend across all suppliers over the framework's life, not one contract.

What the notice says

Northern Trains Limited (NTL) intends to establish a Construction Framework Agreement to support the delivery of infrastructure works across its Train Care Centre estate and Stations. This Framework will form a key component of NTL's asset management and capital delivery strategy, enabling the efficient, consistent, and compliant delivery of works through a pre-qualified and capable supplier base. The Framework will be structured across a number of specialist lots to ensure the appropriate alignment of contractor capability with the diverse and technically complex requirements of depot environments. The proposed lots are as follows: -Lot 1- Internal Building Fit Outs Comprises of: - Fit Out…Read the full description
Northern Trains Limited (NTL) intends to establish a Construction Framework Agreement to support the delivery of infrastructure works across its Train Care Centre estate and Stations. This Framework will form a key component of NTL's asset management and capital delivery strategy, enabling the efficient, consistent, and compliant delivery of works through a pre-qualified and capable supplier base. The Framework will be structured across a number of specialist lots to ensure the appropriate alignment of contractor capability with the diverse and technically complex requirements of depot environments. The proposed lots are as follows: -Lot 1- Internal Building Fit Outs Comprises of: - Fit Out -Storage & Spares -Waste Security -Fire Systems -Heating & Ventilation -Lot 2 Access and Component Movement Solutions Comprises of: -Access Solutions -Component Removal & Movement -Lot 3 Multi-discipline Railway Solutions and Integrated Major Projects Comprises of: -Fitout -Access Solutions -Component Removal & Movement -Storage & Spares -Waste Security -Fire Systems -Heating & Ventilation -Servicing Facilities: CET, Tanking, Sanding, Fuel, Ad Blue, Screen -wash, Oils, Fluids -Cleaning -Special Tooling -Electrification Works -Track/ permanent Way -Power, Mechanical and Electrical Installation -HV -Signalling -Telecoms -Civils & Buildings construction -Geotechnical -Environmental inc. Energy Drainage -Highways/ Road Transport/ Walkways -Systems -Assurance -Lot 4 Design & Build Specialist Train Servicing and Maintenance Solutions Comprises of: -Servicing Facilities: CET, Tanking, Sanding, Fuel, Ad Blue, Screen wash, Oils, Fluids -Cleaning -Special Tooling -Environmental inc. Energy The Framework is designed to facilitate the call-off of works packages on both a programme and project basis, providing flexibility, scalability, and value for money across a geographically dispersed portfolio of operational Train Care Centres and stations. Contractors will be required to deliver works in accordance with defined performance standards, operational constraints, and all applicable statutory and regulatory obligations, including those specific to the rail environment. Suppliers appointed to the Framework will be expected to apply industry best practice and draw upon their technical expertise to achieve the following key objectives: -Quality and Value Delivery: Deliver works to a high and consistent standard, ensuring cost efficiency and demonstrable value for money across all call-off contracts. -Flexible and Scalable Delivery Model: Provide a responsive service capable of delivering a range of works packages of varying complexity, scale, and location, including the ability to support concurrent delivery across multiple depots. -Safe and Operationally Compliant Execution: Ensure all activities are undertaken in full compliance with health and safety legislation, railway standards, and NTL operational requirements, maintaining a safe working environment within live depot settings. -Operational Continuity: Deliver works in a manner that minimises disruption to depot operations and supports the continued availability and reliability of rolling stock. -Asset Integrity and Longevity: Maintain and enhance depot assets in line with statutory requirements, relevant industry standards, and manufacturer guidance to ensure durability and whole-life performance. -Performance and Continuous Improvement: Operate within a structured performance management regime, contributing to continuous improvement, innovation, and efficiencies across the Framework term. NTL is seeking to establish collaborative, long-term relationships with Framework Contractors, underpinned by strong governance, effective contract management, and a shared commitment to delivering high-quality outcomes across its works infrastructure portfolio.

How to bid

  1. Read the full notice on Find a Tender, including any tender documents it links to.
  2. Register your organisation on the Central Digital Platform (through Find a Tender) if you have not already. Suppliers need to be registered to take part in procurements under the Procurement Act 2023.
  3. Follow the submission instructions in the notice; it does not name an e-tendering portal.

Timeline

  1. Preliminary market engagement notice · UK2, notice 062387-2026
  2. Preliminary market engagement notice · UK2, notice 062552-2026

About the buyer

Procurements

72

Awards

29

Suppliers it has used most for construction

Similar open tenders

All open construction tenders
  1. Asbestos Management Framework

    Home GroupNorth East, North West, Yorkshire and the Humber, East Midlands, West Midlands, East of England, London, South East, South West, ScotlandArchitecture and engineering, Construction

    Closing soon11 hours leftExpress interest8 lotsSuitable for SMEsFramework

    £5mframework ceiling
  2. Asbestos Management Framework

    Home GroupNorth East, North West, Yorkshire and the Humber, East Midlands, West Midlands, East of England, London, South East, South West, ScotlandArchitecture and engineering, Construction

    Closing soon11 hours left8 lotsSuitable for SMEsFramework

    £5mframework ceiling
  3. Alterations and Refurbishment

    South Tyneside Borough CouncilNorth EastConstruction, Building maintenance and repairs

    Closing soon11 hours leftSuitable for SMEsSmall contract

    £81kestimated
  4. Bbv sublot 4 - hsst1020 - saltley viaduct gabion wall

    Balfour Beatty VINCI JV HS2North East, North West, Yorkshire and the Humber, East Midlands, West Midlands, East of England, London, South WestConstruction, Highways and street lighting

    Closing soon16 hours leftSuitable for SMEs

    £1mestimated
  5. Major Works 2027

    Places for People Group LimitedNorth East, North West, Yorkshire and the Humber, East Midlands, East of England, London, South East, South West, ScotlandConstruction, Building maintenance and repairs

    Closing soon5 days left33 lotsSuitable for SMEsFramework

    £163mframework ceiling

From notice 062387-2026 on Find a Tender, first published 2 July 2026, last updated 3 July 2026. We last checked for changes on 28 September 2026.