Closed

DfI TRAM Road Asset Management – Structures Framework

DfI Transport and Road Asset Management (TRAM) · Central government

In brief

DfI Transport and Road Asset Management (TRAM) was looking for suppliers for construction work. Bidding has closed and no award has been published yet.

It is a framework worth up to £57,000,000 excluding VAT: the most the buyer expects to spend across all suppliers, not one contract.

The contract runs for 4 years, starting 1 November 2026.

It is split into 4 lots, so a supplier can bid for part of the work.

The buyer says it is suitable for small and medium-sized businesses.

Built from the notice's own fields. Always check the official notice before you bid.

What the notice says

This tender notice is for the award of a public contract through an open procedure in accordance with section 20(1) and (2)(a) of the PA 2023. RAM Structures Framework will include the following work activities: A. Full or partial demolition of structures; B. Construction of new structures; C. Scour protection and maintenance works; D. Earthworks; E. Culvert upgrades/maintenance including lining and invert repair works; F. General bridge/structures maintenance; G. Working in water; H. Brickwork, blockwork and stonework; I. Structural concrete construction and/or repairs; J. Installation of precast beams or box culverts; K. Structural steelwork including repairs; L. Inspection…Read the full description
This tender notice is for the award of a public contract through an open procedure in accordance with section 20(1) and (2)(a) of the PA 2023. RAM Structures Framework will include the following work activities: A. Full or partial demolition of structures; B. Construction of new structures; C. Scour protection and maintenance works; D. Earthworks; E. Culvert upgrades/maintenance including lining and invert repair works; F. General bridge/structures maintenance; G. Working in water; H. Brickwork, blockwork and stonework; I. Structural concrete construction and/or repairs; J. Installation of precast beams or box culverts; K. Structural steelwork including repairs; L. Inspection assistance M. Works on or in the vicinity of the Northern Ireland Railways (NIR) network requiring £100,000,000 public liability insurance; N. TTM on a live trafficked public road network; O. Associated road restraint systems installation and/or repair (including RRS associated with structures works); P. Associated Ancillary Works. Further ancillary works may be asked of the successful Supplier such as: • Surface reinstatement; • Site clearance including vegetation removal; • Pressure grouting; • Sprayed concrete; • Bridge expansion joints; • Structural steel painting; • Temporary works in and/or around water and/or railways; • Waterproofing for structures The Framework will comprise of three area Lots (Work Orders valued up to £750k exc VAT). A Project Lot will be used to deliver individual NEC ECC projects covering all the geographical areas detailed below (valued between £750,001 and £5m exc VAT). Area Lots; - STF W1 – Derry and Strabane; Fermanagh & Omagh; Mid-Ulster. - STF E&S1 - Belfast; Lisburn and Castlereagh; Ards and North Down; Newry Mourne, Down and Armagh; Banbridge and Craigavon. - STF N1 - Antrim and Newtownabbey; Causeway Coast and Glens; Mid and East Antrim This Framework will deliver works from Call-Off contracts with an overall cumulative value of £57m (ex VAT) over the four-year term. If the Contracting Authority is unable, for any reason, to award a new framework or to put in place an alternative regime to replace this Framework on its termination or expiry, any Call-Off Contract established under the Framework may be extended for a further period or periods up to a maximum of 12 additional months. This may increase the overall cumulative value to £71.25m (ex VAT).

Lots

LotTradeValue
STF P1 (Projects Lot)
1 November 2026 to 31 October 2030
What this lot covers

Lot for NEC4 Call-Off Contracts awarded following a mini-competition process for Work Packages valued over £750,001 up to £5m covering all Framework contract areas.

Construction£12,000,000
STF W1 (Derry and Strabane; Fermanagh & Omagh; Mid-Ulster)
1 November 2026 to 31 October 2030
What this lot covers

Measured Term Contract for Structures works within the Derry and Strabane; Fermanagh & Omagh; Mid-Ulster contract area (Works Orders valued up to £750k). The proposed contract relates to works with a cumulative value of £15.4m (ex VAT) over a four year term. If the Contracting Authority is unable, for any reason, to award a new framework or to put in place an alternative regime to replace this Framework on its termination or expiry, any Call-Off Contract established under this Framework may be extended for a further period or periods up to a maximum of 12 additional months. This may increase the value to £19.2m (ex VAT).

Construction£19,250,000
STF E&S1 (Belfast; Lisburn and Castlereagh; Ards and North Down, Newry, Mourne and Down and Armagh, Banbridge and Craigavon)
1 November 2026 to 31 October 2030
What this lot covers

ICC Measured Term Contract for structures works within the Belfast; Lisburn and Castlereagh; Ards and North Down, Newry Mourne and Down and Armagh, Banbridge and Craigavon contract area (Works Orders valued up to £750k). The proposed contract relates to works with a cumulative value of £15.2m (ex VAT) over a four year term. If the Contracting Authority is unable, for any reason, to award a new framework or to put in place an alternative regime to replace this Framework on its termination or expiry, any Call-Off Contract established under this Framework may be extended for a further period or periods up to a maximum of 12 additional months. This may increase the value to £19m (ex VAT).

Construction£19,000,000
STF N1 (Antrim and Newtownabbey; Causeway Coast and Glens; Mid and East Antrim)
1 November 2026 to 31 October 2030
What this lot covers

ICC Measured Term Contract for structures works within the Antrim and Newtownabbey; Causeway Coast and Glens; Mid and East Antrim contract area (Works Orders valued up to £750k). The proposed contract relates to works with a cumulative value of £14.4m (ex VAT) over a four year term. If the Contracting Authority is unable, for any reason, to award a new framework or to put in place an alternative regime to replace this Framework on its termination or expiry, any Call-Off Contract established under this Framework may be extended for a further period or periods up to a maximum of 12 additional months. This may increase the value to £18m (ex VAT).

Construction£18,000,000

Timeline

  1. Preliminary market engagement notice · UK2, notice 071740-2025
  2. Preliminary market engagement notice · UK2, notice 071861-2025
  3. Tender notice · UK4, notice 039463-2026
  4. Tender notice · UK4, notice 039482-2026
  5. Tender notice · UK4, notice 047316-2026
  6. Tender notice · UK4, notice 057733-2026
  7. Tender notice · UK4, notice 060213-2026
  8. Tender notice · UK4, notice 060254-2026
  9. Tender notice · UK4, notice 061253-2026

About the buyer

Procurements

30

Awards

17

Suppliers it has used most for construction

Similar open tenders

All open construction tenders
  1. The Upgrade of Playpark at Buchannon Villas, Omagh

    Fermanagh and Omagh District CouncilNorthern IrelandConstruction

    Closing soon5 hours leftLow competitionSmall contract

    £198kestimated
  2. PRN26138 Dundonald Area Land, Design and Build - Maple and May Ltd

    Choice Housing Ireland LimitedNorthern IrelandConstruction, Architecture and engineering

    Open8 days leftSmall contract

    £3.5mestimated
  3. Design and Build Contract Commercial Road, Banbridge (Re-tender)

    Arbour Housing LtdNorthern IrelandConstruction

    Open8 days leftSmall contract

    £4mestimated
  4. P1366 - Major Adaptations for persons with a disability (MAPD) Construction Works - South Region

    Northern Ireland Housing ExecutiveNorthern IrelandConstruction

    Open8 days leftSmall contract

    £3.8mestimated
  5. Design, supply, installation and integration of solar photovoltaic systems to 150 properties across ni (re-tender)

    Arbour Housing LtdNorthern IrelandEnergy and utilities, Construction

    Open9 days leftSmall contract

    £750kestimated

From notice 071740-2025 on Find a Tender, first published 6 November 2025, last updated 30 June 2026. We last checked for changes on 28 September 2026.