DfI Transport and Road Asset Management (TRAM) awarded construction and highways work to Gibson Quarries (Banbridge) Limited, FP Mccann Limited and John Mcquillan (Contracts) Limited and 3 others on 12 May 2026.
It is a framework worth up to £180,250,000 excluding VAT: the most the buyer expects to spend across all suppliers, not one contract.
The contract runs for 4 years, starting 1 June 2026.
It is split into 5 lots, so a supplier can bid for part of the work.
The buyer says it is suitable for small and medium-sized businesses.
Built from the notice's own fields. Always check the official notice before you bid.
What the notice says
This notice replaces the previously published UK6 Contract Award Notices (Notice Identifiers: 2026/S 000-046240 & 2026/S 000-047985) to reflect an updated standstill period end date of 10 June 2026 and correct the reference to the type of framework to be established. This tender notice is for the award of a public contract through an open procedure in accordance with section 20(1) and (2)(a) of the PA 2023. RAM Surfacing Framework B will include the following work activities: delivery of two or more concurrent resurfacing schemes on a public road; laying various types of asphalt surfacing by mechanical means and by hand, reshaping of carriageways, adjustment of street furniture to new…Read the full description
Lots
| Lot | Trade | Value |
|---|---|---|
| SFB P1 (Projects Lot) 1 June 2026 to 31 May 2030 What this lot coversLot for NEC4 Call-Off Contracts awarded following a mini-competition process for Work Packages valued over £750k up to £5m covering all Framework contract areas. | Construction, Highways and street lighting | £24,000,000 |
| SFB E2 (Belfast South) 1 June 2026 to 31 May 2030 What this lot coversICC Measured Term Contract for asphalt surfacing works within the Belfast South contract area (Works Orders valued above £50k up to £750k). The proposed contract relates to works with a cumulative value of £35m (ex VAT) over a four year term. If the Contracting Authority is unable, for any reason, to award a new framework or to put in place an alternative regime to replace this Framework on its termination or expiry, any Call-Off Contract established under this Framework may be extended for a further period or periods up to a maximum of 12 additional months. This may increase the value to £43.75m (ex VAT). | Construction, Highways and street lighting | £43,750,000 |
| SFB N2 (Coleraine and Limavady) 1 June 2026 to 31 May 2030 What this lot coversICC Measured Term Contract for asphalt surfacing works within the Coleraine and Limavady contract area (Works Orders valued above £50k up to £750k). The proposed contract relates to works with a cumulative value of £34m (ex VAT) over a four year term. If the Contracting Authority is unable, for any reason, to award a new framework or to put in place an alternative regime to replace this Framework on its termination or expiry, any Call-Off Contract established under this Framework may be extended for a further period or periods up to a maximum of 12 additional months. This may increase the value to £42.5m (ex VAT). | Construction, Highways and street lighting | £42,500,000 |
| SFB W3 (Dungannon) 1 June 2026 to 31 May 2030 What this lot coversICC Measured Term Contract for asphalt surfacing works within the Dungannon contract area (Works Orders valued above £50k up to £750k). The proposed contract relates to works with a cumulative value of £29.2m (ex VAT) over a four year term. If the Contracting Authority is unable, for any reason, to award a new framework or to put in place an alternative regime to replace this Framework on its termination or expiry, any Call-Off Contract established under this Framework may be extended for a further period or periods up to a maximum of 12 additional months. This may increase the value to £36.5m (ex VAT). | Construction, Highways and street lighting | £36,500,000 |
| SFB S2 (Down) 1 June 2026 to 31 May 2030 What this lot coversICC Measured Term Contract for asphalt surfacing works within the Newry, Mourne & Down East (Down) contract area (Works Orders valued above £50k up to £750k). The proposed contract relates to works with a cumulative value of £26.8m (ex VAT) over a four year term. If the Contracting Authority is unable, for any reason, to award a new framework or to put in place an alternative regime to replace this Framework on its termination or expiry, any Call-Off Contract established under this Framework may be extended for a further period or periods up to a maximum of 12 additional months. This may increase the value to £33.5m (ex VAT). | Construction, Highways and street lighting | £33,500,000 |
Who won
| Winner | Lot | Value | Dates |
|---|---|---|---|
| Gibson Quarries (Banbridge) Limited (SME) FP Mccann Limited John Mcquillan (Contracts) Limited (SME) Patrick Keenan Quarries (SME) Northstone Materials Limited Whitemountain Quarries Ltd T/A Breedon (SME) 6 bids received | SFB P1 (Projects Lot) | £24,000,000 | Awarded 12 May 2026 |
| John Mcquillan (Contracts) Limited (SME) 5 bids received | SFB S2 (Down) | £33,500,000 | Awarded 12 May 2026 |
| Gibson Quarries (Banbridge) Limited (SME) FP Mccann Limited John Mcquillan (Contracts) Limited (SME) Patrick Keenan Quarries (SME) Northstone Materials Limited Whitemountain Quarries Ltd T/A Breedon (SME) 6 bids received | SFB P1 (Projects Lot) | £24,000,000 | Awarded 12 May 2026 |
| John Mcquillan (Contracts) Limited (SME) 5 bids received | SFB E2 (Belfast South) | £43,750,000 | Awarded 12 May 2026 |
| FP Mccann Limited 5 bids received | SFB N2 (Coleraine and Limavady) | £42,500,000 | Awarded 12 May 2026 |
| FP Mccann Limited 6 bids received | SFB W3 (Dungannon) | £36,500,000 | Awarded 12 May 2026 |
| John Mcquillan (Contracts) Limited (SME) 5 bids received | SFB S2 (Down) | £33,500,000 | Awarded 12 May 2026 |
| John Mcquillan (Contracts) Limited (SME) 5 bids received | SFB E2 (Belfast South) | £43,750,000 | Awarded 12 May 2026 |
| FP Mccann Limited 5 bids received | SFB N2 (Coleraine and Limavady) | £42,500,000 | Awarded 12 May 2026 |
| FP Mccann Limited 6 bids received | SFB W3 (Dungannon) | £36,500,000 | Awarded 12 May 2026 |
| John Mcquillan (Contracts) Limited (SME) 5 bids received | SFB S2 (Down) | £33,500,000 | Awarded 12 May 2026 |
| Gibson Quarries (Banbridge) Limited (SME) FP Mccann Limited John Mcquillan (Contracts) Limited (SME) Patrick Keenan Quarries (SME) Northstone Materials Limited Whitemountain Quarries Ltd T/A Breedon (SME) 6 bids received | SFB P1 (Projects Lot) | £24,000,000 | Awarded 12 May 2026 |
| John Mcquillan (Contracts) Limited (SME) 5 bids received | SFB E2 (Belfast South) | £43,750,000 | Awarded 12 May 2026 |
| FP Mccann Limited 5 bids received | SFB N2 (Coleraine and Limavady) | £42,500,000 | Awarded 12 May 2026 |
| FP Mccann Limited 6 bids received | SFB W3 (Dungannon) | £36,500,000 | Awarded 12 May 2026 |
Values as the award notice gives them, excluding VAT where stated.
Timeline
- Tender notice · UK4, notice 012631-2026
- Tender notice · UK4, notice 012658-2026
- Tender notice · UK4, notice 012977-2026
- Tender notice · UK4, notice 018492-2026
- Contract award notice · UK6, notice 044600-2026
- Contract award notice · UK6, notice 044869-2026
- Contract award notice · UK6, notice 045477-2026
- Contract award notice · UK6, notice 046240-2026
- Contract award notice · UK6, notice 047985-2026
- Contract award notice · UK6, notice 048160-2026
Last time this was bought
DfI TRAM T-1151 Interim Surfacing Framework
- Won by
- Gibson Quarries (Banbridge) Limited, FP Mccann Limited, John Mcquillan (Contracts) Limited, Northstone Materials Limited and 2 more
- Awarded
- 12 November 2025
- Value
- Not stated, or split across lots
Matched on DfI Transport and Road Asset Management (TRAM), the type of work and the title. Check the notice to be sure.
About the buyer
Procurements
30Awards
17Suppliers it has used most for construction
- FP Mccann Limited4 contracts
- John Mcquillan (Contracts) Limited4 contracts
- Gibson Quarries (Banbridge) Limited3 contracts
- Northstone Materials Limited2 contracts
- Patrick Keenan Quarries2 contracts
Similar open tenders
All open construction tenders- £50mestimated
- £198kestimated
- £3.2mestimated
- £3.5mestimated
- £4mestimated
From notice 012631-2026 on Find a Tender, first published 11 February 2026, last updated 22 May 2026. We last checked for changes on 28 September 2026.