AwardedAwarded 27 August 2026

DSP Phase 2

Northern Gas Networks Limited · Public undertaking

In brief

Northern Gas Networks Limited awarded construction work to T G Pipelines Limited, Stobbarts Ltd and Mole Tech Solutions Ltd on 27 August 2026.

It is a framework worth up to £60,000,000 including VAT: the most the buyer expects to spend across all suppliers, not one contract.

The contract runs for 32 months, up to 68 months with extensions, starting 1 July 2026.

The buyer says it is suitable for small and medium-sized businesses.

Built from the notice's own fields. Always check the official notice before you bid.

What the notice says

Northern Gas Networks (NGN) is initiating a Phase 2 procurement event to expand the existing Direct Service Provider (DSP) Framework, which currently runs until 2029 with options to extend. Due to capacity constraints within the current framework, additional suppliers are required to ensure sufficient resource availability across the network. This expansion is intended to supplement-not replace-the existing DSP supply. The scope of the framework agreement includes but is not limited to for both natural gas and hydrogen;  Essential Scope Requirement All mains and services replacement, abandonment, general and specific reinforcement, diversionary and connections works.  All mains work…Read the full description
Northern Gas Networks (NGN) is initiating a Phase 2 procurement event to expand the existing Direct Service Provider (DSP) Framework, which currently runs until 2029 with options to extend. Due to capacity constraints within the current framework, additional suppliers are required to ensure sufficient resource availability across the network. This expansion is intended to supplement-not replace-the existing DSP supply. The scope of the framework agreement includes but is not limited to for both natural gas and hydrogen;  Essential Scope Requirement All mains and services replacement, abandonment, general and specific reinforcement, diversionary and connections works.  All mains work comprises of laying, relaying of Polyethylene (PE) and steel mains up to 48"/1200mm diameter which are laid and tested to main laying standards, and any service up to 63mm diameter and any associated abandonment.   Service works comprises of the installation of new, or renewal and transfer of existing PE services up to 63mm diameter and Steel services up to 2" diameter.   Riser works comprises of the installation of new, or the renewal and transfer of existing PE risers up to 32mm diameter and steel risers up to 3" diameter.  Survey/Enabling works.   Low pressure connections & disconnections (e.g. PE, Steel etc.). Medium pressure connections & disconnections (e.g. PE, Steel etc.).  Intermediate pressure connections& disconnections (e.g. HDPE, Steel etc.).  New services on mains in existing properties.  Survey/enabling works includes invasive and non-invasive enabling works e.g. trial holes and camera survey. Backfill & reinstatement of all works, public & private. Support to NGN works on a planned and emergency basis for incidents e.g. severe weather, customer loss of supply and other emergency/non-emergency support, as and when required. Provide engineers/teams to support NGN in Gas Emergency & Repair Works. Scope Requirement (Desirable) Gas safety regulation cut offs. Stub ends works.  Bulk service renewal.  Live service insertion.  Service extraction.  Replacement of risers, laterals and supplies to multi occupancy buildings.  Refurbishment techniques for mains and services.  Services off mains in private (New Service/New Property).  New services on mains in existing property.  Bridge overcrossings. Provide support to NGN in backfill & reinstatement works, as and when required.   Gas appliance purge & relight, as and when required during incident support. Fuel poverty projects.  District governor installation & removal including foundations/concrete base. Specialist flow stopping techniques. Deep excavations installation & removal In additional please see the Draft Contract contained with this Tender package for full Works Information    Technical Standards and Procedures - All works MUST be carried out in compliance with Northern Gas Networks Technical Standards and in line with Northern Gas Networks Procedures.

Who won

WinnerValueDates
T G Pipelines Limited (SME)
Stobbarts Ltd
Mole Tech Solutions Ltd (SME)
£50,000,000
Awarded 27 August 2026

Values as the award notice gives them, excluding VAT where stated.

Timeline

  1. Tender notice · UK4, notice 005975-2026
  2. Contract award notice · UK6, notice 081766-2026

About the buyer

Similar open tenders

All open construction tenders
  1. NCC1164 Framework for The Provision of Repairs and Maintenance Works to Highways Bridges

    Northumberland County CouncilNorth EastConstruction

    Closing soon7 hours leftLow competition9 lotsSuitable for SMEsFramework

    £3mframework ceiling
  2. Phase 1 Junior Play Area Equipment Installation - Hawley Green

    Blackwater and Hawley Town CouncilNorth East, North West, Yorkshire and the Humber, East Midlands, West Midlands, East of England, London, South East, South WestGrounds maintenance and landscaping, Construction

    Closing soon12 hours leftSuitable for SMEsSmall contract

    £75kestimated
  3. Flooring Measured Term Contract

    City Hospitals Independent Commercial Enterprises LimitedNorth EastConstruction, Building maintenance and repairs

    Closing soon19 hours leftLow competition2 lotsSuitable for SMEsSmall contract

    £400kestimated
  4. Vehicle Restraint Systems

    The Association of North East Councils LimitedNorth EastConstruction, Highways and street lighting

    Closing soon2 days left3 lotsSuitable for SMEsFramework

    £50mframework ceiling
  5. Steel Fabrications

    Northern Gas Networks LimitedNorth East, East of EnglandConstruction, Building maintenance and repairs

    Closing soon3 days left2 lotsSuitable for SMEsFramework

    £8mframework ceiling

From notice 005975-2026 on Find a Tender, first published 22 January 2026, last updated 27 August 2026. We last checked for changes on 28 September 2026.