AwardedAwarded 6 February 2026
Emergency Call Out and Minor Work (ECOMW) Framework 2025
Mining Remediation Authority · Public body
In brief
Mining Remediation Authority awarded construction work to Bethell Construction Limited, Amalgamated Construction Ltd and Jim Davies Civil Engineering Ltd and 7 others on 6 February 2026.
Built from the notice's own fields. Always check the official notice before you bid.
What the notice says
The Emergency Call Out and Minor Work (ECOMW) Framework 2025 covers emergency response and minor civil engineering works across multiple regions. It is structured under NEC4 ECSC , and supports flexible call-off arrangements for urgent and planned interventions. (a) Emergency Call-Out (ECO): This involves the immediate response to public safety incidents, such as mine shaft collapses or ground subsidence, requiring on-site attendance within 4 hours to secure and make the area safe. (b) Minor Works and Subsidence Repairs: These are planned follow-up works to investigate, repair, and restore areas affected by mining hazards, including structural repairs, ground stabilisation, and…Read the full description
The Emergency Call Out and Minor Work (ECOMW) Framework 2025 covers emergency response and minor civil engineering works across multiple regions. It is structured under NEC4 ECSC , and supports flexible call-off arrangements for urgent and planned interventions.
(a) Emergency Call-Out (ECO): This involves the immediate response to public safety incidents, such as mine shaft collapses or ground subsidence, requiring on-site attendance within 4 hours to secure and make the area safe.
(b) Minor Works and Subsidence Repairs: These are planned follow-up works to investigate, repair, and restore areas affected by mining hazards, including structural repairs, ground stabilisation, and reinstatement of land or property.
Upon notification of an incident, hazard, or damage report by a stakeholder, the Authority will assess and categorize the issue as either:
• An Emergency Call-Out, or
• Minor Works and Subsidence Repairs
The available regions are:
• Scotland (East and West)
• Northumberland, Durham, and Cumbria
• North Wales, Cheshire, Lancashire, North, South, and West Yorkshire
• Nottinghamshire, Derbyshire, Leicestershire, Staffordshire, Shropshire, West Midlands, Warwickshire, Herefordshire, and Worcestershire
• Somerset, South Gloucestershire, Bristol, South Wales, Pembrokeshire, and North Gloucestershire (Forest of Dean)
Procurement Process:
• Quality criteria total 100% (Quality, Social Value, Sustainability, Fraud & Safeguarding).
• Price evaluated via PPQP
Who won
| Winner | Value | Dates |
|---|---|---|
| Bethell Construction Limited Amalgamated Construction Ltd Jim Davies Civil Engineering Ltd (SME) Luddon Construction Limited (SME) Alun Griffiths (Contractors) Limited (SME) Thomas Menzies (Builders) Limited (SME) Nal Plant Limited (SME) Sweeting Brothers (Land Drainage) Limited (SME) Llettyshenkin Construction Company Limited (SME) Alliance Contracting Solutions Limited (SME) 19 bids received | £19,500,000 | Awarded 27 January 2026 1 March 2026 to 30 November 2029 |
Values as the award notice gives them, excluding VAT where stated.
Timeline
- Contract award notice · UK6, notice 007074-2026
- Contract details notice · UK7, notice 020168-2026
About the buyer
Mining Remediation AuthorityLast 12 months
Procurements
73Awards
58Suppliers it has used most for construction
- Jim Davies Civil Engineering Ltd4 contracts
- Llettyshenkin Construction Company Limited4 contracts
- Nal Plant Limited4 contracts
- Bethell Construction Limited3 contracts
- Thomas Menzies (Builders) Limited3 contracts
Similar open tenders
All open construction tenders- £75kestimated
- £400kestimated
- £50mframework ceiling
- £8mframework ceiling
- £160kestimated
From notice 007074-2026 on Find a Tender, first published 27 January 2026, last updated 6 March 2026. We last checked for changes on 28 September 2026.