For the provisions of Mobile Plant RRC
LondonEnergy Ltd · Private utility
In brief
LondonEnergy Ltd awarded construction and vehicle and fleet work to Stennetts Ltd on 26 August 2026.
The notice gives a value of £750,000 excluding VAT.
The contract runs for 3 years, up to 5 years with extensions, starting 1 October 2026.
It is split into 3 lots, so a supplier can bid for part of the work.
Built from the notice's own fields. Always check the official notice before you bid.
What the notice says
Correction to the previously published UK6 Contract Award Notice. The value of Lot 3 was inadvertently omitted from the total contract value. Total contract value has been corrected of Lots 1, 2 and 3 Lot 1: Mobile Plant Requirements (RRC Sites) All mobile plants must be suitable for waste handling operations and include: CCTV/reversing camera system with full visibility coverage. Amber beacon, green seatbelt warning light, audible reverse alarm, reversing lights, and red seatbelts. Automatic engine idle shutdown after 3 minutes with warning. Air pre-cleaner and HEPA 0.3 micron (or better) cab filtration suitable for dusty and biohazard environments. Windscreen protection cage with hinged…Read the full description
Lots
| Lot | Trade | Value |
|---|---|---|
| Requirements for mobile plants at LondonEnergy RRC's 1 October 2026 to 1 October 2029 What this lot coversAll mobile plants must meet waste specification requirements. All Mobile Plants are to be fitted with the following: • Reversing/CCTV camera. (There are several systems commonly used to improve all round visibility not just reversing, please detail what your system will provide and how it meets industry best practise.) • Amber warning beacon, green seat belt warning light, audible reversing warning & standard reversing lights, red seat belts. • An automated engine cut off that shall activate with prior warning if the plant is left in idle mode for a duration longer than 3 minutes. • Air pre-cleaner (preferably cyclone type) and HEPA 0.3 micron cab filters (or better) to deal with dusty working environment. When proposing the type of filters suppliers must take into account the environment and potential Biohazards; please detail what levels of protection the filters will give and the WEL rating. LEL actively encourage suppliers to visit each site to view the operation and confirm if the systems specify will meet or exceed the needs of each mobile plant item. • Windscreen cage protection to be fitted to fully protect the operator from debris falling from the bucket whilst maintaining maximum all-round visibility and should be hinged to allow for access to clean glazing. • Auto-lube on board dispenser for difficult to access greasing points, manual lubrication to ground standing operator greasing points. • To have restricted access to gear selection (1st & 2nd only) or a speed limiter set to a maximum of 10MPH. • On-board automated fire suppression system to tackle both engine fires and fires around the bodywork of the mobile plant • A separate cost for a 12-volt electrical supply to be fitted to operator cabs should be supplied if the plant specified does not have this as standard, this shall allow for retro installation/fitting of LEL owned radio equipment by LEL or their agents. • Anti-theft devices • Additional guarding around hydraulic hoses to minimise risk of wear and tear when in contact with waste. • All plants must work in all weather conditions, specifically dusty, hot, and humid atmospheres , please reference any specific items such as wide core radiators and/or reversing radiator fan cooling systems that are fitted to all mobile plants being specified by yourselves. All mobile plant must be suitable for working outside continuously. LEL reserve the right to install proximity sensors or any other H&S equipment on the machines supplied, prior notification will be provided. - 5 (6) x material handling machines (Equivalent to LH 18 M Liebherr) • Fitted with a suitable waste rehandling grab or their equivalent. Supplied on solid tyres. • Rehandling grab to be supplied with 40mm thickness one piece wear edge sets. The engineering specification and source of manufacture is to be supplied to LEL. • Waste rehandling grab to be configured to have the open/close and rotation circuits operated by foot pedals on the 3rd line circuit and not electrical switching on the joystick handles. The open/close to be on the right-hand pedal with a backward movement to close and forward to open configuration. The rotation on the left-hand pedal with a clockwise rotation in forward position and anticlockwise in the backward position. Grab to be permanently fitted to the dipper arm, quick hitch systems are not required. • To be fitted with long arms. • To be fitted with machine stabilisers • To have a raising cab Estimated usage per annum is 1400hrs (+/- 10%). | — | £250,000 |
| Maintenance 1 October 2026 to 1 October 2029 What this lot coversLot 2 Maintenance includes: - Servicing - Electrical upgrades - Contractor to manage servicing and planned maintenance, but LEL need to know 14 days in advance in order to plan the operation around down-time. - Replacement machinery is to be provided if it is to be out of service for longer than 24hrs due to parts or engineer availability - Replacement machinery is to be provided if it is required to be taken off site for repairs/maintenance for longer than 24hrs. Alternatively, haulage provided to move a piece of mobile plant from one site to another if in agreement with LEL and is operational suitable. Wear & tear to be included in contract | Construction | £250,000 |
| Maintenance includes 1 October 2026 to 1 October 2029 What this lot coversLot 3 Maintenance includes: - Tyres - Tail blades - There must be service for reactive maintenance 7 days a week, incl. plant break-down and attendance within 90mins of fault notification. - All repairs are to be completed during site operational hours (08:30-16:30 Monday-Sunday) - Suppliers are welcome to bid for lots 1, 2 and/or 3. Please include the different prices for each lot in the pricing schedule below (section 3). | Construction | £250,000 |
Who won
| Winner | Lot | Value | Dates |
|---|---|---|---|
| Stennetts Ltd (SME) | Requirements for mobile plants at LondonEnergy RRC's, Maintenance, Maintenance includes | £830,720,000 | Awarded 26 August 2026 |
| Stennetts Ltd (SME) | Requirements for mobile plants at LondonEnergy RRC's, Maintenance, Maintenance includes | £850,700 | Awarded 26 August 2026 |
Values as the award notice gives them, excluding VAT where stated.
Timeline
- Tender notice · UK4, notice 061019-2026
- Contract award notice · UK6, notice 081668-2026
- Contract award notice · UK6, notice 081732-2026
About the buyer
Procurements
16Awards
7Suppliers it has used most for construction
- Stennetts Ltd1 contract
- W.H. Scott & Son (Engineers) Limited1 contract
Similar open tenders
All open construction tenders- £105kestimated
- £75kestimated
- £15mestimated
- £100kestimated
- £275kestimated
From notice 061019-2026 on Find a Tender, first published 30 June 2026, last updated 27 August 2026. We last checked for changes on 28 September 2026.