AwardedAwarded 15 January 2026
Forest Road, Lydney Geotechnical Stabilisation
Gloucestershire County Council · Local authority
In brief
Gloucestershire County Council awarded construction work to Montel Civil Engineering Limited on 15 January 2026.
The notice gives a value of £1,300,000 excluding VAT.
The contract runs for 6 months, starting 9 February 2026.
The buyer says it is suitable for small and medium-sized businesses.
Built from the notice's own fields. Always check the official notice before you bid.
What the notice says
The site is located on the B4234 approximately 1.8km Northwest of the town of Lydney, Gloucestershire. The B4234 carriageway is constructed on sidelong ground and runs parallel to the River Lyd. The River Lyd runs approximately 8m below the road level. The site was identified to have defects in 2023 and has been subject to regular monitoring. The defects noted consisted of carriageway cracking, subsidence, leaning trees associated with lower slope instability and blocked gullies. A landslip occurred over a 20m length of earthwork adjacent to New Road in late 2023. The carriageway is showing signs of instability with cracking evident, and a steep face is now present at the edge of the…Read the full description
The site is located on the B4234 approximately 1.8km Northwest of the town of Lydney, Gloucestershire. The B4234 carriageway is constructed on sidelong ground and runs parallel to the River Lyd. The River Lyd runs approximately 8m below the road level. The site was identified to have defects in 2023 and has been subject to regular monitoring.
The defects noted consisted of carriageway cracking, subsidence, leaning trees associated with lower slope instability and blocked gullies. A landslip occurred over a 20m length of earthwork adjacent to New Road in late 2023. The carriageway is showing signs of instability with cracking evident, and a steep face is now present at the edge of the westbound running lane.
The client is looking for a Principal Contractor to deliver the construction phase of this scheme.
Summary of Construction Phase key deliverables are as follows:
- Provision of suitable traffic management during construction works, including full road closure and signposted diversions.
- Installation of sheet piled retaining wall along an extent of 43 m - 1.6 m from carriageway edge.
- Pile lengths will vary with rockhead depth, typically reaching 8.0 m. Piles will be driven to the designed toe level and cut flush with adjacent ground.
- Construction of new drainage system including installation of a concrete bag headwall outfall within the embankment.
- Highways reconstruction including plaining and overlay.
- Installation of a VRS barrier system and wooden fencing over an extent of 131 m.
- Traffic signs, kerbing, and road markings.
- Coordination with BT utility diversions and protection works.
A summary of the outline programme is shown below:
Anticipated Works Start Date: Monday 9th February 2026
Completion: Friday 7th August 2026
Overall Duration: 26 Weeks
The proposed procurement route will be a single stage (Open Procedure) using the NEC4 ECC form of Contract, Option A Priced Contract with Activity Schedule.
Who won
| Winner | Value | Dates |
|---|---|---|
| Montel Civil Engineering Limited (SME) | £929,704 | 9 February 2026 to 7 August 2026 |
Values as the award notice gives them, excluding VAT where stated.
Timeline
- Tender notice · UK4, notice 063933-2025
- Contract details notice · UK7, notice 019562-2026
About the buyer
Gloucestershire County CouncilLast 12 months
Procurements
134Awards
52Suppliers it has used most for construction
- Montel Civil Engineering Limited3 contracts
- Alun Griffiths (Contractors) Limited1 contract
- Centregreat Limited1 contract
- Enovert South Limited1 contract
- Fitzgerald Contractors Limited1 contract
Similar open tenders
All open construction tenders- £75kestimated
- £92.8mestimated
- £4.4mestimated
- £160kestimated
- £180kestimated
From notice 063933-2025 on Find a Tender, first published 9 October 2025, last updated 4 March 2026. We last checked for changes on 28 September 2026.