Framework Agreement for Construction and Infrastructure Works (Minor, Major and Depot Projects)
First Greater Western Limited · Private utility
In brief
First Greater Western Limited was looking for suppliers for construction work. Bidding has closed and no award has been published yet.
It is a framework worth up to £90,000,000 excluding VAT: the most the buyer expects to spend across all suppliers, not one contract.
The contract runs for 3 years, up to 4 years with extensions, starting 1 April 2026.
It is split into 3 lots, so a supplier can bid for part of the work.
The buyer says it is suitable for small and medium-sized businesses.
Built from the notice's own fields. Always check the official notice before you bid.
What the notice says
Lots
| Lot | Trade | Value |
|---|---|---|
| Minor Works 1 April 2026 to 31 March 2029 What this lot coversGeneral minor construction, refurbishment, and maintenance works across our network of station and staff accommodation. Typical works may include: General building repairs, redecoration, and refurbishments. Small-scale structural alterations, roofing, and drainage works. Minor extensions, fit-outs, or internal layout changes. Mechanical and electrical upgrades associated with minor works. External works such as fencing, paving, and minor civil engineering. Projects under this lot will generally be short duration, low complexity, and delivered in live operational environments where flexibility and responsiveness are essential. | Construction | £18,000,000 |
| Stations Major Works 1 April 2026 to 31 March 2029 What this lot coversSignificant upgrades, refurbishments, and new build works at station locations. Typical works may include: Station building refurbishments and structural alterations. Platform extensions, canopies, and accessibility improvements. Construction of new station buildings, facilities, or extensions. Major mechanical, electrical, and public realm works at stations. Upgrades to passenger areas, retail units, and back-of-house facilities. Projects in this lot will often be multi-disciplinary and may require detailed design input, stakeholder coordination, and work within live passenger environments. | Construction | £35,000,000 |
| Depot Works 1 April 2026 to 31 March 2029 What this lot coversInfrastructure improvements, building works, and specialist upgrades at depot facilities. Typical works may include: Construction, refurbishment, or extension of depot buildings and workshops. Infrastructure upgrades such as drainage, hardstanding, and utilities. Specialist rail depot systems Office and welfare accommodation refurbishments within depot environments. Structural, mechanical, or electrical improvements to support operational efficiency. Projects under this lot will require careful planning and delivery in live operational and safety-critical environments, often with restricted access and coordination with depot management teams. | Construction | £35,000,000 |
Timeline
- Tender notice · UK4, notice 072199-2025
About the buyer
Procurements
54Awards
22Suppliers it has used most for construction
- Emeg Group Limited1 contract
- Trans Data Management Ltd1 contract
Similar open tenders
All open construction tenders- £15mestimated
- £100kestimated
- £275kestimated
- £8mestimated
- £160kestimated
From notice 072199-2025 on Find a Tender, first published 7 November 2025. We last checked for changes on 27 September 2026.