AwardedAwarded 14 October 2026

Framework Agreement for Construction and Infrastructure Works (Minor, Major and Depot Projects)

First Greater Western Limited · Private utility

In brief

First Greater Western Limited awarded construction work to Amalgamated Construction Ltd, VINCI Construction UK Limited trading as VINCI Facilities and Construction Marine Limited and 13 others on 14 October 2026.

It is a framework worth up to £90,000,000 excluding VAT: the most the buyer expects to spend across all suppliers, not one contract.

The contract runs for 3 years, up to 4 years with extensions, starting 1 April 2026.

It is split into 3 lots, so a supplier can bid for part of the work.

The buyer says it is suitable for small and medium-sized businesses.

Built from the notice's own fields. Always check the official notice before you bid.

What the notice says

This procurement process is being advertised and run by First Greater Western limited on its own behalf and on behalf of the successor operator of the rail passenger transport services in respect of Great Western Railway (GWR). That successor operator will be a public sector company, is expected to be a wholly owned subsidiary of DfT OLR Holdings Limited and will be ultimately owned by the Secretary of State for Transport. The date for transfer of the current operations to the successor operator is not yet confirmed. Where the transfer is completed before contract award under this procurement process, the successor operator may elect (but will not be obliged) to carry on with this…Read the full description
This procurement process is being advertised and run by First Greater Western limited on its own behalf and on behalf of the successor operator of the rail passenger transport services in respect of Great Western Railway (GWR). That successor operator will be a public sector company, is expected to be a wholly owned subsidiary of DfT OLR Holdings Limited and will be ultimately owned by the Secretary of State for Transport. The date for transfer of the current operations to the successor operator is not yet confirmed. Where the transfer is completed before contract award under this procurement process, the successor operator may elect (but will not be obliged) to carry on with this procurement process in place of GWR, by taking on the role of contracting entity from the date of completion of the transfer (with this notice and all other procurement documents to be interpreted accordingly). Where the transfer is not yet completed by the time of contract award, contractual rights may be included in the contractual arrangements to enable transfer to the successor operator. Bidders should note that this procurement process (if ongoing), or any awarded contract, may be included in a transfer scheme made by the Secretary of State under section 12 of the Railways Act 2005, or the transfer may be effected outside of, or separate from, such a scheme. If transfer takes place before the contract award the successor operator shall assume all the rights of the Client set out in this document. All references to the Client shall be deemed to refer to the successor operator for the purposes of this procurement and the successor operator shall be entitled to continue or terminate this procurement as if it was involved. GWR is stablishing a Framework Agreement for the delivery of construction and infrastructure works across its property and depot estates. The framework will cover a broad range of project types including minor building works, refurbishments, renewals, upgrades, and new construction at stations, depots, and operational facilities. The framework will be divided into three lots: Lot 1 - Minor Works: General building, refurbishment, and maintenance. Lot 2 - Stations Major Works: Station upgrade and construction projects. Lot 3 - Depot Works: Building and infrastructure improvements at depot sites The framework will operate for a period of 3 years with an optional 1-year extension (3 + 1 years) and will be structured as an open framework, allowing supplier refresh during its lifetime. Works will be called off under adapted JCT contract forms (Minor Works, Intermediate with Contractor's Design, or Design & Build, as applicable) and will be awarded via mini-competitions. All works must be delivered to the required safety, quality, and environmental standards, ensuring minimal disruption to operational sites and alignment with the contracting authority's sustainability objectives.

Lots

LotTradeValue
Minor Works
1 April 2026 to 31 March 2029
What this lot covers

General minor construction, refurbishment, and maintenance works across our network of station and staff accommodation. Typical works may include: General building repairs, redecoration, and refurbishments. Small-scale structural alterations, roofing, and drainage works. Minor extensions, fit-outs, or internal layout changes. Mechanical and electrical upgrades associated with minor works. External works such as fencing, paving, and minor civil engineering. Projects under this lot will generally be short duration, low complexity, and delivered in live operational environments where flexibility and responsiveness are essential.

Construction£18,000,000
Stations Major Works
1 April 2026 to 31 March 2029
What this lot covers

Significant upgrades, refurbishments, and new build works at station locations. Typical works may include: Station building refurbishments and structural alterations. Platform extensions, canopies, and accessibility improvements. Construction of new station buildings, facilities, or extensions. Major mechanical, electrical, and public realm works at stations. Upgrades to passenger areas, retail units, and back-of-house facilities. Projects in this lot will often be multi-disciplinary and may require detailed design input, stakeholder coordination, and work within live passenger environments.

Construction£35,000,000
Depot Works
1 April 2026 to 31 March 2029
What this lot covers

Infrastructure improvements, building works, and specialist upgrades at depot facilities. Typical works may include: Construction, refurbishment, or extension of depot buildings and workshops. Infrastructure upgrades such as drainage, hardstanding, and utilities. Specialist rail depot systems Office and welfare accommodation refurbishments within depot environments. Structural, mechanical, or electrical improvements to support operational efficiency. Projects under this lot will require careful planning and delivery in live operational and safety-critical environments, often with restricted access and coordination with depot management teams.

Construction£35,000,000

Who won

WinnerLotValueDates
Amalgamated Construction LtdMinor Works, Stations Major Works, Depot Works£90,000,000
Awarded 14 October 2026
VINCI Construction UK Limited trading as VINCI FacilitiesMinor Works, Depot Works£90,000,000
Awarded 14 October 2026
Construction Marine Limited (SME)Stations Major Works, Depot Works£90,000,000
Awarded 14 October 2026
MLG UK Limited (SME)Stations Major Works, Depot Works£90,000,000
Awarded 14 October 2026
International Workplace Solutions Ltd (SME)Depot Works£90,000,000
Awarded 14 October 2026
Spencer Rail Engineering LimitedDepot Works£90,000,000
Awarded 14 October 2026
Trackwork LimitedDepot Works£90,000,000
Awarded 14 October 2026
Emeg Group Limited (SME)Depot Works£90,000,000
Awarded 14 October 2026
CK Rail Solutions Ltd (SME)Minor Works£90,000,000
Awarded 14 October 2026
Centregreat Rail Ltd (SME)Minor Works, Stations Major Works£90,000,000
Awarded 14 October 2026
Gloster MEP Limited (SME)Minor Works, Stations Major Works£90,000,000
Awarded 14 October 2026
Hollywell Building services Limited (SME)Minor Works, Stations Major Works, Depot Works£90,000,000
Awarded 14 October 2026
Honeyfield Property Services Ltd (SME)Minor Works, Stations Major Works£90,000,000
Awarded 14 October 2026
Jamieson Contracting (NW) Limited (SME)Minor Works, Stations Major Works, Depot Works£90,000,000
Awarded 14 October 2026
Walker Construction (U.K.) Limited (SME)Minor Works, Stations Major Works, Depot Works£90,000,000
Awarded 14 October 2026
Railscape Limited (SME)Minor Works£90,000,000
Awarded 14 October 2026

Values as the award notice gives them, excluding VAT where stated.

Timeline

  1. Tender notice · UK4, notice 072199-2025
  2. Contract award notice · UK6, notice 105378-2026

About the buyer

Similar open tenders

All open construction tenders
  1. Care and Support Investment Programme(CSIP) Refurbishment Works at 2 Arlington Road

    The Riverside Group LimitedLondonConstruction, Building maintenance and repairs

    Closing soon2 hours leftSmall contract

    Value not stated
  2. Asbestos Management Framework

    Home GroupNorth East, North West, Yorkshire and the Humber, East Midlands, West Midlands, East of England, London, South East, South West, ScotlandArchitecture and engineering, Construction

    Closing soon2 hours leftExpress interest8 lotsSuitable for SMEsFramework

    £5mframework ceiling
  3. Asbestos Management Framework

    Home GroupNorth East, North West, Yorkshire and the Humber, East Midlands, West Midlands, East of England, London, South East, South West, ScotlandArchitecture and engineering, Construction

    Closing soon2 hours left8 lotsSuitable for SMEsFramework

    £5mframework ceiling
  4. Bbv sublot 4 - hsst1020 - saltley viaduct gabion wall

    Balfour Beatty VINCI JV HS2North East, North West, Yorkshire and the Humber, East Midlands, West Midlands, East of England, London, South WestConstruction, Highways and street lighting

    Closing soon7 hours leftSuitable for SMEs

    £1mestimated
  5. Hendon Library: School Libraries and Resources Service (SLRS) refit 2026/27

    London Borough of BarnetLondonFurniture, Construction

    Closing soon3 days leftSuitable for SMEsSmall contract

    £60kestimated

From notice 072199-2025 on Find a Tender, first published 7 November 2025, last updated 5 November 2026. We last checked for changes on 5 November 2026.