Upcoming
GMCA 2171 Strategic Environmental Assessment
Greater Manchester Combined Authority · Local authority
In brief
Greater Manchester Combined Authority has announced plans to buy environmental work. This is an early notice: there is nothing to bid on yet, but it tells you a tender may follow.
The estimated value is £100,000 excluding VAT.
The contract runs for 2 years, starting 1 February 2027.
The buyer says it is suitable for small and medium-sized businesses.
Built from the notice's own fields. Always check the official notice before you bid.
Can I win this?
Competition
Typical: a median of 4 bids per contract for this buyer (from 23 awards in the last 12 months).
What the notice says
Strategic Environmental Assessment (SEA) - Greater Manchester Joint Minerals and Waste Plan The Greater Manchester Combined Authority is undertaking an expression of interest for the following: Strategic Environmental Assessment (SEA) to support the forthcoming Greater Manchester Joint Minerals and Waste Plan (GMJMWP). The 10 Greater Manchester authorities (Bolton, Bury, Manchester, Oldham, Rochdale, Salford, Stockport, Tameside, Trafford and Wigan) are working together to produce the Greater Manchester Joint Minerals and Waste Plan. This will be a single plan to replace the existing Minerals Plan and Waste Plan, which were adopted in 2013 and 2012 respectively. The plan will be developed…Read the full description
Strategic Environmental Assessment (SEA) - Greater Manchester Joint Minerals and Waste Plan
The Greater Manchester Combined Authority is undertaking an expression of interest for the following:
Strategic Environmental Assessment (SEA) to support the forthcoming Greater Manchester Joint Minerals and Waste Plan (GMJMWP).
The 10 Greater Manchester authorities (Bolton, Bury, Manchester, Oldham, Rochdale, Salford, Stockport, Tameside, Trafford and Wigan) are working together to produce the Greater Manchester Joint Minerals and Waste Plan. This will be a single plan to replace the existing Minerals Plan and Waste Plan, which were adopted in 2013 and 2012 respectively. The plan will be developed working in partnership with local authorities and a specialist third-party and will be produced in line with the Town and Country Planning (Local Planning)(England) Regulations 2026 under the new plan-making system. The SEA will be required as part of this work, to identify any environmental effects as a result of implementing the plan, and any reasonable alternatives. The timetable for the GMJMWP is to be agreed but, under transitional arrangements set out in the 2026 Regulations, the 10 authorities are required to give notice of commencement of plan making before 31st December 2026 and to pass through Gateway 1 by 30th April 2027.
The proposed commission comprises the following activities:
- Strategic Environmental Assessment for Greater Manchester Joint Minerals and Waste Plan
- Preparation and consultation on the scope and level of detail of the SEA Environmental Report. This will run at the same time as the consultation on the proposed minerals and waste plan content and evidence.
- Preparation and consultation on the proposed SEA Environmental Report. This will run at the same time as the as consultation on the proposed minerals and waste plan.
- Review and finalise SEA Environmental Report prior to ‘Gateway 3’.
How to bid
- Read the full notice on Find a Tender, including any tender documents it links to.
- Register your organisation on the Central Digital Platform (through Find a Tender) if you have not already. Suppliers need to be registered to take part in procurements under the Procurement Act 2023.
- Follow the submission instructions in the notice; it does not name an e-tendering portal.
Timeline
- Preliminary market engagement notice · UK2, notice 105209-2026
About the buyer
Greater Manchester Combined AuthorityLast 12 months
Procurements
300Awards
202Suppliers it has used most for environmental
- Levitt Bernstein Associates Ltd1 contract
Similar open tenders
All open environmental tenders- £1mestimated
- £40mframework ceiling
- £300mestimated
- £600mframework ceiling
- £25mframework ceiling
From notice 105209-2026 on Find a Tender, first published 5 November 2026. We last checked for changes on 5 November 2026.