Open35 days left · closes midday, Friday 18 December 2026

Kitchen Replacement Programme

Vico Homes Limited · Housing

In brief

Vico Homes Limited is looking for suppliers for construction and building maintenance work (Yorkshire and the Humber).

The estimated value is £110,180,000 excluding VAT.

The contract runs for 4 years, up to 5 years with extensions, starting 1 February 2027.

It is split into 3 lots, so a supplier can bid for part of the work.

The buyer says it is suitable for small and medium-sized businesses.

Bids close at midday, Friday 18 December 2026.

Built from the notice's own fields. Always check the official notice before you bid.

Can I win this?

Key dates

Questions by
midday, Friday 11 December 2026
Bids by
midday, Friday 18 December 2026

How bids are scored

Price 60% · Quality 40%

Price matters most. Expect to compete hard on cost.

Competition

Usually high: a median of 7 bids per contract for this buyer (from 5 awards in the last 12 months).

What the notice says

The specifications support the planned replacement of kitchens in Vico Homes properties and are intended to form schedules to the contract. The base requirement is a like-for-like replacement of existing kitchens ('kitchen out, kitchen in'), subject always to statutory compliance, safety, resident need and any approved design change. The specifications shall be read together with the Schedule of Rates, contract documents, product schedules and any other schedules forming part of the contract. The Contractor shall act as Principal Contractor for the works and shall discharge all associated duties under CDM and applicable Building Regulations requirements. Vico Homes shall identify the…Read the full description
The specifications support the planned replacement of kitchens in Vico Homes properties and are intended to form schedules to the contract. The base requirement is a like-for-like replacement of existing kitchens ('kitchen out, kitchen in'), subject always to statutory compliance, safety, resident need and any approved design change. The specifications shall be read together with the Schedule of Rates, contract documents, product schedules and any other schedules forming part of the contract. The Contractor shall act as Principal Contractor for the works and shall discharge all associated duties under CDM and applicable Building Regulations requirements. Vico Homes shall identify the appointed CDM Principal Designer and any duties expressly retained by Vico Homes within the contract documents. The Contractor shall be responsible for coordinating and completing the works required to deliver a complete, safe, compliant and habitable kitchen replacement, except where this specification expressly states that a duty, approval, decision or risk is retained by Vico Homes. 1.1 Programme Delivery and Model Properties are grouped into defined geographical areas (Lots) and a contractor will be appointed to each Lot. Vico Homes will provide the successful Contractors with the initial property address lists of their Lot during the first year of the contract. The volume of each Lot is anticipated to increase per annum as indicated in Appendix B Specification The Contractor shall be responsible for using the address list to develop, maintain and manage its own delivery programme for the allocated geographical area, including but not limited to; Customer appointments, Survey sequencing, Asbestos surveys/ removals, Kitchen surveys, Agreeing Tenant choice capture, Arrange kitchens manufacture and order via Jewson partnership Solutions (JPS), installation dates, resource planning, geographical batching and backfill arrangements. Vico Homes shall provide sufficient validated backfill properties where available to support continuity of delivery. Where properties are refused, unavailable or delayed, the Contractor shall re sequence its programme and use the agreed backfill process to minimise impact on the annual target, monthly delivery profile and weekly delivery targets. For year 1 kitchen and asbestos surveys have been completed for the majority of properties and will be provided to the contractor, Year 2 onwards will follow the above model. i.e the Contractor will be responsible for the full process. Materials All kitchen orders, including kitchen packs and associated components shall be processed through Symphony via Vico Homes Stores function. The contractor shall be responsible for ensuring that orders are placed in sufficient time to meet program requirements. All materials ordered through Stores shall be delivered to and stored within the contractors' own facilities. The contractor shall be responsible for the receipt, inspection, security, storage and stock management of all materials upon delivery. Kitchen packs, inclusive of base, sink, wall units and worktop materials shall be ordered through Stores, however all other items required to complete the works shall be supplied by the contractor at their own cost and be deemed to be included within the tendered rates. The Stores function is operated and managed by Jewson Partnership Solutions (JPS). As a condition of participation in this contract, Contractors must hold and maintain an approved credit facility with JPS sufficient to support the ongoing delivery of the services and works required under the contract. The work will be split up into the following geographical LOT's LOT 1 - Wakefield South - WF1, WF2, WF4 LOT 2 - Wakefield North - WF3, WF5, WF6, WF10, WF11 LOT 3 - Wakefield East - WF7, WF8, WF9 For clarity Vico will maintain an in-house delivery team operating in the WF7, WF8 and WF10 postcodes, the kitchen volumes for internal delivery have already been removed from the anticipated volumes of Lot 2 and Lot 3.

Should I bid?

Tick what applies to you. Nothing is saved.

How to bid

  1. Read the full notice on Find a Tender, including any tender documents it links to.
  2. Register your organisation on the Central Digital Platform (through Find a Tender) if you have not already. Suppliers need to be registered to take part in procurements under the Procurement Act 2023.
  3. Submit your bid through the buyer's e-tendering portal: procontract.due-north.com.
  4. Send clarification questions before midday, Friday 11 December 2026.
  5. Make sure your bid arrives before midday, Friday 18 December 2026. Late bids are usually rejected.

Lots

LotTradeValue
Wakefield South - WF1, WF2, WF4
1 February 2027 to 31 January 2031
What this lot covers

LOT 1 - Wakefield South - WF1, WF2, WF4.

Construction, Building maintenance and repairs£42,340,000
Wakefield North - WF3, WF5, WF6, WF10, WF11
1 February 2027 to 31 January 2031
What this lot covers

LOT 2 - Wakefield North - WF3, WF5, WF6, WF10, WF11

Construction, Building maintenance and repairs£34,780,000
Wakefield East - WF7, WF8, WF9
1 February 2027 to 31 January 2031
What this lot covers

LOT 3 - Wakefield East - WF7, WF8, WF9

Construction, Building maintenance and repairs£33,060,000

Timeline

  1. Preliminary market engagement notice · UK2, notice 065286-2026
  2. Tender notice · UK4, notice 104907-2026

Last time this was bought

Component Replacement Programme

Awarded
16 May 2026
Value
Not stated, or split across lots
Contract ends
15 May 2027

Matched on Vico Homes Limited, the type of work and the title; it may be a related contract rather than the same one. Check the notice to be sure.

About the buyer

Similar open tenders

All open construction tenders
  1. Public sector decarbonisation scheme 4 - design and installation of air cource heat pumps – brighouse swimming pool

    The Borough Council of CalderdaleYorkshire and the HumberConstruction

    Closing soon12 hours leftSuitable for SMEsSmall contract

    £1.3mestimated
  2. Asbestos Management Framework

    Home GroupNorth East, North West, Yorkshire and the Humber, East Midlands, West Midlands, East of England, London, South East, South West, ScotlandArchitecture and engineering, Construction

    Closing soon12 hours leftExpress interest8 lotsSuitable for SMEsFramework

    £5mframework ceiling
  3. Asbestos Management Framework

    Home GroupNorth East, North West, Yorkshire and the Humber, East Midlands, West Midlands, East of England, London, South East, South West, ScotlandArchitecture and engineering, Construction

    Closing soon12 hours left8 lotsSuitable for SMEsFramework

    £5mframework ceiling
  4. Bbv sublot 4 - hsst1020 - saltley viaduct gabion wall

    Balfour Beatty VINCI JV HS2North East, North West, Yorkshire and the Humber, East Midlands, West Midlands, East of England, London, South WestConstruction, Highways and street lighting

    Closing soon17 hours leftSuitable for SMEs

    £1mestimated
  5. cemetery training

    Sheffield City CouncilYorkshire and the HumberTraining, Education services

    Closing soon2 days leftSmall contract

    £60kestimated

From notice 065286-2026 on Find a Tender, first published 10 July 2026, last updated 4 November 2026. We last checked for changes on 4 November 2026.