AwardedAwarded 24 December 2025

London Construction Programme General Works Framework MW25-GW

London Borough of Haringey · Local authority

In brief

London Borough of Haringey awarded construction work to Advanced Interior Solutions Ltd., Devcon Limited and E&C Construction Ltd and 41 others on 24 December 2025.

It is split into 16 lots, so a supplier can bid for part of the work.

Built from the notice's own fields. Always check the official notice before you bid.

What the notice says

The London Construction Programme (LCP) on behalf of Haringey Council is procuring a new general works framework. The scope of works will include a wide range of works across multiple types of buildings including individual, multiple occupancy, residential, commercial, heritage, community and those operated by the public sector on a 24 hour basis (i.e. police, health, fire and rescue, care homes etc.). The scope of the works will include (but not limited to), new buildings, MMC, planned and preventative maintenance, refurbishment, retrofit, fire safety works, heritage related works, remediations, mechanical and engineering services, renewable energy systems and adaptations. The Framework…Read the full description
The London Construction Programme (LCP) on behalf of Haringey Council is procuring a new general works framework. The scope of works will include a wide range of works across multiple types of buildings including individual, multiple occupancy, residential, commercial, heritage, community and those operated by the public sector on a 24 hour basis (i.e. police, health, fire and rescue, care homes etc.). The scope of the works will include (but not limited to), new buildings, MMC, planned and preventative maintenance, refurbishment, retrofit, fire safety works, heritage related works, remediations, mechanical and engineering services, renewable energy systems and adaptations. The Framework will be established for a period of 5 years and will be available to any public sector body in London and the Home Counties. It is anticipated the framework will commence in September 2025. The London Construction Programme was established in 2012 by Haringey Council was, encouraged and supported by other London Local Authorities through London Councils, to develop a pan-London strategy to improve construction related procurement and establish a suite of collaborative contractual vehicles which public sector organisations can utilise. The LCP currently has a total membership of over 60 Public Sector organisations in London and Home County. The LCP is a 'virtual organisation' currently hosted and operated by Haringey Council. The current LCP Framework (MW19) expired in October 2024. This new Framework is to provide General Works construction and General Works construction related activities for new build developments, building related planned component replacement, fire safety, remediations, retrofit and refurbishments according to the Lot Categories. The services will be procured in 16 lots: Lot GN1 New Build up to £7.5m contract value Lot GN2 New Build £6m - £15m contract value Lot GN3 New Build £14m+ contract value Lot GNPS New Build £1+ (i.e.no minimum contract value) Lot GF1 Fire Safety Works up to £7.5m contract value Lot GF2 Fire Safety Works £6m - £15m contract value Lot GF3 Fire Safety Works £14m+ contract value Lot GFPS Fire Safety Works £1+ (i.e.no minimum contract value) Lot GR1 Refurbishment and Retrofit up to £7.5m contract value Lot GR2 Refurbishment and Retrofit £6m - £15m contract value Lot GR3 Refurbishment and Retrofit £14m+ contract value Lot GRPS Refurbishment and Retrofit £1+ (i.e.no minimum contract value) Lot GP1 Planned Preventative Maintenance up to £7.5m contract value Lot GP2 Planned Preventative Maintenance £6m - £15m contract value Lot GP3 Planned Preventative Maintenance £14m+ contract value Lot GPPS Planned Preventative Maintenance £1+ (i.e.no minimum contract value) Tenderers are restricted to applying for a maximum of two sub lots, plus the PS sub lot in each of the primary Lots (i.e. New Build, Fire Safety Works, refurbishment and retrofit, Planned Preventative Maintenance). There are reserved places for micro and small enterprises on different Lots in order to encourage SMEs and provide choice for its Clients. A Reserve List will also be used for this framework for those Tenderers who are unsuccessful in being awarded a place on the primary Lots. The framework will be established with four main objectives in mind:- 1. To support its Clients to deliver on their net zero commitments in the following areas:- • Biodiversity assets • Climate Change adaptation • Zero Carbon Supply Chain • Low Carbon Transportation • Operational Low Carbon 2. To provide a fast and efficient route to market for education schemes across London and the Home Counties that offers value for money. 3. To drive positive changes in mental health and equality, diversity and inclusion in the construction sector. 4. To apply best practice, unlock innovation and work collaboratively with its Client and the Supply Chain.

Lots

LotTradeValue
Lot 1
What this lot covers

Lot GN1 New Build up to £7.5m contract value

Construction—
Lot 2
What this lot covers

GN2 (New Build £6m to £15m)

Construction—
Lot 3
What this lot covers

GN3 (New Build £14m and above)

Construction—
Lot 4
What this lot covers

GNPS (New Build £1 and above)

Construction—
Lot 5
What this lot covers

GF1 (Fire Safety Works up to £7.5million)

Construction—
Lot 6
What this lot covers

GF2 (Fire Safety Works £6m to £15m)

Construction—
Lot 7
What this lot covers

Initial contract is for a period of 60 months

Construction—
Lot 8
What this lot covers

GFPS (Fire Safety Works £1 and above)

Construction—
Lot 9
What this lot covers

GR1 (Refurbishment and Retrofit up to £7.5million)

Construction—
Lot 10
What this lot covers

GR2 (Refurbishment and Retrofit £6m to £15m)

Construction—
Lot 11
What this lot covers

GR3 (Refurbishment and Retrofit £14m and above

Construction—
Lot 12
What this lot covers

GRPS (Refurbishment and Retrofit £1 and above)

Construction—
Lot 13
What this lot covers

GP1 (Planned Preventative Maintenance up to £7.5million)

Construction—
Lot 14
What this lot covers

GP2 (Planned Preventative Maintenance £6m to £15m)

Construction—
Lot 15
What this lot covers

GP3 (Planned Preventative Maintenance £14m and above)

Construction—
Lot 16
What this lot covers

GPPS (Planned Preventative Maintenance £1 and above)

Construction—

Who won

WinnerLotValueDates
Advanced Interior Solutions Ltd. (SME)Lot 10£3,000,000,000
Devcon Limited (SME)—£3,000,000,000
E&C Construction Ltd (SME)Lot 5£3,000,000,000
Ensigna Construction Ltd (SME)—£3,000,000,000
EQUANS Regeneration Limited—£3,000,000,000
Ermine Construction Services Ltd. (SME)Lot 1£3,000,000,000
Etec Contract Services Limited (SME)Lot 1£3,000,000,000
Formation Design & Build Limited—£3,000,000,000
Galliford Try Construction Limited—£3,000,000,000
Glenman Corporation Ltd (SME)—£3,000,000,000
Guildmore Ltd. (SME)—£3,000,000,000
Alcema Ltd (SME)—£3,000,000,000
Highview Group LTD (SME)—£3,000,000,000
Indecon Building Limited (SME)Lot 1£3,000,000,000
Isoler Ltd. (SME)—£3,000,000,000
J Murphy and Sons Limited—£3,000,000,000
John Graham Construction LimitedLot 3£3,000,000,000
Johnsons 1871 Limited (SME)—£3,000,000,000
Kind & Company (Builders ltd) (SME)—£3,000,000,000
Kirkman and Jourdain Ltd (SME)Lot 13£3,000,000,000
Landmark Facades LtdLot 5£3,000,000,000
LIFE Build Solutions Limited (SME)Lot 4£3,000,000,000
Arte Construction Limited (SME)—£3,000,000,000
McLaren Construction Limited—£3,000,000,000
MP Building Ltd (SME)—£3,000,000,000
Neilcott Construction Limited—£3,000,000,000
RAAM Construction Ltd (SME)—£3,000,000,000
R G Stones (Buildings) Ltd—£3,000,000,000
Rooff Construction Limited (SME)—£3,000,000,000
Skafftec Ltd T/A R&B Refurbishment (SME)—£3,000,000,000
Spacemaker Developments Ltd (SME)—£3,000,000,000
Surecast Limited (SME)Lot 9£3,000,000,000
T&B Contractor (SME)—£3,000,000,000
Axis Europe—£3,000,000,000
Thomas Sinden Limited—£3,000,000,000
Vallectric Ltd (SME)—£3,000,000,000
Vision Built Structures Ltd (SME)Lot 4£3,000,000,000
Woodnut Construction and Developments LtdLot 12£3,000,000,000
Zed Pods Limited (SME)—£3,000,000,000
Ark Build PLC (SME)Lot 1£3,000,000,000
Boom Construction Limited (SME)—£3,000,000,000
Built Fitout and Refurbishment Limited (SME)—£3,000,000,000
Cityaxis Limited (SME)—£3,000,000,000
Curo Construction Limited—£3,000,000,000

Values as the award notice gives them, excluding VAT where stated.

Timeline

  1. Contract award notice · notice 024932-2026
  2. Contract notice (update) · notice 063953-2026

Last time this was bought

Broadwater Farm Estate - External Major Works Programme

Awarded
23 October 2025
Value
Not stated, or split across lots
Bids
2

Matched on London Borough of Haringey, the type of work and the title; it may be a related contract rather than the same one. Check the notice to be sure.

About the buyer

Similar open tenders

All open construction tenders
  1. Asbestos Management Framework

    Home GroupNorth East, North West, Yorkshire and the Humber, East Midlands, West Midlands, East of England, London, South East, South West, ScotlandArchitecture and engineering, Construction

    Closing soon7 hours leftExpress interest8 lotsSuitable for SMEsFramework

    £5mframework ceiling
  2. Asbestos Management Framework

    Home GroupNorth East, North West, Yorkshire and the Humber, East Midlands, West Midlands, East of England, London, South East, South West, ScotlandArchitecture and engineering, Construction

    Closing soon7 hours left8 lotsSuitable for SMEsFramework

    £5mframework ceiling
  3. Alterations and Refurbishment

    South Tyneside Borough CouncilNorth EastConstruction, Building maintenance and repairs

    Closing soon7 hours leftSuitable for SMEsSmall contract

    £81kestimated
  4. Bbv sublot 4 - hsst1020 - saltley viaduct gabion wall

    Balfour Beatty VINCI JV HS2North East, North West, Yorkshire and the Humber, East Midlands, West Midlands, East of England, London, South WestConstruction, Highways and street lighting

    Closing soon12 hours leftSuitable for SMEs

    £1mestimated
  5. Major Works 2027

    Places for People Group LimitedNorth East, North West, Yorkshire and the Humber, East Midlands, East of England, London, South East, South West, ScotlandConstruction, Building maintenance and repairs

    Closing soon5 days left33 lotsSuitable for SMEsFramework

    £163mframework ceiling

From notice 024932-2026 on Find a Tender, first published 19 March 2026, last updated 8 July 2026. We last checked for changes on 28 September 2026.