AwardedAwarded 15 January 2026

MAIN BLOCK 11-17 St.Johns Road, Frome, BA11 2BA - 2025-2026 Planned roof programme - Pitched Roof Refurbishment

Aster Group Limited · Local or regional public body

In brief

Aster Group Limited awarded construction and building maintenance work to O'Brien Roofing Ltd on 15 January 2026.

Built from the notice's own fields. Always check the official notice before you bid.

What the notice says

Project: The refurbishment of the roofline including the fascia’s . soffits, guttering and downpipes and to include the stripping and safely storing for reuse the courses of tiles required to replace the 1st row of felt and batten including rafter roll and eaves support trays. Supply and install 300mm of insulation to the roof space above the communal stairwell. • NB: All roofing work to be carried out by an NFRC accredited contractor • As part of contractor pre-survey, contractor should identity any soffit and live extractor fan vents which will need to be disconnected and reconnected during works • All flats must be checked to see if there are any live gas appliances, wood…Read the full description
Project: The refurbishment of the roofline including the fascia’s . soffits, guttering and downpipes and to include the stripping and safely storing for reuse the courses of tiles required to replace the 1st row of felt and batten including rafter roll and eaves support trays. Supply and install 300mm of insulation to the roof space above the communal stairwell. • NB: All roofing work to be carried out by an NFRC accredited contractor • As part of contractor pre-survey, contractor should identity any soffit and live extractor fan vents which will need to be disconnected and reconnected during works • All flats must be checked to see if there are any live gas appliances, wood burning/multi fuel stoves or open fires still in use prior to the removal of any chimney stacks. Evidence shall be provided to the Aster Surveyor who will be able to authorise this phase of work if necessary. Isolation of flues (priced separately) in line with gas protocols, removals (priced separately) to be discussed and review with client. • Aster Surveyor to advise with any blocking up and venting work as the scope of work will need to be agreed with the leaseholder/s or resident/s in advance. • Erect tubular steel scaffolding with required lifts to such elevations, including suitable access for removing the shared chimney and dismantle on completion. All scaffolding to be measured against the face of the building and to include the lift heights for a specific work type and trade. Page 5 of 15 • Remove existing tiles and safely store for reuse, remove battens, felt from the eaves course and safely lower to ground level and remove from site. • Allow for clearing all debris from the eaves and, then insulate using a 50-75mm thick PIR insulation board with a foil backing ensuring that an adequate air gap's left for ventilation. • Supply and fix new Permavent Apex breathable membrane to the cleared area area and fix new 38 x 25 mm tanalised timber battens to rafters. Reinstate the stored tiles. • Supply and fix eaves support trays G1281 by Manthorpe, including rafter roll fitted as per manufacturer’s instructions. To all roofs in contract. • Allow for supplying and fitting new deep flow guttering including downpipes, connections and associated fixtures & fittings to flat block. • Allow for supplying and fitting uPVCu fascia's, soffits. • Test guttering for leaks and adequate falls. Deliver free of dirt or imperfections. All waste material and debris will be removed from site. • Supply and lay 300mm of mineral wool insulation to the roof space above the communal stairwell • The contractor is to leave the properties and surrounding areas etc clean and clear to original condition. Wash down windows, doors, and existing/new PVCu Fascia's/soffits on completion to remove dirt & debris caused by roofing works.

Who won

WinnerValueDates
O'Brien Roofing Ltd£30,108
30 January 2026 to 27 February 2026

Values as the award notice gives them, excluding VAT where stated.

Timeline

  1. Contract details notice · UK7, notice 003694-2026

About the buyer

Aster Group LimitedLast 12 months

Procurements

23

Awards

19

Suppliers it has used most for construction

Similar open tenders

All open construction tenders
  1. Local Electric Vehicle Infrastructure (LEVI) Concession

    Cornwall CouncilSouth WestOffice supplies and equipment, Construction

    Closing soon2 days leftSuitable for SMEs

    £92.8mestimated
  2. NDC0086-26 - Fairview Car Park

    North Devon District CouncilSouth WestConstruction

    Closing soon4 days leftSuitable for SMEsSmall contract

    £180kestimated
  3. Major Voids Refurbishments - 9 Bunting Way, Forest Green, Nailsworth, GL6 0TQ

    Stroud District CouncilSouth WestConstruction

    Closing soon4 days leftSuitable for SMEsSmall contract

    £90kestimated
  4. The provision of Lift Replacement, Lift Modernisation and ongoing maintenance

    London Borough of SuttonNorth East, North West, Yorkshire and the Humber, East Midlands, West Midlands, East of England, London, South East, South WestConstruction, Electrical

    Open7 days leftSuitable for SMEsSmall contract

    £3mestimated
  5. Generator for Plus One Civic Campus

    Swindon Borough CouncilSouth WestConstruction, Electrical

    Open7 days leftSmall contract

    £130kestimated

From notice 003694-2026 on Find a Tender, first published 16 January 2026. We last checked for changes on 28 September 2026.