Upcoming
Market Engagement Questionnaire for T1418 How can batteries make the DC network safer and more cost effective?
Rail Safety Standards Board (RSSB) · Public undertaking
In brief
Rail Safety Standards Board (RSSB) has announced plans to buy research work. This is an early notice: there is nothing to bid on yet, but it tells you a tender may follow.
The estimated value is £180,000 excluding VAT.
The contract runs for 9 months, starting 1 September 2026.
Built from the notice's own fields. Always check the official notice before you bid.
Can I win this?
Competition
Typical: a median of 2.5 bids per contract for this buyer (from 8 awards in the last 12 months).
What the notice says
DC electrification is a system used to provide electric traction power to trains via an exposed conductor rail, commonly described as the ‘3rd rail’. The 3rd rail system is predominantly used in the south of England but is also used by the Merseyside commuter rail network in the North-West. Because of its accessible position on the ground next to the running rails, 3rd rail systems pose an electrical safety risk to the public and railway staff. To address these concerns in a cost-effective way, small retrofittable batteries could be used to allow trains to run between modest gaps in 3rd rail. This would allow removal of live 3rd rail at higher risk location such as stations, level crossing,…Read the full description
DC electrification is a system used to provide electric traction power to trains via an exposed conductor rail, commonly described as the ‘3rd rail’. The 3rd rail system is predominantly used in the south of England but is also used by the Merseyside commuter rail network in the North-West. Because of its accessible position on the ground next to the running rails, 3rd rail systems pose an electrical safety risk to the public and railway staff.
To address these concerns in a cost-effective way, small retrofittable batteries could be used to allow trains to run between modest gaps in 3rd rail. This would allow removal of live 3rd rail at higher risk location such as stations, level crossing, and junctions. Elimination of certain sections of the DC network, such as at switch and crossing junctions, could also result in maintenance productivity gains. RSSB project T1272 ‘Compatibility and optimisation considerations for rolling stock traction batteries and battery charging’ (T1272 Phase 1b Report FINAL – Page 64) indicated that a modest sized battery of 100 kWh could potentially remove larger parts of the DC network and allow a train to move through up to two kilometres of traction power disruptions.
The introduction of batteries for these aims must consider capital and operational costs, the engineering and operational controls that would be needed, and the transition strategy for both rolling stock and infrastructure.
For more information about this opportunity, please visit the eSourcing portal at:
https://www.delta-esourcing.com/tenders/UK-UK-London:-Research-services./F3ZBDSMB6C
To respond to this opportunity, please click here:
https://www.delta-esourcing.com/respond/F3ZBDSMB6C
How to bid
- Read the full notice on Find a Tender, including any tender documents it links to.
- Register your organisation on the Central Digital Platform (through Find a Tender) if you have not already. Suppliers need to be registered to take part in procurements under the Procurement Act 2023.
- Follow the submission instructions in the notice; it does not name an e-tendering portal.
Timeline
- Preliminary market engagement notice · UK2, notice 053890-2026
About the buyer
Rail Safety Standards Board (RSSB)Last 12 months
Procurements
46Awards
22Suppliers it has used most for research
- Ove Arup & Partners Ltd2 contracts
- Andromeda Engineering Ltd1 contract
- DGauge Ltd1 contract
- Engineering Support Group Limited1 contract
- OptiConsulting Limited1 contract
Similar open tenders
All open research tenders- £350kestimated
- £100kestimated
- £80kestimated
- £260mframework ceiling
- £170kestimated
From notice 053890-2026 on Find a Tender, first published 8 June 2026. We last checked for changes on 28 September 2026.