National Framework for Civil Engineering, Infrastructure and Enabling Works 2026
Yorkshire Purchasing Organisation · Local or regional public body
In brief
Yorkshire Purchasing Organisation awarded construction work to Gateway Construction Services Limited, Atkinsréalis UK Limited and O'Connell Contracting and 108 others on 25 September 2026.
It is a framework worth up to £4,166,666,666 excluding VAT: the most the buyer expects to spend across all suppliers, not one contract.
The contract runs for 4 years, starting 7 September 2026.
It is split into 13 lots, so a supplier can bid for part of the work.
The buyer says it is suitable for small and medium-sized businesses.
Built from the notice's own fields. Always check the official notice before you bid.
What the notice says
This notice does not replace the original Contract Award Notice (2026/S 000-087974) and therefore there is no new standstill period, which concluded on the 25th Sept 2026. Pagabo Limited, acting as an agent of YPO intend to award a Framework of contractors capable of providing Civil Engineering, Infrastructure and Enabling Works within the UK for the Public Sector. The Civil Engineering, Infrastructure and Enabling Works Framework is for use on works £0 and above in value, delivered as individual construction related projects, parts or phases of a project, and programmes of works. Works and services are listed under the following Common Procurement Vocabulary (CPV) classification as…Read the full description
Lots
| Lot | Trade | Value |
|---|---|---|
| Civils and Infrastructure - Collaborative Partners 7 September 2026 to 6 September 2030 What this lot coversBidders may submit a response for one or more Collaborative Partner positions on the Framework, as summarised below: Lot 1 ( a-c ) England & Wales (three appointments) Lot 1 ( d ) Scotland (one appointment) Lot 1 ( e ) Northern Ireland (one appointment) One Collaborative Partner will be appointed for Scotland and Northern Ireland geographical areas (Lot 1d & Lot 1e). Lot 1 England & Wales will comprise of three Appointed Suppliers, encompassing three separate Collaborative Partner sub-lots, with one successful Bidder appointed to each of the following categories/sub-lots. Delivery Sustainability Quality An appointed Collaborative Partner will be expected to act as a trusted, transparent, and proactive partner, working closely with all relevant Framework stakeholders and adopting a long term, partnership driven approach. Partners are expected to drive high performance in quality, digital delivery, innovation, and environmental, social, and economic outcomes, while ensuring value for money and strong whole life asset performance. Continuous improvement will be supported through knowledge sharing, lessons learned, and capability development across the Framework. | Construction | £830,000,000 |
| Civils and Infrastructure - Highways 7 September 2026 to 6 September 2030 What this lot coversProjects related to highways transport infrastructure including but not limited to roads, structures, active travel, surfacing and maintenance, public realm and associated buildings and infrastructure. | Construction | £1,750,000,000 |
| Civils and Infrastructure - Rail 7 September 2026 to 6 September 2030 What this lot coversProjects related to rail transport infrastructure including but not limited to railways, structures and associated buildings and infrastructure. | Construction | £750,000,000 |
| Civils and Infrastructure - Water and Environmental 7 September 2026 to 6 September 2030 What this lot coversProjects related to water and environmental resilience infrastructure including but not limited to water and wastewater treatment works, networks, reservoirs and dams, flood and coastal protection, land reclamation, environmental mitigation and habitat creation, and associated building and infrastructure. | Construction | £415,000,000 |
| Civils and Infrastructure - Maritime 7 September 2026 to 6 September 2030 What this lot coversProjects related to maritime infrastructure including but not limited to ports and harbours, canals, ferry terminals, subsea services and associated buildings and infrastructure. | Construction | £210,000,000 |
| Civils and Infrastructure - Energy 7 September 2026 to 6 September 2030 What this lot coversProjects related to renewable and non-renewable energy, onshore and offshore, including but not limited to power stations, electric power, gas and oil supply networks, hydroelectricity, solar, wind and associated building and infrastructure. | Construction | £210,000,000 |
| Civils and Infrastructure - Aviation 7 September 2026 to 6 September 2030 What this lot coversProjects related to aviation infrastructure including but not limited to passenger and freight terminals, runway and taxiway construction and refurbishment, perimeter roads, fencing and security and associated buildings and infrastructure. | Construction | £210,000,000 |
| Civils and Infrastructure - Nuclear and Defence 7 September 2026 to 6 September 2030 What this lot coversProjects related to infrastructure in specialist environments including but not limited to defence and nuclear for delivery of project such as reinforced concrete structures, storage facilities, decommissioning and waste encapsulation, site infrastructure upgrades, naval and submarine support infrastructure, airbase infrastructure, perimeter and access works and associated buildings and infrastructure. | Construction | £210,000,000 |
| Civils and Infrastructure - Rail Systems 7 September 2026 to 6 September 2030 What this lot coversProjects related to rail systems including but not limited to track and platform systems, electrification, signalling, telecommunications, power supply and distribution, multidisciplinary system integration, testing and associated buildings and infrastructure. Appointed Suppliers must be able to self-deliver this scope of works, as opposed to a sub-contracting delivery model. | Construction | £415,000,000 |
| Enabling Works - Collaborative Partner 7 September 2026 to 6 September 2030 What this lot coversBidders may submit a response for one or more Collaborative Partner positions on the Framework, as summarised below: Lot 10 ( a-c ) England & Wales (three appointments) Lot 10 ( d ) Scotland (one appointment) Lot 10 ( e ) Northern Ireland (one appointment) One Collaborative Partner will be appointed for Scotland and Northern Ireland geographical areas (Lot 10d & Lot 10e). Lot 1 England & Wales will comprise of three Appointed Suppliers, encompassing three separate Collaborative Partner sub-lots, with one successful Bidder appointed to each of the following categories/sub-lots. Delivery Sustainability Quality An appointed Collaborative Partner will be expected to act as a trusted, transparent, and proactive partner, working closely with all relevant Framework stakeholders and adopting a long term, partnership driven approach. Partners are expected to drive high performance in quality, digital delivery, innovation, and environmental, social, and economic outcomes, while ensuring value for money and strong whole life asset performance. Continuous improvement will be supported through knowledge sharing, lessons learned, and capability development across the Framework. | Construction | £25,000,000 |
| Enabling Works - Demolition 7 September 2026 to 6 September 2030 What this lot coversProjects related to demolition activities including but not limited to soft strip and structural demolition, asbestos removal, decontamination and decommissioning, site clearance and protection of adjacent assets and services. Appointed Suppliers shall be licensed to remove asbestos and be members of a recognised registration body such as, National Federation of Demolition Contractors (NFDC) for the duration of the Framework. | Construction | £87,500,000 |
| Enabling Works - Land Remediation and Groundworks 7 September 2026 to 6 September 2030 What this lot coversProjects related to remediation activities including but not limited to contaminated land remediation, bulk earthworks, waste recycling, ground improvement, piling and foundation systems, drainage and attenuation and substructure preparation. | Construction | £18,750,000 |
| Enabling Works - Full Enabling Works 7 September 2026 to 6 September 2030 What this lot coversProjects related to full turnkey activities including but not limited to a combination of scope from Demolition and Land Remediation work types in addition to utility diversions and disconnections and other early infrastructure to facilitate main works delivery. Appointed Suppliers shall be licensed to remove asbestos and be members of a recognised registration body such as, National Federation of Demolition Contractors (NFDC) for the duration of the Framework. | Construction | £18,750,000 |
Who won
Values as the award notice gives them, excluding VAT where stated.
Timeline
- Preliminary market engagement notice · UK2, notice 036012-2026
- Tender notice · UK4, notice 041229-2026
- Contract award notice · UK6, notice 087974-2026
- Contract award notice · UK6, notice 100206-2026
About the buyer
Procurements
91Awards
45Suppliers it has used most for construction
- John Graham Construction Limited3 contracts
- Atkinsréalis UK Limited2 contracts
- Esh Construction Limited2 contracts
- FP Mccann Limited2 contracts
- Galliford Try Construction Limited2 contracts
Similar open tenders
All open construction tenders- £5mframework ceiling
- £5mframework ceiling
- £81kestimated
- £1mestimated
- £163mframework ceiling
From notice 036012-2026 on Find a Tender, first published 21 April 2026, last updated 22 October 2026. We last checked for changes on 22 October 2026.