AwardedAwarded 10 November 2025
Neurology Ward refurbishment
Royal United Hospitals Bath NHS Foundation Trust · NHS and health
In brief
Royal United Hospitals Bath NHS Foundation Trust awarded construction and building maintenance work to Bray and Slaughter Limited on 10 November 2025.
Built from the notice's own fields. Always check the official notice before you bid.
What the notice says
There is a requirement to strip out and refurbish the B12 Neurology Ward at Royal United Hospitals Bath NHS Foundation Trust to enhance productivity and efficiency. Key objectives of this include reducing bed days lost due to prolonged stays and bariatric patient admissions, currently totalling 329 annually. The scheme directly addresses patient safety and fire safety risks. By mitigating the risk of closure of 17 beds, significant benefits are anticipated:
• Prevention of loss of 6,205 bed days annually
• Improvement in ED 4-hour performance by 6%
• Enhanced ambulance offload times and overall hospital flow
• Better patient experience
• More efficient clinical to non-clinical space ratio.
Implementation is expected to contribute to improved operational performance and patient outcomes at the Trust.
Who won
| Winner | Value | Dates |
|---|---|---|
| Bray and Slaughter Limited (SME) | £2,328,057 | 11 November 2025 to 31 March 2026 |
Values as the award notice gives them, excluding VAT where stated.
Timeline
- Contract details notice · UK7, notice 079345-2025
About the buyer
Royal United Hospitals Bath NHS Foundation TrustLast 12 months
Procurements
48Awards
31Suppliers it has used most for construction
- Woodstock SW Ltd2 contracts
- Adept Power Solutions Ltd1 contract
- Bray and Slaughter Limited1 contract
- CW Duke and Sons Ltd1 contract
- Dave Lucey Limited1 contract
Similar open tenders
All open construction tenders- £75kestimated
- £92.8mestimated
- £4.4mestimated
- £160kestimated
- £180kestimated
From notice 079345-2025 on Find a Tender, first published 3 December 2025. We last checked for changes on 28 September 2026.