NRW All Wales Mountain Bike Trail and Maintenance Framework

Natural Resources Wales · Local or regional public body

In brief

Natural Resources Wales has announced plans to buy construction and highways work. This is an early notice: there is nothing to bid on yet, but it tells you a tender may follow.

It is a framework worth up to £2,000,000 excluding VAT: the most the buyer expects to spend across all suppliers, not one contract.

The contract runs for 4 years, starting 4 January 2027.

The buyer says it is suitable for small and medium-sized businesses.

Built from the notice's own fields. Always check the official notice before you bid.

Can I win this?

Competition

Typical: a median of 5 bids per contract for this buyer (from 37 awards in the last 12 months).

Framework

Winning puts you on a list of suppliers the buyer can call on; it does not guarantee work. The £2,000,000 is the most the buyer expects to spend across all suppliers over the framework's life, not one contract.

What the notice says

NRW intends to award a Framework Agreement to support the maintenance of over 500km official NRW mountain bike trails across Wales. The Framework contains two separate Lots, each divided further into geographical sub-Lots. Lot 1 – Mountain Bike Trail Maintenance Works Lot 1 covers the preventative and reactive maintenance activities identified through the regular trail inspection programme. The specification of works includes, but is not limited to: • Maintenance of mountain bike trail tread, trail chassis and trailside features, including de-berming, culvert repairs, ditch clearance, grade dip repairs, and repairs to trail tread and chassis using hand tools, whacker plates, powered…Read the full description
NRW intends to award a Framework Agreement to support the maintenance of over 500km official NRW mountain bike trails across Wales. The Framework contains two separate Lots, each divided further into geographical sub-Lots. Lot 1 – Mountain Bike Trail Maintenance Works Lot 1 covers the preventative and reactive maintenance activities identified through the regular trail inspection programme. The specification of works includes, but is not limited to: • Maintenance of mountain bike trail tread, trail chassis and trailside features, including de-berming, culvert repairs, ditch clearance, grade dip repairs, and repairs to trail tread and chassis using hand tools, whacker plates, powered wheelbarrows and other plant and equipment as required. This also includes clearance of fall zones and maintenance of the wider trail corridor. • Maintenance of trail corridors and sightlines through vegetation management, including cutting back encroaching vegetation and brashing trailside trees flush to the trunk. • Small-scale installation, maintenance and repair of fencing and motorcycle barriers. Detailed specifications for all works will be agreed in advance between the Contractor and the Lot Manager. • Installation, maintenance and replacement of waymarker posts, interpretation panels, signage and other associated trailside infrastructure. • Small-scale chemical treatment and manual control of weeds and invasive species within car parks and along trail networks. Chemical use must be kept to a minimum, with manual clearance being the preferred method wherever practicable. Written approval from the Project Manager must be obtained prior to any chemical application, including approval of the products to be used and the proposed application method. Chemical usage records and data sheets must be provided by the Contractor following completion of spraying activities. • Emergency call-out works, including outside normal working hours (09:00–17:00, Monday to Friday), for repairs, maintenance activities, route diversions and other urgent operational requirements. Lot 2 – Mountain Bike Trail Design and Construction Lot 2 covers the design and construction of new mountain bike trails and trail sections to the grades specified by the Client. Detailed project-specific requirements will be provided for each commission; however, the scope is expected to include: • Detailed trail design. • Securing all necessary permissions, approvals, consents and licences required for project delivery. • Corridor clearance and construction of trails to the specification and grading requirements defined by the Client. • Testing, commissioning and certification that the completed works are fit for purpose. • Formal handover of completed trails and associated documentation to the Client.

How to bid

  1. Read the full notice on Find a Tender, including any tender documents it links to.
  2. Register your organisation on the Central Digital Platform (through Find a Tender) if you have not already. Suppliers need to be registered to take part in procurements under the Procurement Act 2023.
  3. Follow the submission instructions in the notice; it does not name an e-tendering portal.

Timeline

  1. Pipeline notice · UK1, notice 058736-2026

About the buyer

Procurements

91

Awards

67

Suppliers it has used most for construction

  • CWM Agricultural Limited3 contracts
  • Camddwr Contractors Cyf2 contracts
  • G.T. Jones Contracting Limited2 contracts
  • Jimmy Hughes Services Ltd2 contracts
  • Net Zero (North) Limited2 contracts

Similar open tenders

All open construction tenders
  1. Contract for the Execution for Renewal of UPVC Windows & Doors at Sketty Park Phase 3

    City & County of SwanseaWalesConstruction

    Closing soon11 hours leftSmall contract

    £170kestimated
  2. Framework for the Maintenance of Fire Doors

    Vale of Glamorgan CouncilWalesConstruction, Building maintenance and repairs

    Closing soon35 hours leftLow competitionSuitable for SMEsSmall contractFramework

    £2.5mframework ceiling
  3. Multi-site solar PV installations work for cyngor gwynedd

    Cyngor GwyneddWalesEnergy and utilities, Construction

    Closing soon2 days leftLow competitionSuitable for SMEsSmall contract

    £1.4mestimated
  4. Ysgol Gymraeg Bro Helyg Primary (Air Source Heat Pump Conversion)

    Blaenau Gwent County Borough CouncilWalesConstruction

    Closing soon2 days leftSuitable for SMEsSmall contract

    £600kestimated
  5. Planned and Preventative Maintenance of CCTV, Door Access and Control Systems and Intruder Alarms

    Aneurin Bevan University Health BoardWalesSecurity, Construction

    Closing soon2 days leftLow competitionSuitable for SMEs

    £2.5mestimated

From notice 058736-2026 on Find a Tender, first published 23 June 2026. We last checked for changes on 28 September 2026.