AwardedAwarded 30 June 2025
Plas Caerdeon Electrical re-wire works & fire alarm upgrade
Liverpool Hope University · Education
In brief
Liverpool Hope University awarded construction and electrical work to C.L.C. Contractors Limited on 30 June 2025.
Built from the notice's own fields. Always check the official notice before you bid.
What the notice says
The works comprise the electrical strip out and re-wire of Plas Caerdeon. It also includes the strip out and upgrade of the existing fire alarm system. It comprises of a Victorian manor house with communal GF areas including commercial kitchen as well as two upper floors which contain 15 dorm type bedrooms with separate shared bathroom facilities. There is also a separate converted stables and cottages which serve as self-catering accommodation for up to 17 people. The Project consists of the removal of the existing electrical wiring and outlets and replacing with new electric panel heaters and outlets/switches. The existing fire alarm system is to be stripped out and replaced with a fully…Read the full description
The works comprise the electrical strip out and re-wire of Plas Caerdeon. It also includes the strip out and upgrade of the existing fire alarm system. It comprises of a Victorian manor
house with communal GF areas including commercial kitchen as well as two upper floors which contain 15 dorm type bedrooms with separate shared bathroom facilities. There is also a separate converted stables and cottages which serve as self-catering accommodation for up to 17 people.
The Project consists of the removal of the existing electrical wiring and outlets and replacing with new electric panel heaters and outlets/switches. The existing fire alarm system is to be stripped out and replaced with a fully addressable system. It is the contractor's responsibility to design and specify the new fire alarm system and mange the works alongside the electrical installation.
In association with these works there is a requirement to fill and make good all holes, penetrations etc. left by the removal of the old equipment, and also to the new equipment and cables provided by the new installation, paying particular attention to the Fire Strategy of the building and providing fire stopping where required, by a third-party accredited fire stopping contractor. In full compliance with the buildings fire strategy.
As these works require decoration & making good, the University have requested that the decoration of all affected areas is included within the programme of works.
In association with providing the new electrical panel heaters, socket outlets and switches to the building the following electrical works will also be required to facilitate the new installation.
Who won
| Winner | Value | Dates |
|---|---|---|
| C.L.C. Contractors Limited | £428,696 | 21 July 2025 to 10 October 2025 |
Values as the award notice gives them, excluding VAT where stated.
Timeline
- Contract details notice · UK7, notice 007615-2026
About the buyer
Liverpool Hope UniversityLast 12 months
Procurements
12Awards
8Suppliers it has used most for construction
- A.a.c. Waterproofing Limited1 contract
- Enigma Industrial Services Ltd1 contract
Similar open tenders
All open construction tenders- £30mestimated
- £55kestimated
- £1.4mestimated
- £2.5mestimated
- £6.36mframework ceiling
From notice 007615-2026 on Find a Tender, first published 28 January 2026. We last checked for changes on 27 September 2026.