AwardedAwarded 15 April 2026
Primary Spring Chevrons - 09 HOPL (Victoria Line)
London Underground Limited · Public undertaking
In brief
London Underground Limited awarded this contract to Alstom Transport UK Limited on 15 April 2026.
The buyer says it is suitable for small and medium-sized businesses.
Built from the notice's own fields. Always check the official notice before you bid.
What the notice says
This direct award procurement is for the supply of the bogie Primary Spring Chevrons for the Victoria Line fleet.
The primary suspension chevrons are Metalastik units made up of metal plates bonded with a moulded rubber layer. This rubber serves a dual purpose: it acts as a spring while also providing damping, and it allows limited movement so the wheelset can make small rotations in all directions.
The programme is phase 2 of the of the Victoria Line Heavy Overhaul programme. This phase will commence in October 2026.
The Chevrons will be fitted to the Bogies at Depot with a 100% mandatory swap out of 128 Chevron per train. 46 trains will be overhauled in total. The train overhaul is being undertaken by TFL engineering team.
Who won
| Winner | Value | Dates |
|---|---|---|
| Alstom Transport UK Limited | £508,416 | Awarded 19 March 2026 23 April 2026 to 23 July 2027 |
Values as the award notice gives them, excluding VAT where stated.
Timeline
- Transparency notice · UK5, notice 004177-2026
- Contract award notice · UK6, notice 030106-2026
- Contract details notice · UK7, notice 036889-2026
About the buyer
London Underground LimitedLast 12 months
Procurements
35Awards
18Suppliers it has used most
- Alstom Transport UK Limited2 contracts
- Crmi Ltd2 contracts
- Ab Connectors Limited1 contract
- Bmac Limited1 contract
- Costain Ltd1 contract
- Dellner Ferrabyrne Limited1 contract
- Faigle kunststoffe gmbh1 contract
- Huber+suhner (UK) Ltd1 contract
From notice 004177-2026 on Find a Tender, first published 19 January 2026, last updated 23 April 2026. We last checked for changes on 28 September 2026.