AwardedAwarded 2 March 2026
Project Shared - Alpha Phase
UK Power Networks (Operations) Limited · Private utility
In brief
UK Power Networks (Operations) Limited awarded research work to Frazer-Nash Consultancy Ltd and The First Element Group Ltd on 2 March 2026.
Built from the notice's own fields. Always check the official notice before you bid.
What the notice says
UK Power Networks (Operations) Limited intends to enter into a collaboration with The First Element Group Limited and Frazer‑Nash Consultancy Limited for the delivery of the Alpha Phase of Project SHARED, funded under Ofgem's Strategic Innovation Fund (SIF). The project aims to evaluate whether hydrogen-based resilience solutions can provide a cost‑effective alternative to traditional reinforcement in rural areas where electricity supply interruptions are prevalent. The work involves identifying viable hydrogen technologies, developing engineering concepts, undertaking network simulations, assessing stakeholder needs, and producing evidence to support potential future demonstrations.…Read the full description
UK Power Networks (Operations) Limited intends to enter into a collaboration with The First Element Group Limited and Frazer‑Nash Consultancy Limited for the delivery of the Alpha Phase of Project SHARED, funded under Ofgem's Strategic Innovation Fund (SIF).
The project aims to evaluate whether hydrogen-based resilience solutions can provide a cost‑effective alternative to traditional reinforcement in rural areas where electricity supply interruptions are prevalent. The work involves identifying viable hydrogen technologies, developing engineering concepts, undertaking network simulations, assessing stakeholder needs, and producing evidence to support potential future demonstrations. Services will be delivered collaboratively by the three Project Partners, each responsible for specific work packages defined in the Project Plan. Work will be carried out through workshops, design activities, laboratory testing, engineering analysis, stakeholder engagement, and preparation of formal reports. Each partner will appoint a project manager and participate in monthly reporting, joint reviews, and progress meetings.
The total estimated value of the Alpha Phase is
£562,562, comprising:
- UK Power Networks (Operations) Limited: £122,330 total costs
- The First Element Group Limited: £155,700 total
costs
- Frazer‑Nash Consultancy Limited: £284,532 total
costs
Ofgem SIF funding sought amounts to £499,526, with the remaining £63,036 provided as partner contributions in accordance with the funding rules.
Who won
| Winner | Value | Dates |
|---|---|---|
| Frazer-Nash Consultancy Ltd The First Element Group Ltd (SME) | £562,562 | Awarded 2 March 2026 |
Values as the award notice gives them, excluding VAT where stated.
Timeline
- Transparency notice · UK5, notice 019453-2026
- Contract award notice · UK6, notice 023733-2026
About the buyer
UK Power Networks (Operations) LimitedLast 12 months
Procurements
30Awards
17Suppliers it has used most for research
- Frazer-Nash Consultancy Ltd1 contract
- The First Element Group Ltd1 contract
Similar open tenders
All open research tenders- £350kestimated
- £100kestimated
- £80kestimated
- £260mframework ceiling
- £170kestimated
From notice 019453-2026 on Find a Tender, first published 4 March 2026, last updated 16 March 2026. We last checked for changes on 28 September 2026.