Upcoming
Property Refurbishment - Lodge Farm Cottage, East Forest District
Forestry Commission · Local or regional public body
In brief
Forestry Commission has announced plans to buy construction and building maintenance work. This is an early notice: there is nothing to bid on yet, but it tells you a tender may follow.
The notice does not state a value.
The contract runs for 6 months, starting 1 April 2027.
The buyer says it is suitable for small and medium-sized businesses.
Built from the notice's own fields. Always check the official notice before you bid.
Can I win this?
Competition
Usually high: a median of 7 bids per contract for this buyer (from 97 awards in the last 12 months).
What the notice says
Forestry England is planning to refurbish Lodge Farm Cottage so it is fit to live in and can be rented out. We expect the work to cover general building, heating and plumbing, electrical and external works. The contractor we appoint would coordinate the works and give us the completion documents.
Working is detailed in the attached outline scope but would include:-
• Strip out the inside, clear the site and protect the existing building.
• New kitchen and bathroom, with the plumbing and electrical changes that go with them.
• New external oil boiler, changes to the heating system, a new hot water cylinder and the pipework.
• Plaster repairs, better insulation, decorating inside and minor carpentry.
• Electrical testing and certificates, lighting and extra power.
• Drainage and groundworks outside, lime pointing, repairs to the outhouse and a new well cover.
• Site welfare, security and waste removal, risk assessments and method statements, testing and commissioning, and handover information.
How to bid
- Read the full notice on Find a Tender, including any tender documents it links to.
- Register your organisation on the Central Digital Platform (through Find a Tender) if you have not already. Suppliers need to be registered to take part in procurements under the Procurement Act 2023.
- Follow the submission instructions in the notice; it does not name an e-tendering portal.
Timeline
- Preliminary market engagement notice · UK2, notice 104513-2026
About the buyer
Forestry CommissionLast 12 months
Procurements
152Awards
87Suppliers it has used most for construction
- Alaska Ecological Contracting LTD1 contract
- Arthur Civil Engineering Limited1 contract
- Clixby's Forestry Ground Prep Limited1 contract
- Durham Fencing and Landscaping Ltd1 contract
- G.Farwell LTD1 contract
Similar open tenders
All open construction tenders- £90kestimated
- £100kestimated
- £5mframework ceiling
- £5mframework ceiling
- £2.52mframework ceiling
From notice 104513-2026 on Find a Tender, first published 4 November 2026. We last checked for changes on 4 November 2026.