Awarded
Provision of Maintenance Services for Flood Water Facility Water Treatment Plant in LDC Cookstown
Northern Ireland Fire and Rescue Service · Police and fire
In brief
Northern Ireland Fire and Rescue Service awarded construction work to Clearway Technology Limited.
Built from the notice's own fields. Always check the official notice before you bid.
What the notice says
As part of the £42m construction of the new NIFRS Learning and Development Training College, NIFRS installed a unique Flood Water Facility (FWF). It is a unique firefighting training asset, the second of its kind in the world; it includes a 10m wide x 100m long flood channel fed by an adjoining reservoir via a dedicated pumping station. The flood channel includes a vehicle access gate, mock residential property, footbridge and various access points to provide realistic scenarios for Water Rescue training. This area of the site also incorporates an extended area of hard-standing and water access design features to facilitate a range of HVP training scenarios. The water volume of the facility…Read the full description
As part of the £42m construction of the new NIFRS Learning and Development Training College, NIFRS installed a unique Flood Water Facility (FWF). It is a unique firefighting training asset, the second of its kind in the world; it includes a 10m wide x 100m long flood channel fed by an adjoining reservoir via a dedicated pumping station. The flood channel includes a vehicle access gate, mock residential property, footbridge and various access points to provide realistic scenarios for Water Rescue training. This area of the site also incorporates an extended area of hard-standing and water access design features to facilitate a range of HVP training scenarios. The water volume of the facility is approximately 6,700m³. The water is treated to 'recreational standards', following European Union (EU) inland bathing standards and World Health Organization (WHO) recreational water quality guidelines. To enable this, there is a bespoke water treatment system installed. These bespoke water treatment systems will require a stringent and specific planned preventative maintenance (PPM) regime to ensure the pool is maintained to swimming pool standards. In addition to PPM, Reactive maintenance is required to identify, isolate and rectify a fault so that the failed equipment, prop or system can be restored to an operational and safe condition within the tolerances or limits established for in-service operations.
Who won
| Winner | Value | Dates |
|---|---|---|
| Clearway Technology Limited | £87,387 |
Values as the award notice gives them, excluding VAT where stated.
Timeline
- Transparency notice · UK5, notice 075378-2025
Last time this was bought
Provision of Maintenance Services for Flood Water Facility Water Pumps in LDC Cookstown
- Awarded
- 18 November 2025
- Value
- £71,487
Matched on Northern Ireland Fire and Rescue Service, the type of work and the title; it may be a related contract rather than the same one. Check the notice to be sure.
About the buyer
Northern Ireland Fire and Rescue ServiceLast 12 months
Procurements
13Awards
6Suppliers it has used most for construction
- Seaview Developments1 contract
Similar open tenders
All open construction tenders- £3.5mestimated
- £4mestimated
- £3.8mestimated
- £750kestimated
- £8bnframework ceiling
From notice 075378-2025 on Find a Tender, first published 19 November 2025. We last checked for changes on 28 September 2026.