Reinstatement Services
Thames Water Utilities Limited · Private utility
In brief
Thames Water Utilities Limited is looking for suppliers for construction and highways work (London, South East).
It is a framework worth up to £126,000,000 excluding VAT: the most the buyer expects to spend across all suppliers, not one contract.
The contract runs for 3 years, up to 9 years with extensions, starting 1 April 2027.
It is split into 3 lots, so a supplier can bid for part of the work.
This is the first stage: register your interest by midday, Wednesday 25 November 2026, and shortlisted suppliers are invited to bid.
Built from the notice's own fields. Always check the official notice before you bid.
Can I win this?
Key dates
- Questions by
- midday, Wednesday 11 November 2026
- Express interest by
- midday, Wednesday 25 November 2026
This is the first stage. You register interest now, and shortlisted suppliers are invited to bid later.
How bids are scored
Technical 50% · Commercial 50%
A balance of quality and price.
Competition
Typical: a median of 5 bids per contract for construction contracts in this region (from 494 awards in the last 12 months).
Framework
Winning puts you on a list of suppliers the buyer can call on; it does not guarantee work. The £126,000,000 is the most the buyer expects to spend across all suppliers over the framework's life, not one contract.
What the notice says
IMPORTANT: Please read this section before deciding whether you wish to register for this event. This section provides you with information regarding the scope of this procurement and details some of the key requirements that a successful applicant MUST be able to deliver. Thames Water is seeking to appoint qualified suppliers to deliver comprehensive reinstatement services across its clean water network asset base. Following operational interventions including reactive repairs, planned maintenance, mains renewals, and meter installations, the successful suppliers will assume responsibility for restoring all disrupted highways, footways, and private verges. The scope demands end-to-end…Read the full description
Should I bid?
Tick what applies to you. Nothing is saved.
How to bid
- Read the full notice on Find a Tender, including any tender documents it links to.
- Register your organisation on the Central Digital Platform (through Find a Tender) if you have not already. Suppliers need to be registered to take part in procurements under the Procurement Act 2023.
- Follow the submission instructions in the notice; it does not name an e-tendering portal.
- Send clarification questions before midday, Wednesday 11 November 2026.
- Register your interest before midday, Wednesday 25 November 2026. Shortlisted suppliers are then invited to bid.
Lots
| Lot | Trade | Value |
|---|---|---|
| North London 1 April 2027 to 31 March 2030 What this lot coversReinstatement is repairing or returning a road surface back to a compliant state after an excavation to repair, maintain or put in place a Thames Water asset. Approximately 35% of our reinstatements take place in North London. The awarded supplier will be responsible for all reinstatements in the region across all work-streams including but not limited to: - Repair and maintenance; - Developer services; - Metering; - Capital delivery projects; - Waste network; - Customer side leakage The awarded supplier will be responsible for providing the end to end reinstatement services, compliant to Specification for Reinstatement of Openings in Highways (SROH), in North London (material, labour, plant) including but not limited to planning of work allocation, reporting, governance and systems: - muck away is removed; - fine material and backfill is placed in the hole and compacted compliant to specification and standards; - white works team responsible for replacement of concrete, paving slabs and kerbs; - black works team lay asphalt and paint lines compliant to specifications and left to cure; - signs, lighting and guarding cleared and jet wash if necessary. | Construction, Highways and street lighting | £44,100,000 |
| South London 1 April 2027 to 31 March 2030 What this lot coversReinstatement is repairing or returning a road surface back to a compliant state after an excavation to repair, maintain or put in place a Thames Water asset. Approximately 30% of our reinstatements take place in South London. The awarded supplier will be responsible for all reinstatements in the region across all work-streams including but not limited to: - Repair and maintenance; - Developer services; - Metering; - Capital delivery projects; - Waste network; - Customer side leakage The awarded supplier will be responsible for providing the end to end reinstatement services, compliant to Specification for Reinstatement of Openings in Highways (SROH), in South London (material, labour, plant) including but not limited to planning of work allocation, reporting, governance and systems: - muck away is removed; - fine material and backfill is placed in the hole and compacted compliant to specification and standards; - white works team responsible for replacement of concrete, paving slabs and kerbs; - black works team lay asphalt and paint lines compliant to specifications and left to cure; - signs, lighting and guarding cleared and jet wash if necessary. | Construction, Highways and street lighting | £37,800,000 |
| Thames Valley and Home Counties 1 April 2027 to 31 March 2030 What this lot coversReinstatement is repairing or returning a road surface back to a compliant state after an excavation to repair, maintain or put in place a Thames Water asset. Approximately 35% of our reinstatements take place in TVHC. The awarded supplier will be responsible for all reinstatements in the region across all work-streams including but not limited to: - Repair and maintenance; - Developer services; - Metering; - Capital delivery projects; - Waste network; - Customer side leakage The awarded supplier will be responsible for providing the end to end reinstatement services, compliant to Specification for Reinstatement of Openings in Highways (SROH), in TVHC (material, labour, plant) including but not limited to planning of work allocation, reporting, governance and systems: - muck away is removed; - fine material and backfill is placed in the hole and compacted compliant to specification and standards; - white works team responsible for replacement of concrete, paving slabs and kerbs; - black works team lay asphalt and paint lines compliant to specifications and left to cure; - signs, lighting and guarding cleared and jet wash if necessary. | Construction, Highways and street lighting | £44,100,000 |
Timeline
- Tender notice · UK4, notice 103078-2026
About the buyer
Procurements
45Awards
13Suppliers it has used most for construction
- Kier Infrastrucutre Overseas Limited2 contracts
- Amelio Utilities Limited1 contract
- Amentum Enterprise Asset Solutions Limited1 contract
- Balmoral Tanks Limited1 contract
- Bam Nuttall Limited1 contract
Similar open tenders
All open construction tenders- Value not stated
- £5mframework ceiling
- £5mframework ceiling
- £1mestimated
- £60kestimated
From notice 103078-2026 on Find a Tender, first published 30 October 2026. We last checked for changes on 30 October 2026.