Upcoming

Remediation of Metalliferous Mine Waste

Mining Remediation Authority · Public body

In brief

Mining Remediation Authority has announced plans to buy waste work. This is an early notice: there is nothing to bid on yet, but it tells you a tender may follow.

The notice does not state a value.

The contract runs for 5 years, starting 1 April 2026.

The buyer says it is suitable for small and medium-sized businesses.

Built from the notice's own fields. Always check the official notice before you bid.

Can I win this?

Competition

Typical: a median of 5 bids per contract for this buyer (from 5 awards in the last 12 months).

What the notice says

Addressing metalliferous diffuse pollution from old, abandoned metal mine sites within UK river catchments is a priority due to the significant environmental impacts associated with the release of harmful diffuse pollutants. These mine sites both leach toxic metals like lead, cadmium and zinc and mobilise heavy metal containing sediments that are washed/leach into adjacent watercourses. This contamination impacts water quality, aquatic life and biodiversity. Proactively managing and mitigating diffuse pollution in these catchments is essential to restoring and preserving the ecological balance of the river systems, ensuring the safety of the water for future generations, and maintaining…Read the full description
Addressing metalliferous diffuse pollution from old, abandoned metal mine sites within UK river catchments is a priority due to the significant environmental impacts associated with the release of harmful diffuse pollutants. These mine sites both leach toxic metals like lead, cadmium and zinc and mobilise heavy metal containing sediments that are washed/leach into adjacent watercourses. This contamination impacts water quality, aquatic life and biodiversity. Proactively managing and mitigating diffuse pollution in these catchments is essential to restoring and preserving the ecological balance of the river systems, ensuring the safety of the water for future generations, and maintaining local economies that depend on both rivers and surrounding lands for employment, recreation and agriculture. The primary objective under this contract is to mitigate diffuse metalliferous pollution within complex topographic and ecological conditions by applying an innovative, proportional suite of techniques to stabilise mine wastes and interrupt erosion and infiltration pathways. Baseline data on soil chemistry, metals and microbial diversity will inform the design of multi-treatment trials to evaluate restoration materials and techniques across contrasting environmental conditions. We will be looking to consider a range of stabilisation methods, including bespoke technosols to be developed to address the diverse on-site substrates; bare spoil, early-stage biocrusts and spoil adjacent to established habitats. The approach will be sympathetic to natural ecological succession from primary non-vascular colonisers to mature native grassland and heathland communities.

How to bid

  1. Read the full notice on Find a Tender, including any tender documents it links to.
  2. Register your organisation on the Central Digital Platform (through Find a Tender) if you have not already. Suppliers need to be registered to take part in procurements under the Procurement Act 2023.
  3. Follow the submission instructions in the notice; it does not name an e-tendering portal.

Timeline

  1. Preliminary market engagement notice · UK2, notice 074947-2025

About the buyer

From notice 074947-2025 on Find a Tender, first published 18 November 2025. We last checked for changes on 28 September 2026.