Closed

Responsive Maintenance Framework Agreement - Ref 01003

Tai Tarian Ltd · Local or regional public body

In brief

Tai Tarian Ltd was looking for suppliers for construction and heating and plumbing work. Bidding has closed and no award has been published yet.

It is a framework worth up to £3,940,000 excluding VAT: the most the buyer expects to spend across all suppliers, not one contract.

It is split into 8 lots, so a supplier can bid for part of the work.

The buyer says it is suitable for small and medium-sized businesses.

Built from the notice's own fields. Always check the official notice before you bid.

What the notice says

Tai Tarian is seeking to appoint contractors (Providers) to a Framework Agreement for property related repairs and maintenance works. The Framework Agreement will be split into the following eight Lots: Lot 1 – Plumbing Lot 2 – Electrical Lot 3 – Carpentry Lot 4 - Plastering Lot 5 – Communal Aerials Lot 6 - Flooring Lot 7 – External works – Paths, Fencing and Walls Lot 8 – Fabrication of Railings and Gates Lots will be awarded on an individual basis, and a Tenderer can bid for a maximum of four lots. Tenderers must ensure that their submission clearly shows that they’re able to meet the requirements of each Lot, and (if bidding for multiple Lots) not to make any statement or assumption that their bid is conditional on being awarded multiple Lots.

Lots

LotTradeValue
Plumbing
1 April 2026 to 31 March 2027
What this lot covers

The scope of this Lot comprises repair and maintenance of plumbing (excluding heating and hot water) as set out in the NHF Schedule of Rates for Responsive Maintenance (Version 8) included in Appendix 1CL1, and in accordance with Specification (Appendix 2AL1). We are seeking to appoint Providers to complete 1-day and 7-day repairs including out of hours, on a fixed term 1 year Call-off Contract. We estimate work to be in the region of 600 – 700 works orders per quarter to address leaks, blockages and faulty plumbing e.g., taps, siphons, fill valves etc. The profile of work allocated is estimated at: • 45% of jobs needing to be completed in 1 day, including out-of-hour emergencies. • 55% of jobs requiring completion in 7 days.

Construction, Heating, plumbing and ventilation£200,000
Electrical
1 April 2026 to 31 March 2030
What this lot covers

The scope of this Lot comprises repair and maintenance of electrical installations and accessories as set out in the NHF Schedule of Rates for Responsive Maintenance (Version 8) included in Appendix 1CL2, and in accordance with Specification (Appendix 2AL2). We are seeking to appoint a Provider to support our in-house maintenance team with: • Emergency repairs Out of Hours – We estimate 120 jobs per quarter needing to be completed on an emergency basis, reinstating power, dealing with unsafe electrical installations. • Periods of high demand and cover for absence e.g. leave, sickness etc – We estimate issuing up to 60 orders per quarter, all of which will be issued with 28-day priorities for various electrical maintenance and testing. • Work to maintain PV systems and batteries, including enabling work for our roofers – We have a planned installation programme currently providing PV to many of our homes. With over 2,000 homes due to have PV installed, we will require assistance of an MCS accredited Provider to undertake maintenance. Our initial requirement is to assist removal of some panels where properties require repairs to roofs. We estimate issuing up to 6 orders per quarter, all of which will have 7-day targets. Over the four-year period, this work is likely to extend repairing or replacing panels and other PV accessories. • Ad-hoc work in relation to extractor fan replacements – We estimate there to be approximately 100 extractor fans to be replaced annually on a planned 28-day target. We expect the successful Provider to attend and reinstate / repair within the allocated timescale. Disruption and damage associated with this to be kept to a minimum. Any work required following completion of repairs will be handed over to Tai Tarian’s Property Services team. Work Orders will be issued as individual Call-off Contracts from two main sources: 1. Directly from our contact centre colleagues (in house during working hours, externally outside of office hours) on receipt of repairs being reported by tenants. These will aim to capture details of the repair being reported before forwarding details with the work order via email to the Provider. 2. Directly from our Inspectors or Team Leaders, who will provide the necessary scheduled information for work in a work order to be sent via email. The Provider will be required to provide adequate resource to cover all Tai Tarian’s properties (Table 1). Tai Tarian intends (but there is no obligation) to appoint a maximum of 1 Provider as Primary Provider, within this Lot for both the in and out of hours work It is anticipated that a maximum of 1 Provider will be appointed as Reserve Provider within this Lot.

Construction, Electrical£400,000
Carpentry
1 April 2026 to 31 March 2030
What this lot covers

The scope of this Lot comprises installation and maintenance of fire doors as set out in the NHF Schedule of Rates for Responsive Maintenance (Version 8) included in Appendix 1CL3, and in accordance with Specification (Appendix 2AL3) We are seeking to appoint a Provider to complete 7 day and 28-day repairs. We estimate work to be in the region of 35 and 45 orders per quarter to fire doors, namely the installation or replacement of communal doors (not including flat entrance doors) and when necessary, some maintenance to existing doors e.g. closures, adjustments etc. The profile of work allocated is estimated at: • 65% of jobs need to be completed in 7 days. • 35% of jobs requiring completion in 28 days. Providers must have suitable accreditation or equivalent to BM Trada to participate in this work. Work Orders will be issued as individual Call-off Contracts directly from our Inspectors or Team Leaders, who will provide the necessary scheduled information for work in a work order to be sent via email. The Provider will be required to provide adequate resource to cover all Tai Tarian’s properties including those for flats and common areas (Table 2 Breakdown of Blocks and Flats by Ward). Tai Tarian intends (but there is no obligation) to appoint a maximum of 1 Provider as Primary Provider, within this Lot. There is not out of hours service provision included in this Lot. It is anticipated that a maximum of 1 Provider will be appointed as Reserve Provider within this Lot.

Construction, Building maintenance and repairs£180,000
Plastering
1 April 2026 to 31 March 2030
What this lot covers

The scope of this Lot comprises plastering as set out in the NHF Schedule of Rates for Responsive Maintenance (Version 8) included in Appendix 1CL4, and in accordance with Specification (Appendix 2AL4). We are seeking to appoint a Provider to support our in-house maintenance team with periods of high demand and cover for absence e.g. leave sickness etc. We estimate work to be in the region of 30 orders per quarter to complete orders with 28-day targets. Works Orders will be issued as individual Call-off Contracts directly from our Inspectors or Team Leaders, who will provide the necessary scheduled information for work in a work order to be sent via email. The Provider will be required to provide adequate resource to cover all of Tai Tarian’s properties (Table 1 Properties by Ward). Tai Tarian intends (but there is no obligation) to appoint a maximum of 1 Provider as Primary Provider, within this Lot. There is not out of hours service provision included in this Lot. It is anticipated that a maximum of 1 Provider will be appointed as Reserve Provider within this Lot

Construction, Building maintenance and repairs£240,000
Communal Aerials
1 April 2026 to 31 March 2030
What this lot covers

The scope of this Lot comprises work to communal aerials as set out in the NHF Schedule of Rates for Responsive Maintenance (Version 8) included in Appendix 1CL5, and in accordance with Specification (Appendix 2AL5). We are seeking to appoint a Provider to undertake 7-day and 28-day orders. We estimate work to be in the region of 30 orders per quarter to install, maintain or replace communal aerials. The profile of work allocated is estimated at: • 35% of jobs need to be completed in 7 days. • 65% of jobs requiring completion in 28 days. Works Orders will be issued as individual Call-off Contracts directly from our contact centre colleagues (in house during working hours, externally outside of office hours) on receipt of repairs being reported by tenants. These will aim to capture details of the repair being reported before forwarding details with the work order via email to the Provider. The Provider will be required to provide adequate resource to cover all Tai Tarian’s properties with communal aerials (Table 2 Breakdown of Blocks and Flats by Ward) Tai Tarian intends (but there is no obligation) to appoint a maximum of 1 Provider as Primary Provider, within this Lot. There is not out of hours service provision included in this Lot. It is anticipated that a maximum of 1 Provider will be appointed as Reserve Provider within this Lot

Construction, Electrical£80,000
Flooring
1 April 2026 to 31 March 2030
What this lot covers

The scope of this Lot comprises replacement of kitchen and bathroom flooring as set out in the NHF Schedule of Rates for Responsive Maintenance (Version 8) included in Appendix 1DL6, and in accordance with Specification (Appendix 2BL6) We are seeking to appoint a Provider to undertake 28-day orders. The successful provider will be responsible for undertaking all associated works with the flooring replacement which will include, but not be limited to: • Removal and reinstatement of sanitaryware • Remedial works to flooring e.g. renewal of floorboards and applying self-level materials • Any associated plumbing works • Note – no disruption to gas appliances We estimate work to be in the region of 75 and 100 works orders per quarter to install / replace kitchen or bathroom flooring Renewal of bathroom and WC flooring to be fitted after removal of sanitaryware and same sanitaryware to be refitted on completion of flooring. Work Orders will be issued as individual Call-off Contracts directly from our Inspectors or Team Leaders, who will provide the necessary scheduled information for work in a work order to be sent via email. The Provider will be required to provide adequate resource to cover all Tai Tarian’s properties (Table 1 Properties by Ward). Tai Tarian intends (but there is no obligation) to appoint a maximum of 1 Provider as Primary Provider, within this Lot. There is not out of hours service provision included in this Lot. It is anticipated that a maximum of 1 Provider will be appointed as Reserve Provider within this Lot

Construction, Building maintenance and repairs£1,100,000
External Works - Paths, Fencing and Walls
1 April 2026 to 31 March 2030
What this lot covers

The scope of this Lot comprises repairs and maintenance of paths, fencing and walls as set out in the NHF Schedule of Rates for Responsive Maintenance (Version 8) included in Appendix 1CL7 and the NHF Schedule of Rates for Planned Maintenance (Version 8) included in Appendix 1DL7, and in accordance with Specifications (Appendix 2AL7 and 2BL7 respectively) We are seeking to appoint a Provider to undertake 60 day and 365 day orders. We estimate responsive work (60 day) to be in the region of 30 and 40 orders per quarter to replace fencing, re-build steps and walls, re-lay paths. Planned work (365 day) is estimated to be in the region of 20 orders per quarter. Work Orders will be issued as individual Call-off Contracts directly from our Inspectors or Team Leaders, who will provide the necessary scheduled information for work in a work order to be sent via email. The Provider will be required to provide adequate resource to cover all of Tai Tarian’s properties (Table 1 Properties by Ward). Tai Tarian intends (but there is no obligation) to appoint a maximum of 2 Providers as Primary Providers, within this Lot, with one focussing on responsive works and the other planned works. It is anticipated that a maximum of 2 Providers will be appointed as Reserve Providers within this Lot.

Construction, Highways and street lighting£1,400,000
Fabrication of Railings and Gates
1 April 2026 to 31 March 2030
What this lot covers

The scope of this Lot comprises repairs and maintenance of paths, fencing and walls as set out in the NHF Schedule of Rates for Responsive Maintenance (Version 8) included in Appendix 1CL8, and the NHF Schedule of Rates for Planned Maintenance (Version 8) included in Appendix 1DL8, and in accordance with Specifications (Appendix 2AL8 and 2BL8 respectively) We are seeking to appoint a Provider to undertake 60-day orders. We estimate work to be in the region of 25 and 30 orders per quarter to manufacture and fit metal gates, fencing and railings. Work Orders will be issued as individual Call-off Contracts directly from our Inspectors or Team Leaders, who will provide the necessary scheduled information for work in a work order to be sent via email. The Provider will be required to provide adequate resource to cover all Tai Tarian’s properties (Table 1 Properties by Ward). Tai Tarian intends (but there is no obligation) to appoint a maximum of 2 Providers as Primary Providers, within this Lot. There is not out of hours service provision included in this Lot.

Construction£340,000

Timeline

  1. Tender notice · UK4, notice 005080-2026
  2. Tender notice · UK4, notice 011612-2026

About the buyer

Tai Tarian LtdLast 12 months

Procurements

16

Awards

6

Suppliers it has used most for construction

Similar open tenders

All open construction tenders
  1. Contract for the Execution for Renewal of UPVC Windows & Doors at Sketty Park Phase 3

    City & County of SwanseaWalesConstruction

    Closing soon40 hours leftSmall contract

    £170kestimated
  2. Framework for the Maintenance of Fire Doors

    Vale of Glamorgan CouncilWalesConstruction, Building maintenance and repairs

    Closing soon2 days leftLow competitionSuitable for SMEsSmall contractFramework

    £2.5mframework ceiling
  3. Multi-site solar PV installations work for cyngor gwynedd

    Cyngor GwyneddWalesEnergy and utilities, Construction

    Closing soon3 days leftSuitable for SMEsSmall contract

    £1.4mestimated
  4. Ysgol Gymraeg Bro Helyg Primary (Air Source Heat Pump Conversion)

    Blaenau Gwent County Borough CouncilWalesConstruction

    Closing soon3 days leftSuitable for SMEsSmall contract

    £600kestimated
  5. Planned and Preventative Maintenance of CCTV, Door Access and Control Systems and Intruder Alarms

    Aneurin Bevan University Health BoardWalesSecurity, Construction

    Closing soon3 days leftLow competitionSuitable for SMEs

    £2.5mestimated

From notice 005080-2026 on Find a Tender, first published 21 January 2026, last updated 10 February 2026. We last checked for changes on 28 September 2026.