AwardedAwarded 28 October 2025
Sewage Plant Maintenance
Golding Homes · Housing
In brief
Golding Homes awarded construction work to Elliott Environmental Drainage Limited on 28 October 2025.
Built from the notice's own fields. Always check the official notice before you bid.
What the notice says
Routine Maintenance: Scheduled inspection, desludging, cleaning, and servicing of septic tanks and associated systems.
Emergency Response: On-demand response to blockages, overflows, or equipment failures.
Monitoring: Regular checks on effluent levels, inlet/outlet conditions, pumps, and filters.
Reporting: Maintenance logs, incident reports, and compliance documentation in line with environmental regulations.
Who won
| Winner | Value | Dates |
|---|---|---|
| Elliott Environmental Drainage Limited (SME) | £144,000 |
Values as the award notice gives them, excluding VAT where stated.
Timeline
- Contract award notice · notice 069017-2025
About the buyer
Similar open tenders
All open construction tenders- £280mestimated
- £225kestimated
- £152kestimated
- £120kestimated
- £300kestimated
From notice 069017-2025 on Find a Tender, first published 28 October 2025. We last checked for changes on 28 September 2026.