AwardedAwarded 17 February 2026

Sharnberry MWTS - Power Connection - Phase 2 Non-Contestable Works

Mining Remediation Authority · Central government

In brief

Mining Remediation Authority awarded this contract to Northern Powergrid (Northeast) plc on 17 February 2026.

Built from the notice's own fields. Always check the official notice before you bid.

What the notice says

The Water and Abandoned Metal Mines Programme (WAMM) is the primary delivery mechanism to achieve the statutory Environment Act target to halve the length of rivers polluted by harmful metals from abandoned metal mines by 2038. WAMM is being delivered by a partnership between the Mining Remediation Authority, the Environment Agency and Defra. The former Sharnberry mines are located in County Durham at the far eastern edge of the North Pennines Orefield, in the Pennines Moors. The mines pollute rivers in the Wear catchment, specifically the Euden Beck and downstream Bedburn Beck. The Environment Agency carried out a detailed monitoring programme to measure the metal concentrations and river…Read the full description
The Water and Abandoned Metal Mines Programme (WAMM) is the primary delivery mechanism to achieve the statutory Environment Act target to halve the length of rivers polluted by harmful metals from abandoned metal mines by 2038. WAMM is being delivered by a partnership between the Mining Remediation Authority, the Environment Agency and Defra. The former Sharnberry mines are located in County Durham at the far eastern edge of the North Pennines Orefield, in the Pennines Moors. The mines pollute rivers in the Wear catchment, specifically the Euden Beck and downstream Bedburn Beck. The Environment Agency carried out a detailed monitoring programme to measure the metal concentrations and river flows at various points across the catchment. This monitoring indicated that the Sharnberry adit is the most significant source of zinc and cadmium pollution and also contributes to lead pollution. The Environment Agency have advised that a Mine Water Treatment Scheme (MWTS) is required that will require a permanent power connection. In February 2025, it was agreed to progress with Phase 1 of the grid connection, which is from Eggleston Crest to the boundary of the Eggleston Estate access track. This contract is for non-contestable works of the phase 2 grid extension, which is for Northern Powergrid to: - Upgrade the existing two-conductor system to Three-Phase, which involves rebuilding the line. - Carrying out 1x HV closing joint - Undertaking all Senior Authorised Person work associated with all connections to the Distribution System

Who won

WinnerValueDates
Northern Powergrid (Northeast) plc£435,072
20 February 2026 to 31 December 2026
Northern Powergrid (Northeast) plc£0.01
20 February 2026 to 31 December 2026

Values as the award notice gives them, excluding VAT where stated.

Timeline

  1. Transparency notice · UK5, notice 009635-2026
  2. Contract details notice · UK7, notice 028354-2026

About the buyer

From notice 009635-2026 on Find a Tender, first published 3 February 2026, last updated 27 March 2026. We last checked for changes on 28 September 2026.