Upcoming

Wind Turbines

Yorkshire Water Services Limited · Private utility

In brief

Yorkshire Water Services Limited has announced plans to buy this contract. This is an early notice: there is nothing to bid on yet, but it tells you a tender may follow.

The notice does not state a value.

The contract runs for 4 years, up to 6 years with extensions, starting 1 January 2027.

The buyer says it is suitable for small and medium-sized businesses.

Built from the notice's own fields. Always check the official notice before you bid.

Can I win this?

Competition

Typical: a median of 5 bids per contract for similar contracts in this region (from 1172 awards in the last 12 months).

What the notice says

Yorkshire Water (YW) and Kelda are seeking to engage the market to discuss their planned deployment of new on-shore wind turbines. Work done to date indicates deployments of 1-3 turbines at each location, with 7 sites under consideration initially plus 2 re-powering sites. As YW and Kelda look to expand this programme, they anticipate a small scale wind development programme in addition. The deployments would be on YW operational land and would directly power the adjacent operational site, offsetting grid purchased power. Early turbine identification, based on site constraints and available wind yields, suggests Kelda are looking to initially procure in the 500 kW - 3.45 MW range. This will…Read the full description
Yorkshire Water (YW) and Kelda are seeking to engage the market to discuss their planned deployment of new on-shore wind turbines. Work done to date indicates deployments of 1-3 turbines at each location, with 7 sites under consideration initially plus 2 re-powering sites. As YW and Kelda look to expand this programme, they anticipate a small scale wind development programme in addition. The deployments would be on YW operational land and would directly power the adjacent operational site, offsetting grid purchased power. Early turbine identification, based on site constraints and available wind yields, suggests Kelda are looking to initially procure in the 500 kW - 3.45 MW range. This will result in a variance of turbine sizes from hub heights between 40 - 80 meters, and tip heights up to the region of, but not limited to, 117 metres. Later phases of wind development will be in the sub 250 kW range. The purpose of this notice is to open discussion with turbine manufacturers / suppliers to understand; - Equipment / turbines availability; - Indicative lead times for supply; - Indicative pricing, both capex and opex; - Indicative commercial terms; and - After sales maintenance provision. - Transport management - Installation These are non-conclusive and are likely to change as development progresses. YW and Kelda anticipate the award of the procurement in 3 bandings: 1. 1MW A procurement partner may look to cover all of these bandings or just 1. YW and Kelda are open to both new and refurbished turbines via direct purchases from OEMs, broker facilitated procurement and framework agreements.

How to bid

  1. Read the full notice on Find a Tender, including any tender documents it links to.
  2. Register your organisation on the Central Digital Platform (through Find a Tender) if you have not already. Suppliers need to be registered to take part in procurements under the Procurement Act 2023.
  3. Follow the submission instructions in the notice; it does not name an e-tendering portal.

Timeline

  1. Preliminary market engagement notice · UK2, notice 030055-2026
  2. Preliminary market engagement notice · UK2, notice 030058-2026

About the buyer

From notice 030055-2026 on Find a Tender, first published 31 March 2026, last updated 31 March 2026. We last checked for changes on 28 September 2026.