Open3339 days left · closes midday, Tuesday 20 November 2035
24/033 - Qualification System for the provision of Engineering, Procurement and Construction Services for South West Scotland Onshore System (SWSOS)
Gas Networks Ireland · Public body
In brief
Gas Networks Ireland is looking for suppliers for construction and consultancy work (Scotland, Northern Ireland).
The notice does not state a value.
The contract runs for 10 years, starting 20 November 2025.
Bids close at midday, Tuesday 20 November 2035.
Built from the notice's own fields. Always check the official notice before you bid.
Can I win this?
Key dates
- Bids by
- midday, Tuesday 20 November 2035
Competition
Typical: a median of 4 bids per contract for construction contracts in this region (from 172 awards in the last 12 months).
What the notice says
GNI and GNI (UK) are seeking experienced EPCS contractors to deliver a series of critical infrastructure upgrades as part of the SWSOS Decarbonisation Programme, a cornerstone of our commitment to achieving Net Zero by 2050. This tender covers multiple work packages, including the design, procurement, construction, and integration of new electric drive compressor halls across operational sites in Scotland. The successful contractor will manage complex interfaces between new and existing assets, ensuring seamless integration of mechanical, electrical, and control systems, while adhering to stringent cybersecurity and safety standards. This initiative represents a strategic investment in…Read the full description
GNI and GNI (UK) are seeking experienced EPCS contractors to deliver a series of critical infrastructure upgrades as part of the SWSOS Decarbonisation Programme, a cornerstone of our commitment to achieving Net Zero by 2050. This tender covers multiple work packages, including the design, procurement, construction, and integration of new electric drive compressor halls across operational sites in Scotland. The successful contractor will manage complex interfaces between new and existing assets, ensuring seamless integration of mechanical, electrical, and control systems, while adhering to stringent cybersecurity and safety standards. This initiative represents a strategic investment in sustainable energy infrastructure and offers an opportunity to collaborate on projects of significant scale and impact within a multinational framework.
SCOPE OF REQUIREMENTS:
The scope of this tender encompasses overall project management and delivery across multiple work packages, including but not limited to the following:
• Detailed Design Procurement
o Procurement of detailed design for new compressor halls, based on the GNI suite of functional specifications.
• Materials Procurement
o Mechanical materials: high-pressure pipework, valves, and fittings.
o Electrical materials: interconnecting cabling and junction boxes.
o Instrumentation materials: transmitters and data cabling.
Note: The second-stage tender process (CFC) will confirm the final requirements and clarify the full scope boundaries for the electric motor drive (EMD) package and the contractor's scope.
• Construction Activities
o Construction of new compressor halls.
o Completion of all civil works, including excavations, foundations, structural steel, compressor foundations, and ancillary electrical buildings.
o Installation of interconnecting pipework, electrical and control cabling, and junction boxes.
• Integration and System Tie-ins
o Integration of new electric drive compressors into the existing fleet of gas turbines.
o Mechanical, electrical, and control system tie-ins at operational compressor stations across GNI UK sites in Scotland.
• Security and Cybersecurity
o Installation of security systems and implementation of cybersecurity controls in line with GNI specifications.
• Testing and Commissioning
o Full responsibility for FAT and SAT activities.
o Commissioning and start-up of all new systems.
Additional Scope Notes:
• GNI may procure electric motor drive (EMD) packages separately.
• GNI will manage all permitting and planning permissions.
• GNI will separately upgrade incoming site electrical supply to power the new EMD packages.
Indicative EPCS Scope Boundary: The EPCS scope is envisaged to cover all elements required for the delivery of an electric drive compressor station as outlined above.
A more detailed scope is provided within the Appendices of the Qualification System Questionnaire documents.
Should I bid?
Tick what applies to you. Nothing is saved.
How to bid
- Read the full notice on Find a Tender, including any tender documents it links to.
- Submit your bid through the buyer's e-tendering portal: www.etenders.gov.ie.
- Make sure your bid arrives before midday, Tuesday 20 November 2035. Late bids are usually rejected.
Timeline
- Contract notice · notice 075148-2025
About the buyer
Gas Networks IrelandLast 12 months
Procurements
3Awards
0Similar open tenders
All open construction tenders- £180kestimated
- £4.5mframework ceiling
- Value not stated
- £500kestimated
- £24kestimated
From notice 075148-2025 on Find a Tender, first published 19 November 2025. We last checked for changes on 28 September 2026.