University of Salford awarded construction and building maintenance work to Environment & Power Technology Ltd on 20 May 2026.
Built from the notice's own fields. Always check the official notice before you bid.
What the notice says
The existing extract ventilation fan has reached the end of its serviceable life and is no longer operating as intended. It is proposed that the existing fan and motor within the extract ductwork be fully removed and replaced with new. New support framework will be required to facilitate the installation. It is also suspected that asbestos‑containing materials (ACMs) are present within the work area, which the contractor will be required to remove or remediate as necessary to enable completion of the works. The University intends to appoint a Principal Contractor to deliver all elements of the works under a
single package.
Who won
| Winner | Value | Dates |
|---|---|---|
| Environment & Power Technology Ltd (SME) | £170,591 | Awarded 20 May 2026 |
Values as the award notice gives them, excluding VAT where stated.
Timeline
- Contract award notice · UK6, notice 048199-2026
About the buyer
University of SalfordLast 12 months
Procurements
79Awards
68Suppliers it has used most for construction
- Dynamic FM Ltd2 contracts
- Environment & Power Technology Ltd2 contracts
- Barratt Redrow plc1 contract
- British Harlequin Plc1 contract
- CambridgeHOK Refrigeration1 contract
Similar open tenders
All open construction tenders- £40mframework ceiling
- £75kestimated
- £32mframework ceiling
- £160kestimated
- £24kestimated
From notice 048199-2026 on Find a Tender, first published 22 May 2026. We last checked for changes on 28 September 2026.