AwardedAwarded 30 October 2026
Coalsnaughton Support Technical Review
Mining Remediation Authority · Central government
In brief
Mining Remediation Authority awarded architecture and engineering work to SLR Consulting Ltd on 30 October 2026.
The notice gives a value of £299,900 excluding VAT.
The contract runs for 6 months, starting 5 November 2026.
Built from the notice's own fields. Always check the official notice before you bid.
What the notice says
This notice is intended to inform that a call off from a Framework has taken place. The Coalsnaughton Incident requires multidisciplinary engineering input across structural, geotechnical, mining and geological matters. WSP is undertaking significant elements of the technical work and engineering development for Phase 2 under separate commissions approved through the MRA Engineering Services Framework. It is considered appropriate for the MRA to obtain independent technical assurance of key elements of this work. The appointment of SLR provides additional specialist challenge and advice to support the MRA in understanding the technical evidence presented, identifying material gaps or…Read the full description
This notice is intended to inform that a call off from a Framework has taken place.
The Coalsnaughton Incident requires multidisciplinary engineering input across structural, geotechnical, mining and geological matters. WSP is undertaking significant elements of the technical work and engineering development for Phase 2 under separate commissions approved through the MRA Engineering Services Framework.
It is considered appropriate for the MRA to obtain independent technical assurance of key elements of this work. The appointment of SLR provides additional specialist challenge and advice to support the MRA in understanding the technical evidence presented, identifying material gaps or concerns and making informed decisions as the project progresses.
The scope includes:
• review of structural inspection reports relating to properties identified for demolition;
• technical review of proposed protection and demolition works;
• review and interpretation of available site characterisation information;
• engagement with BGS;
• review of relevant WSP technical information and deliverables;
• participation in technical and project meetings; and
• ongoing multidisciplinary technical advice.
The commission is deliberately structured as an assurance and advisory role. SLR will not replace the responsibilities of WSP or other designers and consultants, nor will they make decisions on behalf of the MRA.
Who won
| Winner | Value | Dates |
|---|---|---|
| SLR Consulting Ltd | £299,900 | Awarded 30 October 2026 |
Values as the award notice gives them, excluding VAT where stated.
Timeline
- Contract award notice · notice b757684a-1e7c-4d09-9389-1b91fb4c14f5-921130
About the buyer
Mining Remediation AuthorityLast 12 months
Procurements
82Awards
63Suppliers it has used most for architecture and engineering
- British Geological Survey1 contract
- Five Rivers Environmental Contracting Ltd1 contract
- GW Power-Safe Limited1 contract
- JN Bentley Ltd1 contract
- John Graham Construction Limited1 contract
Similar open tenders
All open architecture and engineering tenders- £5mframework ceiling
- £5mframework ceiling
- £250kestimated
- £1.5mestimated
- £1.4mframework ceiling
From notice b757684a-1e7c-4d09-9389-1b91fb4c14f5-921130 on Contracts Finder, first published 10 November 2026. We last checked for changes on 10 November 2026.