Closed
CUE & Butterfly House Decarbonisation
The Horniman Public Museum and Public Park Trust · Central government
In brief
The Horniman Public Museum and Public Park Trust was looking for suppliers for construction work. Bidding has closed and no award has been published yet.
The estimated value is £900,000 excluding VAT.
The contract runs for 19 months, starting 4 September 2026.
The buyer says it is suitable for small and medium-sized businesses.
Built from the notice's own fields. Always check the official notice before you bid.
What the notice says
The Butterfly House and Centre for Understanding the Environment (CUE) are located within the wider Horniman Gardens site, which is a Grade II listed Park and Garden. The CUE was constructed in 1995 and was originally intended as a temporary structure with an expected lifespan of 20 years. The Butterfly House was constructed in 2016 as glasshouse for tropical plants and butterflies. The Horniman wish to engage a Main Contractor who will manage and deliver the implementation of the decarbonisation of the above buildings in the listed setting. The works will be let on the basis of traditional JCT contract intermediate form without quantities, but with some contractor design elements. As part…Read the full description
The Butterfly House and Centre for Understanding the Environment (CUE) are located within the wider Horniman Gardens site, which is a Grade II listed Park and Garden. The CUE was constructed in 1995 and was originally intended as a temporary structure with an expected lifespan of 20 years. The Butterfly House was constructed in 2016 as glasshouse for tropical plants and butterflies.
The Horniman wish to engage a Main Contractor who will manage and deliver the implementation of the decarbonisation of the above buildings in the listed setting. The works will be let on the basis of traditional JCT contract intermediate form without quantities, but with some contractor design elements.
As part of the Horniman's Climate and Ecology Manifesto we have made a commitment to become Greenhouse Gas Neutral by 2040. The key objective of this project is to move us towards this goal by doing the following:
• Butterfly House: Replacing the gas cabinet air heater with air-to-air Air Source Heat Pumps (ASHPs).
• Butterfly House: Thermal performance and air tightness improvement by replacing existing glass and acrylic with triple layer polycarbonate cladding to existing steel structure with new aluminum glazing bars, window and vents.
• Butterfly House: Thermal performance and carbon reduction by installation of new trench heating with new Air Handling Unit and visitor path surface or as an alternative an fan-coil system
• CUE: Replacing the gas boiler in the Centre for Understanding the Environment (CUE) building with air-to-water Air Source Heat Pumps.
• CUE: Improve the thermal performance and air tightness improvement by draught proofing and thermal bridge mitigation including floor, wall and roof new thermal insulation.
• CUE: Install Mechanical Ventilation Heat Recovery (MVHR)
• Upgrading the electrical cables inside both the Butterfly House and CUE building.
Timeline
- Tender notice · UK4, notice 019024-2026
- Tender notice · UK4, notice 024609-2026
- Tender notice · UK4, notice 024762-2026
- Tender notice · UK4, notice 025347-2026
About the buyer
The Horniman Public Museum and Public Park TrustLast 12 months
Procurements
6Awards
1Similar open tenders
All open construction tenders- £15mestimated
- £100kestimated
- £275kestimated
- £8mestimated
- £160kestimated
From notice 019024-2026 on Find a Tender, first published 3 March 2026, last updated 19 March 2026. We last checked for changes on 28 September 2026.