AwardedAwarded 3 September 2026
DA from NEPO212 for Billingham Sport Hub, Mechanical & Electrical Engineer
Stockton on Tees Borough Council · Local authority
In brief
Stockton on Tees Borough Council awarded architecture and engineering work to Align Property Partners Limited on 3 September 2026.
Built from the notice's own fields. Always check the official notice before you bid.
What the notice says
In January 2024 Alliance Leisure Services Limited, who are the Development Partner on the UK Leisure Framework, were appointed after being recommended as an appropriate and compliant delivery route by the Football Foundation. The UK Leisure Framework allows for direct appointment of the professional team and main contractor and as such, Universal Group were appointed to design and construct Billingham Sports Hub. The outcome of this means an alternative procurement route is sought and it is now essential that the shortcomings identified during the initial commission are not repeated through this new prcurement exercise. The proposed procurement approach has been specifically chosen to…Read the full description
In January 2024 Alliance Leisure Services Limited, who are the Development Partner on the UK Leisure Framework, were appointed after being recommended as an appropriate and compliant delivery route by the Football Foundation. The UK Leisure Framework allows for direct appointment of the professional team and main contractor and as such, Universal Group were appointed to design and construct Billingham Sports Hub.
The outcome of this means an alternative procurement route is sought and it is now essential that the shortcomings identified during the initial commission are not repeated through this new prcurement exercise. The proposed procurement approach has been specifically chosen to strengthen quality assurance, improve design coordination, and provide greater oversight throughout the project lifecycle, ensuring a more robust and deliverable outcome.
It is necessary to appoint a suitably qualified and experienced multidisciplinary consultant team to develop, coordinate and finalise the technical design, ensuring a fully integrated and deliverable scheme across the site. Given the complexity of both the project and the site, it is essential that the appointed consultants demonstrate strong design coordination and project integration capabilities, with a proven track record of successfully delivering complex schemes with the Council. These skills and experience were not sufficiently evident within the previous procurement arrangement and are therefore a critical requirement for the re-procurement process to ensure a coordinated, robust and deliverable design solution.
Who won
| Winner | Value | Dates |
|---|---|---|
| Align Property Partners Limited 1 bid received | £37,550 |
Values as the award notice gives them, excluding VAT where stated.
Timeline
- Contract award notice · notice 098735-2026
Last time this was bought
DA from NEPO212 for Billingham Sports Hub Civil Engineer
- Won by
- Ove Arup & Partners Ltd
- Awarded
- 3 September 2026
- Value
- Not stated, or split across lots
- Bids
- 1
Matched on Stockton on Tees Borough Council, the type of work and the title; it may be a related contract rather than the same one. Check the notice to be sure.
About the buyer
Stockton on Tees Borough CouncilLast 12 months
Procurements
119Awards
93Suppliers it has used most for architecture and engineering
- Ove Arup & Partners Ltd3 contracts
- Bloom Procurement Services Ltd2 contracts
- Ove Arup2 contracts
- Ryder Architecture2 contracts
- A G Building Solutions Ltd1 contract
Similar open tenders
All open architecture and engineering tenders- £5mframework ceiling
- £5mframework ceiling
- £30mestimated
- £145mestimated
- £40mframework ceiling
From notice 098735-2026 on Find a Tender, first published 20 October 2026. We last checked for changes on 20 October 2026.