DPPA framework (Supplier funded On-site renewables)
Network Rail Infrastructure Limited · Central government
In brief
Network Rail Infrastructure Limited was looking for suppliers for energy work. Bidding has closed and no award has been published yet.
It is a framework worth up to £220,000,000 excluding VAT: the most the buyer expects to spend across all suppliers, not one contract.
The contract runs for 8 years, starting 1 February 2027.
Built from the notice's own fields. Always check the official notice before you bid.
What the notice says
Introduction Network Rail (NR) is a public-sector organisation which owns, operates and maintains the rail infrastructure in the United Kingdom. Network Rail owns and operates 20,000 miles of track, 30,000 bridges, tunnels and viaducts and thousands of signals, level crossings and stations, as well as offices and depots across the country. We manage 20 of the UK's largest stations while all the others, over 2,500, are currently managed by the country’s Train Operating Companies (TOC’s). Although this may change with the nationalisation of the Train Operating Companies and the creation of Great British Railways (GBR). Background Network Rail, including TOC’s, use approximately 4.5TWh of…Read the full description
Introduction
Network Rail (NR) is a public-sector organisation which owns, operates and maintains the rail infrastructure in the United Kingdom. Network Rail owns and operates 20,000 miles of track, 30,000 bridges, tunnels and viaducts and thousands of signals, level crossings and stations, as well as offices and depots across the country. We manage 20 of the UK's largest stations while all the others, over 2,500, are currently managed by the country’s Train Operating Companies (TOC’s). Although this may change with the nationalisation of the Train Operating Companies and the creation of Great British Railways (GBR).
Background
Network Rail, including TOC’s, use approximately 4.5TWh of electricity a year, about 0.5TWh is used by NR to power our stations, offices, depots, signals etc. (non-traction power) with the other 4TWh used to power the trains (Traction power).
NR has a well-established Transition to Renewables (T2R) programme which includes both on-site renewables, via capital investment and supplier funded, and Corporate Power Purchase Agreements (CPPA’s). NR has a target to transition all non-traction consumption to renewables by 2030.
Overview
Network Rail intends to establish a framework of five capable and experienced suppliers to support the delivery of on-site or near site supplier funded renewable energy solutions delivered through Power Purchase Agreements (PPA).
The framework will support a variety of renewable energy deployment types, including:
• Rooftops installations
• Car park solar canopies
• Ground-mount systems
• High energy consuming sites with potential to secure nearby land option.
The framework will be technology agnostic, allowing for Solar PV, on-site wind turbines, and future emerging technologies, with the option to include energy storage solutions where appropriate.
The framework will be awarded to five suppliers and be valid for 8 years. It will be available for use across Network Rail, as well as covering the nationalised ToC’s and GBR, including any affiliates. Call-offs will be run as mini competitions through the framework for individual sites or a portfolio of sites. Each resulting call-off contract will be for a term of up to 25 years depending on the technology and project requirements. At the end of the contract there may be an option to:
• Purchase the renewable assets, or
• Extend the contract at a reduced price, or
• Require the removal of the asset and reinstatement of the site.
An initial award of up to five sites will be made to the highest scoring supplier, subject to feasibility and affordability. Further information is included in the procurement documents.
Timeline
- Tender notice · UK4, notice 030444-2026
About the buyer
Network Rail Infrastructure LimitedLast 12 months
Procurements
248Awards
83Suppliers it has used most for energy
- Channel Tunnel Group1 contract
Similar open tenders
All open energy tenders- £92.8mestimated
- £900kframework ceiling
- £4.5mframework ceiling
- Value not stated
- £51kestimated
From notice 030444-2026 on Find a Tender, first published 1 April 2026. We last checked for changes on 28 September 2026.