Closed

GMCA 1185 Salford Road MRF Equipment

Greater Manchester Combined Authority · Local authority

In brief

Greater Manchester Combined Authority was looking for suppliers for architecture and engineering work. Bidding has closed and no award has been published yet.

The estimated value is £20,000,000 excluding VAT.

The contract runs for 16 months, up to 22 months with extensions, starting 20 April 2026.

Built from the notice's own fields. Always check the official notice before you bid.

What the notice says

Under the national Resources and Waste strategy and requirements of Simpler Recycling policy, waste collection authorities (WCAs) that are part of the GMCA waste management arrangements will be required to make changes to current dry, mixed recycling (DMR) collections increasing the range of materials to be collected. The existing materials recovery facility (MRF) at Longley Lane, Sharston does not have the capacity or the sorting equipment required to process these additional materials. GMCA (the Authority) is therefore looking to procure the design, build, installation, commissioning, and testing of new commingled dry recyclable material processing systems to be installed within the…Read the full description
Under the national Resources and Waste strategy and requirements of Simpler Recycling policy, waste collection authorities (WCAs) that are part of the GMCA waste management arrangements will be required to make changes to current dry, mixed recycling (DMR) collections increasing the range of materials to be collected. The existing materials recovery facility (MRF) at Longley Lane, Sharston does not have the capacity or the sorting equipment required to process these additional materials. GMCA (the Authority) is therefore looking to procure the design, build, installation, commissioning, and testing of new commingled dry recyclable material processing systems to be installed within the existing building at the Salford Road, Over Hulton, Bolton site to create a new Mechanical Recovery Facility (MRF). The Salford Road site building has previously operated as an In-Vessel Composting facility and most recently a Bio Transfer Loading Station. The previous equipment has been removed and internal structure of the building refurbished to provide a clean operational space to accommodate new recyclable sorting equipment. On completion of the works the site will be able to process commingled dry recyclable material collected from households across Greater Manchester, with plant outputs in the form of loose material (glass) or baled recyclable materials, with a capacity 140,000 tonnes per annum of input commingled material. The new plant is expected to operate across two x 8 hours shifts daily (Monday - Friday) plus one additional 8-hour shift (Saturday). It is expected to employ one 8-hour daily cleaning shift (Monday - Friday). Maintenance which cannot be completed with the plant "on-line" will be scheduled for non-operational periods, i.e. overnight and at weekends. The key objectives of the procurement are: • That the Works are executed with the highest regard for Health and Safety. • In considering Plant performance, the design and equipment selection shall consider the following objectives: o High equipment availability o High equipment reliability over the long term o Consideration of Capital vs Operational Costs to produce the lowest total cost of ownership o Minimising low-grade operator roles through the use of automated processes o The use of AI to enhance capture and purity rates of materials o Good access for maintenance, demonstrated through HAZOP and Access, Lifting and Maintenance workshops o Good design and access for regular cleaning o High capture rate and purity of Aluminium o High capture rate and purity of natural HDPE o High capture rate and purity of clear PET o High capture rate of glass o High capture rate of film o Flexibility in the design to allow for the future capture of new materials, or to adapt to changes in market specifications of existing materials (eg purity levels), or to allow integration of AI/automation Civil works do not form part of this procurement. Following the Pre-Market Engagement Events, which were carried out on Monday 30th June 2025 and Wednesday 2nd July 2025, the Authority will now commence with the Competitive Flexible Procedure. The Authority reserves the right to issue updated versions (Modifications) of the documents to Suppliers as and when the need arises, in order to reflect the corresponding stage of the Competitive Flexible Procedure, together with any changes to the Procurement or any other new information. The Authority also reserves the right following contract award, as reflected in Schedule 8 of the new Procurement Act 2023, to make various Modifications (unforeseen at this moment) as the contract evolves over the full term of the agreement. In order to bid for this procurement, interested parties must ensure they are registered on the Central Digital Platform (https://www.gov.uk/find-Tender) and the Chest e-tendering portal (www.the-chest.org.uk).

Timeline

  1. Tender notice · UK4, notice 061078-2025

About the buyer

Procurements

304

Awards

202

Suppliers it has used most for architecture and engineering

  1. Sandscale Integrated Depot - RIBA 3 Design Study

    Westmorland and Furness CouncilNorth WestArchitecture and engineering

    Closing soon2 days leftSuitable for SMEsSmall contract

    £174kestimated
  2. PA2 - Archaeological Management Plan & HE1 Works Specification, Wallingford Scheduled Monuments

    Wallingford Town CouncilNorth East, North West, Yorkshire and the Humber, East Midlands, West Midlands, East of England, London, South East, South WestArchitecture and engineering, Leisure, culture and events

    Closing soon3 days leftSuitable for SMEsSmall contract

    £40kestimated
  3. IWM/2627/Exh/3514: 3D Exhibition Design Services Framework for Imperial War Museums

    Imperial War MuseumsNorth West, South EastArchitecture and engineering, Leisure, culture and events

    Closing soon3 days leftExpress interestSuitable for SMEsFramework

    £250kframework ceiling
  4. Countryside Land Management and Estate Maintenance Framework

    Lake District National Park AuthorityNorth WestConstruction, Grounds maintenance and landscaping

    Closing soon3 days left8 lotsSuitable for SMEsFramework

    £4mframework ceiling
  5. Prioritised Capital Improvements Programme - School Properties 2026-28

    Cumberland CouncilNorth WestArchitecture and engineering

    Closing soon6 days leftSuitable for SMEs

    £1.5mestimated

From notice 061078-2025 on Find a Tender, first published 30 September 2025. We last checked for changes on 28 September 2026.