Cancelled

Invitation to Tender (ITT) - Construction & Capital Works

Crescent Purchasing Limited · Local or regional public body

In brief

Crescent Purchasing Limited has cancelled this procurement.

The estimated value is £9,500,000,000 excluding VAT.

The contract runs for 2 years, up to 8 years with extensions, starting 1 May 2026.

It is split into 45 lots, so a supplier can bid for part of the work.

The buyer says it is suitable for small and medium-sized businesses.

Built from the notice's own fields. Always check the official notice before you bid.

What the notice says

The attached pre-market engagement document outlines the proposals we have in place for the route to market, services we envisage to be included and the proposed contract length. Suppliers are requested to sign and return the PME declaration form, along with the completed questionnaire (both documents are embedded within the document). The questionnaire allows suppliers to provide feedback on our proposals that will in turn help determine how the agreement should operate. Registered: Login to https://suppliers.multiquote.com and view the opportunity CA16292. Not registered: Visit https://suppliers.multiquote.com then register and quote CA16292 as the reason for registration. Any queries please contact MultiQuote on [phone number removed].

Lots

LotTradeValue
Lot 1 (a) - England (North) - JCT Minor Works Building Contract (MW)
1 May 2026 to 30 April 2028
What this lot covers

Lot 1 (a) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded.

Construction£211,111,111
Lot 1 (b) - England (North) - JCT Intermediate Building Contract (IC)
1 May 2026 to 30 April 2028
What this lot covers

Lot 1 (b) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded.

Construction£211,111,111
Lot 1 (c)– England (North) – JCT Design and Build Contract (D&B)
1 May 2026 to 30 April 2028
What this lot covers

Lot 1 (c) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded.

Construction£211,111,111
Lot 1 (d) – England North – JCT Design & Build (D&B) with Pre-Construction Services Agreement (PCSA)
1 May 2026 to 30 April 2028
What this lot covers

Lot 1 (d) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded.

Construction£211,111,111
Lot 1 (e) – England North – NEC 4 Engineering and Construction Short Contract
1 May 2026 to 30 April 2028
What this lot covers

Lot 1 (e) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded.

Construction£211,111,111
Lot 1 (f) – England North – NEC4 Engineering and Construction Contract
1 May 2026 to 30 April 2028
What this lot covers

Lot 1 (f) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded.

Construction£211,111,111
Lot 1 (g) – England North - NEC4 Engineering and Construction Contract with NEC4 Professional Services Contract
1 May 2026 to 30 April 2028
What this lot covers

Lot 1 (g) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded.

Construction£211,111,111
Lot 1 (h) – England North - NEC4 Engineering and Construction Contract with D&B
1 May 2026 to 30 April 2028
What this lot covers

Lot 1 (h) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded.

Construction£211,111,111
Lot 1 (i) – England North - National Federation of Demolition Contractors Direct Form of Contract
1 May 2026 to 30 April 2028
What this lot covers

Lot 1 (i) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded.

Construction£211,111,111
Lot 2 (a) – England Midlands - JCT Minor Works Building Contract (MW)
1 May 2026 to 30 April 2028
What this lot covers

Lot 2 (a) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded.

Construction£211,111,111
Lot 2 (b) - England Midlands- JCT Intermediate Building Contract (IC)
1 May 2026 to 30 April 2028
What this lot covers

Lot 2 (b) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded.

Construction£211,111,111
Lot 2 (c) - England Midlands- JCT Design and Build Contract (D&B)
1 May 2026 to 30 April 2028
What this lot covers

Lot 2 (c) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded.

Construction£211,111,111
Lot 2 (d) – England Midlands - JCT Design & Build (D&B) with Pre-Construction Services Agreement (PCSA)
1 May 2026 to 30 April 2028
What this lot covers

Lot 2 (d) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded.

Construction£211,111,111
Lot 2 (e) - England Midlands - NEC 4 Engineering and Construction Short Contract
1 May 2026 to 30 April 2028
What this lot covers

Lot 2 (e) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded.

Construction£211,111,111
Lot 2 (f) – England Midlands - NEC4 Engineering and Construction Contract
1 May 2026 to 30 April 2028
What this lot covers

Lot 2 (f) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded.

Construction£211,111,111
Lot 2 (g) – England Midlands - NEC4 Engineering and Construction Contract with NEC4 Professional Services Contract
1 May 2026 to 30 April 2028
What this lot covers

Lot 2 (g) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded.

Construction£211,111,111
Lot 2 (h) – England Midlands - NEC4 Engineering and Construction Contract with D&B
1 May 2026 to 30 April 2028
What this lot covers

Lot 2 (h) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded.

Construction£211,111,111
Lot 2 (i) – England Midlands - National Federation of Demolition Contractors Direct Form of Contract
1 May 2026 to 30 April 2028
What this lot covers

Lot 2 (i) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded.

Construction£211,111,111
Lot 3 (a) – England South - JCT Minor Works Building Contract (MW)
1 May 2026 to 30 April 2028
What this lot covers

Lot 3 (a) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded.

Construction£211,111,111
Lot 3 (b) – England South - JCT Intermediate Building Contract (IC)
1 May 2026 to 30 April 2028
What this lot covers

Lot 3 (b) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded.

Construction£211,111,111
Lot 3 (c) - England South - JCT Design and Build Contract (D&B)
1 May 2026 to 30 April 2028
What this lot covers

Lot 3 (c) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded.

Construction£211,111,111
Lot 3 (d) – England South - JCT Design & Build (D&B) with Pre-Construction Services Agreement (PCSA)
1 May 2026 to 30 April 2028
What this lot covers

Lot 3 (d) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded.

Construction£211,111,111
Lot 3 (e) - England South - NEC 4 Engineering and Construction Short Contract
1 May 2026 to 30 April 2028
What this lot covers

Lot 3 (e) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded.

Construction£211,111,111
Lot 3 (f) – England South - NEC4 Engineering and Construction Contract
1 May 2026 to 30 April 2028
What this lot covers

Lot 3 (f) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded.

Construction£211,111,111
Lot 3 (g) – England South - NEC4 Engineering and Construction Contract with NEC4 Professional Services Contract
1 May 2026 to 30 April 2028
What this lot covers

Lot 3 (g) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded.

Construction£211,111,111
Lot 3 (h) – England South - NEC4 Engineering and Construction Contract with D&B
1 May 2026 to 30 April 2028
What this lot covers

Lot 3 (h) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded.

Construction£211,111,111
Lot 3 (i) – England South - National Federation of Demolition Contractors Direct Form of Contract
1 May 2026 to 30 April 2028
What this lot covers

Lot 3 (i) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded.

Construction£211,111,111
Lot 4 (a) – Wales - JCT Minor Works Building Contract (MW)
1 May 2026 to 30 April 2028
What this lot covers

Lot 4 (a) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded.

Construction£211,111,111
Lot 4 (b) – Wales - JCT Intermediate Building Contract (IC)
1 May 2026 to 30 April 2028
What this lot covers

Lot 4 (b) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded.

Construction£211,111,111
Lot 4 (c) - Wales - JCT Design and Build Contract (D&B)
1 May 2026 to 30 April 2028
What this lot covers

Lot 4 (c) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded.

Construction£211,111,111
Lot 4 (d) – Wales - JCT Design & Build (D&B) with Pre-Construction Services Agreement (PCSA)
1 May 2026 to 30 April 2028
What this lot covers

Lot 4 (d) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded.

Construction£211,111,111
Lot 4 (e) - Wales - NEC 4 Engineering and Construction Short Contract
1 May 2026 to 30 April 2028
What this lot covers

Lot 4 (e) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded.

Construction£211,111,111
Lot 4 (f) – Wales - NEC4 Engineering and Construction Contract
1 May 2026 to 30 April 2028
What this lot covers

Lot 4 (f) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded.

Construction£211,111,111
Lot 4 (g) – Wales - NEC4 Engineering and Construction Contract with NEC4 Professional Services Contract
1 May 2026 to 30 April 2028
What this lot covers

Lot 4 (g) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded.

Construction£211,111,111
Lot 4 (h) – Wales - NEC4 Engineering and Construction Contract with D&B
1 May 2026 to 30 April 2028
What this lot covers

Lot 4 (h) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded.

Construction£211,111,111
Lot 4 (i) – Wales - National Federation of Demolition Contractors Direct Form of Contract
1 May 2026 to 30 April 2028
What this lot covers

Lot 4 (i) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded.

Construction£211,111,111
Lot 5 (a) – Scotland - JCT Minor Works Building Contract (MW)
1 May 2026 to 30 April 2028
What this lot covers

Lot 5 (a) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded.

Construction£211,111,111
Lot 5 (b) – Scotland - JCT Intermediate Building Contract (IC)
1 May 2026 to 30 April 2028
What this lot covers

Lot 5 (b) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded.

Construction£211,111,111
Lot 5 (c) - Scotland - JCT Design and Build Contract (D&B)
1 May 2026 to 30 April 2028
What this lot covers

Lot 5 (c) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded.

Construction£211,111,111
Lot 5 (d) – Scotland - JCT Design & Build (D&B) with Pre-Construction Services Agreement (PCSA)
1 May 2026 to 30 April 2028
What this lot covers

Lot 5 (d) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded.

Construction£211,111,111
Lot 5 (e) - Scotland - NEC 4 Engineering and Construction Short Contract
1 May 2026 to 30 April 2028
What this lot covers

Lot 5 (e) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded.

Construction£211,111,111
Lot 5 (f) – Scotland - NEC4 Engineering and Construction Contract
1 May 2026 to 30 April 2028
What this lot covers

Lot 5 (f) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded.

Construction£211,111,111
Lot 5 (g) – Scotland - NEC4 Engineering and Construction Contract with NEC4 Professional Services Contract
1 May 2026 to 30 April 2028
What this lot covers

Lot 5 (g) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded.

Construction£211,111,111
Lot 5 (h) – Scotland - NEC4 Engineering and Construction Contract with D&B
1 May 2026 to 30 April 2028
What this lot covers

Lot 5 (h) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded.

Construction£211,111,111
Lot 5 (i) – Scotland - National Federation of Demolition Contractors Direct Form of Contract
1 May 2026 to 30 April 2028
What this lot covers

Lot 5 (i) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded.

Construction£211,111,111

Who won

WinnerLotValueDates

Values as the award notice gives them, excluding VAT where stated.

Timeline

  1. Tender notice · UK4, notice 061802-2025
  2. Procurement termination notice · UK12, notice 062185-2025

About the buyer

Procurements

34

Awards

9

Suppliers it has used most for construction

Similar open tenders

All open construction tenders
  1. Property & Building Services for the Bank of England's Debden Site

    Bank of EnglandEast of EnglandConstruction, Electrical

    Closing soon3 hours leftExpress interestSuitable for SMEs

    £20mestimated
  2. Play Area Design and Refurbishment at Belfairs Park in Southend-on-Sea

    Southend-on-Sea City CouncilEast of EnglandGrounds maintenance and landscaping, Construction

    Closing soon3 hours leftSuitable for SMEsSmall contract

    £149kestimated
  3. Refurbishment of Maughold Head and Douglas Head Lighthouses

    Northern Lighthouse BoardScotlandConstruction, Building maintenance and repairs

    Closing soon3 hours leftSuitable for SMEsSmall contract

    £180kestimated
  4. PS-26-151 - Housing Maintenance & Owner Occ Framework (PRJ0013890)

    East Ayrshire CouncilScotlandConstruction, Building maintenance and repairs

    Closing soon3 hours left12 lotsFramework

    £4.5mframework ceiling
  5. Lochfield Park HA Window & Door Replacements Framework 2027

    Lochfield Park Housing AssociationScotlandConstruction, Building maintenance and repairs

    Closing soon3 hours leftFramework

    Value not stated

From notice 061802-2025 on Find a Tender, first published 2 October 2025, last updated 3 October 2025. We last checked for changes on 28 September 2026.