Invitation to Tender (ITT) - Construction & Capital Works
Crescent Purchasing Limited · Local or regional public body
In brief
Crescent Purchasing Limited has cancelled this procurement.
The estimated value is £9,500,000,000 excluding VAT.
The contract runs for 2 years, up to 8 years with extensions, starting 1 May 2026.
It is split into 45 lots, so a supplier can bid for part of the work.
The buyer says it is suitable for small and medium-sized businesses.
Built from the notice's own fields. Always check the official notice before you bid.
What the notice says
Lots
| Lot | Trade | Value |
|---|---|---|
| Lot 1 (a) - England (North) - JCT Minor Works Building Contract (MW) 1 May 2026 to 30 April 2028 What this lot coversLot 1 (a) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded. | Construction | £211,111,111 |
| Lot 1 (b) - England (North) - JCT Intermediate Building Contract (IC) 1 May 2026 to 30 April 2028 What this lot coversLot 1 (b) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded. | Construction | £211,111,111 |
| Lot 1 (c)– England (North) – JCT Design and Build Contract (D&B) 1 May 2026 to 30 April 2028 What this lot coversLot 1 (c) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded. | Construction | £211,111,111 |
| Lot 1 (d) – England North – JCT Design & Build (D&B) with Pre-Construction Services Agreement (PCSA) 1 May 2026 to 30 April 2028 What this lot coversLot 1 (d) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded. | Construction | £211,111,111 |
| Lot 1 (e) – England North – NEC 4 Engineering and Construction Short Contract 1 May 2026 to 30 April 2028 What this lot coversLot 1 (e) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded. | Construction | £211,111,111 |
| Lot 1 (f) – England North – NEC4 Engineering and Construction Contract 1 May 2026 to 30 April 2028 What this lot coversLot 1 (f) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded. | Construction | £211,111,111 |
| Lot 1 (g) – England North - NEC4 Engineering and Construction Contract with NEC4 Professional Services Contract 1 May 2026 to 30 April 2028 What this lot coversLot 1 (g) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded. | Construction | £211,111,111 |
| Lot 1 (h) – England North - NEC4 Engineering and Construction Contract with D&B 1 May 2026 to 30 April 2028 What this lot coversLot 1 (h) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded. | Construction | £211,111,111 |
| Lot 1 (i) – England North - National Federation of Demolition Contractors Direct Form of Contract 1 May 2026 to 30 April 2028 What this lot coversLot 1 (i) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded. | Construction | £211,111,111 |
| Lot 2 (a) – England Midlands - JCT Minor Works Building Contract (MW) 1 May 2026 to 30 April 2028 What this lot coversLot 2 (a) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded. | Construction | £211,111,111 |
| Lot 2 (b) - England Midlands- JCT Intermediate Building Contract (IC) 1 May 2026 to 30 April 2028 What this lot coversLot 2 (b) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded. | Construction | £211,111,111 |
| Lot 2 (c) - England Midlands- JCT Design and Build Contract (D&B) 1 May 2026 to 30 April 2028 What this lot coversLot 2 (c) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded. | Construction | £211,111,111 |
| Lot 2 (d) – England Midlands - JCT Design & Build (D&B) with Pre-Construction Services Agreement (PCSA) 1 May 2026 to 30 April 2028 What this lot coversLot 2 (d) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded. | Construction | £211,111,111 |
| Lot 2 (e) - England Midlands - NEC 4 Engineering and Construction Short Contract 1 May 2026 to 30 April 2028 What this lot coversLot 2 (e) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded. | Construction | £211,111,111 |
| Lot 2 (f) – England Midlands - NEC4 Engineering and Construction Contract 1 May 2026 to 30 April 2028 What this lot coversLot 2 (f) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded. | Construction | £211,111,111 |
| Lot 2 (g) – England Midlands - NEC4 Engineering and Construction Contract with NEC4 Professional Services Contract 1 May 2026 to 30 April 2028 What this lot coversLot 2 (g) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded. | Construction | £211,111,111 |
| Lot 2 (h) – England Midlands - NEC4 Engineering and Construction Contract with D&B 1 May 2026 to 30 April 2028 What this lot coversLot 2 (h) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded. | Construction | £211,111,111 |
| Lot 2 (i) – England Midlands - National Federation of Demolition Contractors Direct Form of Contract 1 May 2026 to 30 April 2028 What this lot coversLot 2 (i) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded. | Construction | £211,111,111 |
| Lot 3 (a) – England South - JCT Minor Works Building Contract (MW) 1 May 2026 to 30 April 2028 What this lot coversLot 3 (a) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded. | Construction | £211,111,111 |
| Lot 3 (b) – England South - JCT Intermediate Building Contract (IC) 1 May 2026 to 30 April 2028 What this lot coversLot 3 (b) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded. | Construction | £211,111,111 |
| Lot 3 (c) - England South - JCT Design and Build Contract (D&B) 1 May 2026 to 30 April 2028 What this lot coversLot 3 (c) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded. | Construction | £211,111,111 |
| Lot 3 (d) – England South - JCT Design & Build (D&B) with Pre-Construction Services Agreement (PCSA) 1 May 2026 to 30 April 2028 What this lot coversLot 3 (d) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded. | Construction | £211,111,111 |
| Lot 3 (e) - England South - NEC 4 Engineering and Construction Short Contract 1 May 2026 to 30 April 2028 What this lot coversLot 3 (e) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded. | Construction | £211,111,111 |
| Lot 3 (f) – England South - NEC4 Engineering and Construction Contract 1 May 2026 to 30 April 2028 What this lot coversLot 3 (f) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded. | Construction | £211,111,111 |
| Lot 3 (g) – England South - NEC4 Engineering and Construction Contract with NEC4 Professional Services Contract 1 May 2026 to 30 April 2028 What this lot coversLot 3 (g) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded. | Construction | £211,111,111 |
| Lot 3 (h) – England South - NEC4 Engineering and Construction Contract with D&B 1 May 2026 to 30 April 2028 What this lot coversLot 3 (h) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded. | Construction | £211,111,111 |
| Lot 3 (i) – England South - National Federation of Demolition Contractors Direct Form of Contract 1 May 2026 to 30 April 2028 What this lot coversLot 3 (i) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded. | Construction | £211,111,111 |
| Lot 4 (a) – Wales - JCT Minor Works Building Contract (MW) 1 May 2026 to 30 April 2028 What this lot coversLot 4 (a) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded. | Construction | £211,111,111 |
| Lot 4 (b) – Wales - JCT Intermediate Building Contract (IC) 1 May 2026 to 30 April 2028 What this lot coversLot 4 (b) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded. | Construction | £211,111,111 |
| Lot 4 (c) - Wales - JCT Design and Build Contract (D&B) 1 May 2026 to 30 April 2028 What this lot coversLot 4 (c) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded. | Construction | £211,111,111 |
| Lot 4 (d) – Wales - JCT Design & Build (D&B) with Pre-Construction Services Agreement (PCSA) 1 May 2026 to 30 April 2028 What this lot coversLot 4 (d) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded. | Construction | £211,111,111 |
| Lot 4 (e) - Wales - NEC 4 Engineering and Construction Short Contract 1 May 2026 to 30 April 2028 What this lot coversLot 4 (e) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded. | Construction | £211,111,111 |
| Lot 4 (f) – Wales - NEC4 Engineering and Construction Contract 1 May 2026 to 30 April 2028 What this lot coversLot 4 (f) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded. | Construction | £211,111,111 |
| Lot 4 (g) – Wales - NEC4 Engineering and Construction Contract with NEC4 Professional Services Contract 1 May 2026 to 30 April 2028 What this lot coversLot 4 (g) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded. | Construction | £211,111,111 |
| Lot 4 (h) – Wales - NEC4 Engineering and Construction Contract with D&B 1 May 2026 to 30 April 2028 What this lot coversLot 4 (h) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded. | Construction | £211,111,111 |
| Lot 4 (i) – Wales - National Federation of Demolition Contractors Direct Form of Contract 1 May 2026 to 30 April 2028 What this lot coversLot 4 (i) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded. | Construction | £211,111,111 |
| Lot 5 (a) – Scotland - JCT Minor Works Building Contract (MW) 1 May 2026 to 30 April 2028 What this lot coversLot 5 (a) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded. | Construction | £211,111,111 |
| Lot 5 (b) – Scotland - JCT Intermediate Building Contract (IC) 1 May 2026 to 30 April 2028 What this lot coversLot 5 (b) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded. | Construction | £211,111,111 |
| Lot 5 (c) - Scotland - JCT Design and Build Contract (D&B) 1 May 2026 to 30 April 2028 What this lot coversLot 5 (c) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded. | Construction | £211,111,111 |
| Lot 5 (d) – Scotland - JCT Design & Build (D&B) with Pre-Construction Services Agreement (PCSA) 1 May 2026 to 30 April 2028 What this lot coversLot 5 (d) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded. | Construction | £211,111,111 |
| Lot 5 (e) - Scotland - NEC 4 Engineering and Construction Short Contract 1 May 2026 to 30 April 2028 What this lot coversLot 5 (e) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded. | Construction | £211,111,111 |
| Lot 5 (f) – Scotland - NEC4 Engineering and Construction Contract 1 May 2026 to 30 April 2028 What this lot coversLot 5 (f) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded. | Construction | £211,111,111 |
| Lot 5 (g) – Scotland - NEC4 Engineering and Construction Contract with NEC4 Professional Services Contract 1 May 2026 to 30 April 2028 What this lot coversLot 5 (g) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded. | Construction | £211,111,111 |
| Lot 5 (h) – Scotland - NEC4 Engineering and Construction Contract with D&B 1 May 2026 to 30 April 2028 What this lot coversLot 5 (h) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded. | Construction | £211,111,111 |
| Lot 5 (i) – Scotland - National Federation of Demolition Contractors Direct Form of Contract 1 May 2026 to 30 April 2028 What this lot coversLot 5 (i) - The stated value of this lot is a genuine pre-estimate of the spend we envisage going through this lot, however, this may vary according to growth in membership, growth in uptake of the framework, changes in market conditions, etc. and accordingly we will only issue a modification if the overall framework published value of the agreement is exceeded. | Construction | £211,111,111 |
Who won
| Winner | Lot | Value | Dates |
|---|
Values as the award notice gives them, excluding VAT where stated.
Timeline
- Tender notice · UK4, notice 061802-2025
- Procurement termination notice · UK12, notice 062185-2025
About the buyer
Procurements
34Awards
9Suppliers it has used most for construction
- 7 Formation Limited1 contract
- A Buckler Haulage Ltd1 contract
- Aptus Construction Ltd1 contract
- Area1 contract
- Ashfield Projects (Yorkshire) Ltd1 contract
Similar open tenders
All open construction tenders- £20mestimated
- £149kestimated
- £180kestimated
- £4.5mframework ceiling
- Value not stated
From notice 061802-2025 on Find a Tender, first published 2 October 2025, last updated 3 October 2025. We last checked for changes on 28 September 2026.