Upcoming

Large Scale Battery Energy Storage Systems

UK Industrial Fusion Solutions Ltd · Local or regional public body

In brief

UK Industrial Fusion Solutions Ltd has announced plans to buy architecture and engineering work. This is an early notice: there is nothing to bid on yet, but it tells you a tender may follow.

The notice does not state a value.

The contract runs for 4 years, starting 1 April 2029.

Built from the notice's own fields. Always check the official notice before you bid.

Can I win this?

Competition

Typical: a median of 4 bids per contract for this buyer (from 23 awards in the last 12 months).

What the notice says

The following summary is not intended as a complete or definitive specification of the requirement. A purpose of this engagement is to seek information from the market to help refine our understanding and aid the development of a future specification. STEP is currently in its Concept Design phase, which is expected to be completed in 2026. The electrical infrastructure of STEP will resemble that of large conventional thermal power stations; however, its design presents unique challenges: Fusion power stations like STEP have exceptionally large parasitic (auxiliary/house) loads required to initiate and sustain fusion reactions—significantly higher than those in conventional power plants.…Read the full description
The following summary is not intended as a complete or definitive specification of the requirement. A purpose of this engagement is to seek information from the market to help refine our understanding and aid the development of a future specification. STEP is currently in its Concept Design phase, which is expected to be completed in 2026. The electrical infrastructure of STEP will resemble that of large conventional thermal power stations; however, its design presents unique challenges: Fusion power stations like STEP have exceptionally large parasitic (auxiliary/house) loads required to initiate and sustain fusion reactions—significantly higher than those in conventional power plants. These parasitic loads must be supplied by external sources during plant start-up, before the power generation cycle begins producing electricity. The highly dynamic nature of these loads could make compliance with grid code requirements challenging. For more information, please refer to: Staying positive: producing net power | Philosophical Transactions of the Royal Society A | The Royal Society UKIFS is seeking experts to support the technology selection of a central energy storage system (CESS) that is part of the STEP Electrical infrastructure. Due to the power dynamics of operating the STEP power plant and operating parameters set by the National Energy System Operator (NESO), an energy storage system is required to provide a mechanism to ensure that we remain within the NESO operating parameters. Rather than a continuous output, STEP will operate on a pulsed basis. The power dynamics of the fusion pulses are typically different to a conventional power plant, and a CESS has been identified as a critical system to the design as it provides a mechanism to compensate for the changing load dynamics throughout the pulse. This will ensure STEP remains within the NESO defined operating parameters at the point of grid connection. Current assumptions are to exploit existing Battery Energy Storage Systems (BESS) to fulfil the energy storage needs. We are interested in all battery chemistries used in large-scale energy storage systems, including Lithium Iron Phosphate (LFP), Sodium-Sulfur (NaS), Lithium Titanate (LTO), Vanadium Redox Flow Batteries (VRFB), Nickel Manganese-Cobalt (MNC), Solid State Batteries or others. Due to knowledge gaps in BESS behaviour and limitations, the decision of using a BESS system for the CESS cannot be fully justified. This PME is looking to address this. The proposed technical and operational characteristics of the BESS are: 2 operational cycles per day Pulse length will be over 1 hour (continuous) Power range larger than 300MW Energy capacity 100-300MWh Response in the millisecond range Similar charge and discharge rates. Fast response time during power swings (full charge to discharge) High round trip efficiency: 80% In conjunction the BESS will be required to be operated and maintained for the 20-year life of the STEP machine. For more information about this opportunity, please visit the Delta eSourcing portal at: https://ukifs.delta-esourcing.com/tenders/UK-UK-Culham:-Engineering-design-services./44277P4UUB To respond to this opportunity, please click here: https://ukifs.delta-esourcing.com/respond/44277P4UUB

How to bid

  1. Read the full notice on Find a Tender, including any tender documents it links to.
  2. Register your organisation on the Central Digital Platform (through Find a Tender) if you have not already. Suppliers need to be registered to take part in procurements under the Procurement Act 2023.
  3. Follow the submission instructions in the notice; it does not name an e-tendering portal.

Timeline

  1. Preliminary market engagement notice · UK2, notice 007049-2026

About the buyer

Procurements

108

Awards

44

Suppliers it has used most for architecture and engineering

  1. Health Surveillance Services

    Thirteen Housing Group LimitedNorth EastArchitecture and engineering, Healthcare services

    Closing soon3 hours left

    Value not stated
  2. Provision of Insurance and Related Services to Yorkshire Housing

    Yorkshire Housing LimitedUK-wideFinancial services and insurance, Vehicles and fleet

    Closing soonNew3 hours leftExpress interest8 lotsSuitable for SMEs

    £13.6mestimated
  3. Building Maintenance Services (Mechanical and Electrical)

    Scottish Parliamentary Corporate BodyScotlandFacilities management, Architecture and engineering

    Closing soon22 hours left

    Value not stated
  4. Site Energy Project Development Services

    The Pirbright InstituteSouth EastArchitecture and engineering, Energy and utilities

    Closing soon22 hours leftSmall contract

    £51kestimated
  5. MD26097 - Plan Mid Devon Open Space, Allotment Play Area Study

    Mid Devon District CouncilSouth WestArchitecture and engineering

    Closing soon22 hours leftSuitable for SMEsSmall contract

    £25kestimated

From notice 007049-2026 on Find a Tender, first published 27 January 2026. We last checked for changes on 28 September 2026.