AwardedAwarded 28 January 2026
MAIN BLOCK 4-7 Hawkins Road - 2025-2026 Planned roof programme - Pitched Roof
Aster Group Limited · Local or regional public body
In brief
Aster Group Limited awarded construction and building maintenance work to Bell Group Limited on 28 January 2026.
Built from the notice's own fields. Always check the official notice before you bid.
What the notice says
Project: The refurbishment of the main hipped roof NB: All roofing work to be carried out by an NFRC accredited contractor & must be able to self-certify via the competent roofing scheme. As part of contractor pre-survey, contractor should identity any soffit and live extractor fan vents which will need to be disconnected and reconnected during works All flats must be checked to see if there are any live gas appliances, wood burning/multi fuel stoves or open fires still in use prior to the removal of any chimney stacks. Evidence shall be provided to the Aster Surveyor who will be able to authorise this phase of work if necessary. Isolation of flues (priced separately) in line with gas…Read the full description
Project: The refurbishment of the main hipped roof
NB: All roofing work to be carried out by an NFRC accredited contractor & must be able to self-certify via the competent roofing scheme.
As part of contractor pre-survey, contractor should identity any soffit and live extractor fan vents which will need to be disconnected and reconnected during works
All flats must be checked to see if there are any live gas appliances, wood burning/multi fuel stoves or open fires still in use prior to the removal of any chimney stacks. Evidence shall be provided to the Aster Surveyor who will be able to authorise this phase of work if necessary. Isolation of flues (priced separately) in line with gas protocols, removals (priced separately) to be discussed and review with client.
Aster Surveyor to advise with any blocking up and venting work as the scope of work will need to be agreed with the leaseholder/s or resident/s in advance.
Erect tubular steel scaffolding with required lifts to such elevations, including suitable access for removing the shared chimney and dismantle on completion. All scaffolding to be measured against the face of the building and to include the lift heights for a specific work type and trade.
Allow for repositioning of existing satellite dishes & T.V. aerials, including re-instating them and testing the signal both inside and outside of a property. NB: The existing T.V. aerials if live will need to be reinstated inside the loft space
Remove existing tiles, battens, felt, safely lower to ground level and remove from site.
Allow for clearing all debris from the eaves and behind the skeiling/sloping ceiling detail, then insulate using a 50-75mm thick PIR insulation board with a foil backing ensuring that an adequate air gap's left for ventilation.
Allow for the supply and install new structural timber to rafters and ridge sections including noggins to fill in any collapsed verge ladder or rotten rafter (Provisional sum included in pricing document but only to be spent with the agreement of Aster surveyor)
The contractor must allow for accessing the loft spaces in top floor flats to see if the gable ends have been strapped to provide lateral stability.
Allow for supplying and installing Simpson Strong-Tie retrofit restraint straps. (To be installed as per the manufacturers instructions).
Supply and fix new Permavent Apex breathable membrane to the entire roof area and fix new 38 x 25 mm treated and Bs coded timber battens to rafters. Supply and install new Redland Duoplain Concrete Interlocking roof tiles including new dry fixed Redland Universal Angle Ridge. Colour to match existing, to be agreed with the contract surveyor prior to ordering. All materials to be installed as per manufacturer’s instructions.
Supply and fix eaves support trays G1281 by Manthorpe, including rafter roll fitted as per manufacturer’s instructions. To all roofs in contract.
Check the condition of the existing aluminium Ogee guttering and if serviceable clean and check the existing fixtures and fittings are secure and that it doesn’t leak. (The RWGs can remain insitu if found to be in good working order).
Allow for supplying and fitting new deep flow guttering including downpipes, connections and associated fixtures & fittings to flat block.
Test guttering for leaks and adequate falls. Deliver free of dirt or imperfections. All waste material and debris will be removed from site.
The contractor is to leave the properties and surrounding areas etc clean and clear to original condition. Wash down windows, doors, and existing/new PVCu Fascia's/soffits on completion to remove dirt & debris caused by roofing works.
Who won
| Winner | Value | Dates |
|---|---|---|
| Bell Group Limited (SME) | £55,925 | 1 March 2026 to 30 April 2026 |
Values as the award notice gives them, excluding VAT where stated.
Timeline
- Contract details notice · UK7, notice 007996-2026
Last time this was bought
- Won by
- O'Brien Roofing Ltd
- Awarded
- 15 January 2026
- Value
- Not stated, or split across lots
- Contract ends
- 27 February 2026
Matched on Aster Group Limited, the type of work and the title. Check the notice to be sure.
About the buyer
Aster Group LimitedLast 12 months
Procurements
38Awards
30Suppliers it has used most for construction
- FG Property Services Ltd3 contracts
- Active Workplace Group Ltd2 contracts
- O'Brien Roofing Ltd2 contracts
- Shield Building Services UK Ltd2 contracts
- Allsop Carpets & Flooring Ltd (NCP)1 contract
Similar open tenders
All open construction tenders- £75kestimated
- £92.8mestimated
- £4.4mestimated
- £160kestimated
- £180kestimated
From notice 007996-2026 on Find a Tender, first published 29 January 2026. We last checked for changes on 28 September 2026.