AwardedAwarded 30 March 2026

Maxwell Building 8th Floor Asbestos Remediation

University of Salford · Education

In brief

University of Salford awarded construction work to Skyline Property Solutions Ltd on 30 March 2026.

The notice gives a value of £540,000 including VAT.

The contract runs for 2 months, starting 18 May 2026.

The buyer says it is suitable for small and medium-sized businesses.

Built from the notice's own fields. Always check the official notice before you bid.

What the notice says

1.1.1. The University of Salford (UoS) is a leading public institution located in Greater Manchester, UK, with a strong reputation for combining academic excellence and industry engagement. Established in 1967, it serves over 20,000 students across undergraduate, postgraduate, and research programs. Salford is recognised for its close ties to industry, particularly in media, health, engineering, and digital sectors, supported by its strategic location adjacent to MediaCityUK. 1.1.2. The University is the single occupier of the Maxwell Building. The building houses professional services, teaching spaces and a canteen on the ground floor. The building is located centrally on the Peel Park…Read the full description
1.1.1. The University of Salford (UoS) is a leading public institution located in Greater Manchester, UK, with a strong reputation for combining academic excellence and industry engagement. Established in 1967, it serves over 20,000 students across undergraduate, postgraduate, and research programs. Salford is recognised for its close ties to industry, particularly in media, health, engineering, and digital sectors, supported by its strategic location adjacent to MediaCityUK. 1.1.2. The University is the single occupier of the Maxwell Building. The building houses professional services, teaching spaces and a canteen on the ground floor. The building is located centrally on the Peel Park campus and is the main campus reception. The proposed work area is located on the North Wing of the 8th floor which is currently used for teaching and office space. 1.1.3. The University has been unable to access several ceiling voids across the 8th floor due to the presence of asbestos containing materials in varying condition. To address this, the University proposes to remove the asbestos containing materials and carry out an environmental clean of the affected ceiling voids in accordance with the Life Environmental Removal Specification contained within Appendix E. The works will also involve the replacement of existing suspended ceilings, new floor finishes, new corridor doors and lighting upgrades. The University intends to appoint a Principal Contractor to deliver all elements of the works under a single package. 1.1.4. The scheme will be completed during the normal works hours of Monday to Friday 07:30 - 17:00. It is proposed the University will vacate the North Wing of the 8th Floor, for the full duration of works however the wider building, including the adjoining spaces on the 8th Floor, will be in use for the duration of the construction period. Contractors must outline how works will be segregated to allow continued use of the building within the quality response. 1.1.5. Indicative project timescales: ▪ Site Commencement - Monday 18th May 2026 ▪ Practical Completion - Monday 13th July 2026 1.1.6. The project will briefly consist of: ▪ Protection of all retained surface finishes and building elements as required both within and outside work areas. ▪ Asbestos removal and encapsulation works, including associated analytical air monitoring. ▪ Strip out of existing ceilings. ▪ Strip out of existing corridor carpet finish. ▪ Alterations to the existing mechanical and electrical systems as necessary to facilitate the works. ▪ Lighting upgrades. ▪ Installation of new suspended ceilings and carpets. ▪ Making good and commissioning works.

Who won

WinnerValueDates
Skyline Property Solutions Ltd
6 bids received
£327,497
Awarded 30 March 2026

Values as the award notice gives them, excluding VAT where stated.

Timeline

  1. Tender notice · UK4, notice 010529-2026
  2. Tender notice · UK4, notice 010534-2026
  3. Tender notice · UK4, notice 011247-2026
  4. Contract award notice · UK6, notice 031378-2026

About the buyer

University of SalfordLast 12 months

Procurements

79

Awards

68

Suppliers it has used most for construction

Similar open tenders

All open construction tenders
  1. Legacy Shaft and Silo ILW storage decommissioning - Dounreay.

    Nuclear Restoration Services LimitedNorth WestConstruction

    Closing soon33 hours leftExpress interestFramework

    £40mframework ceiling
  2. Kelsall Green Pump Track

    Kelsall Parish CouncilNorth WestGrounds maintenance and landscaping, Construction

    Closing soon39 hours leftSuitable for SMEsSmall contract

    £75kestimated
  3. Property Maintenance & Construction Materials

    Great Places Housing GroupNorth West, Yorkshire and the HumberConstruction, Building maintenance and repairs

    Closing soon3 days left11 lotsSuitable for SMEsFramework

    £32mframework ceiling
  4. Wootton Parish Council - Provision and Installation of Two New Play Areas

    Wootton Parish CouncilNorth East, North West, Yorkshire and the Humber, East Midlands, West Midlands, East of England, London, South East, South WestGrounds maintenance and landscaping, Construction

    Closing soon3 days left2 lotsSuitable for SMEsSmall contract

    £160kestimated
  5. Ehrc 2627-18

    Equality and Human Rights CommissionNorth East, North West, Yorkshire and the Humber, East Midlands, West Midlands, East of England, London, South East, South West, Wales, ScotlandConstruction, Electrical

    Closing soon3 days leftSuitable for SMEsSmall contract

    £24kestimated

From notice 010529-2026 on Find a Tender, first published 5 February 2026, last updated 7 April 2026. We last checked for changes on 28 September 2026.