Upcoming

MBC Refurbishment of Maidstone House & The Link - Supplier Engagement

Maidstone Borough Council · Local authority

In brief

Maidstone Borough Council has announced plans to buy construction and building maintenance work. This is an early notice: there is nothing to bid on yet, but it tells you a tender may follow.

The estimated value is £1 including VAT.

The contract runs for 2 weeks, starting 9 March 2026.

Built from the notice's own fields. Always check the official notice before you bid.

Can I win this?

Competition

Typical: a median of 3 bids per contract for this buyer (from 33 awards in the last 12 months).

What the notice says

Maidstone Borough Council are currently seeking engagement and information from contractors in relation to 6 questions regarding a potential refurbishment of Maidstone House and The Link, located in Maidstone Town Centre above The Mall shopping centre. The proposed works include the refurbishment of Maidstone House and The Link buildings, to primarily replace the interconnected M&E Systems, removing the reliance on gas fired boilers and chillers with a new Electric VRF system along with upgrades to the external wall fabric to improve energy efficiency. The buildings are currently occupied by Maidstone Borough Council, along with a number of external tenants, managed via MBC. Maidstone House…Read the full description
Maidstone Borough Council are currently seeking engagement and information from contractors in relation to 6 questions regarding a potential refurbishment of Maidstone House and The Link, located in Maidstone Town Centre above The Mall shopping centre. The proposed works include the refurbishment of Maidstone House and The Link buildings, to primarily replace the interconnected M&E Systems, removing the reliance on gas fired boilers and chillers with a new Electric VRF system along with upgrades to the external wall fabric to improve energy efficiency. The buildings are currently occupied by Maidstone Borough Council, along with a number of external tenants, managed via MBC. Maidstone House is a high-rise office with 7 floors and a parapet walled flat roof with a maximum occupancy capacity of 825 persons. The building is of 1970’s construction, with a classic red brick slip facade and is built on top of the Mall Shopping Centre. Maidstone House is constructed in direct connection with the structural piers of the structure below it. The Link has 3 floors and a flat roof with a maximum occupancy capacity of 381 persons. The building is of 2008 construction clad in zinc rainscreen and is built on top of the Mall Shopping Centre. The building wraps around a gym and other retail units with street level access via escalator, lift or stairs within a glass walled atrium. The Link also directly links to Maidstone House, at The Mall rooftop level via a glass walled bridge, with services running under the walkway. The Link’s MEP is served from direct connection with heating and cooling plant and connections to services at Maidstone House but has its own electrical plant room. In 2019 Maidstone Borough Council declared a climate emergency and pledged to achieve as close to carbon neutral as possible by 2030. MBC have set a carbon baseline and measures Scope 1, 2 & 3 emissions each year, with the aim to incrementally reduce its own estate emissions as part of their Climate Change Action Plan. The refurbishment of Maidstone House and The Link project aims to directly support this through reducing existing building emissions and actively removing reliance on fossil fuels. Both co-located buildings have their own electrical substation and previous applications to the District Network operator- to increase power due to prospective decarbonisation works- in 2024- were approved by UKPN with no requirement to increase capacity. This Supplier Engagement activity will prepare MBC for potentially going out to tender for a prospective contractor, for a Two Stage Design & Build contract, circa April 2026, with an aim to mobilise on site in September 2026. For more information about this opportunity, please visit the Delta eSourcing portal at: https://www.delta-esourcing.com/tenders/UK-UK-Maidstone:-Overhaul-and-refurbishment-work./2PBTBAR556 To respond to this opportunity, please click here: https://www.delta-esourcing.com/respond/2PBTBAR556

How to bid

  1. Read the full notice on Find a Tender, including any tender documents it links to.
  2. Register your organisation on the Central Digital Platform (through Find a Tender) if you have not already. Suppliers need to be registered to take part in procurements under the Procurement Act 2023.
  3. Follow the submission instructions in the notice; it does not name an e-tendering portal.

Timeline

  1. Preliminary market engagement notice · UK2, notice 020336-2026

About the buyer

Procurements

41

Awards

22

Suppliers it has used most for construction

Similar open tenders

All open construction tenders
  1. ISO11 Fumigation Lobby Replacement Project - Civil Works and CDM Principal Designer/Principal Contractor Role

    The Pirbright InstituteSouth EastConstruction, Management consultancy

    Closing soon10 hours leftSmall contract

    £154kestimated
  2. RBBC-AL-Horley Community Centre Modernisation (Main Contractor JCT Design & Build 2024 Edition)

    Reigate and Banstead Borough CouncilSouth EastConstruction, Building maintenance and repairs

    Closing soon10 hours leftSuitable for SMEsSmall contract

    £1.6mestimated
  3. Old Farm Place Playground Design and Install

    Guildford Borough CouncilSouth EastGrounds maintenance and landscaping, Construction

    Closing soon34 hours leftSmall contract

    Value not stated
  4. Stopham Road, Pulborough

    Stonewater LtdSouth EastConstruction

    Closing soon2 days leftSuitable for SMEs

    £10.3mestimated
  5. Car Park Main Stairwell and Lift Roof Works

    Surrey Heath Borough CouncilSouth EastConstruction, Building maintenance and repairs

    Closing soon2 days leftSuitable for SMEsSmall contract

    £115kestimated

From notice 020336-2026 on Find a Tender, first published 6 March 2026. We last checked for changes on 28 September 2026.