AwardedAwarded 30 July 2026

New Hospital Programme - Hospital 2.0 Alliance (H2A) Framework Call-Off Contract for The Queen Elizabeth Hospital Kings Lynn - New QEH Scheme

The Queen Elizabeth Hospital King's Lynn NHS Foundation Trust · NHS and health

In brief

The Queen Elizabeth Hospital King's Lynn NHS Foundation Trust awarded construction and grounds maintenance work to Skanska Construction UK Limited on 30 July 2026.

The notice gives a value of £1,871,235 excluding VAT.

The contract runs for 5 years, starting 3 August 2026.

Built from the notice's own fields. Always check the official notice before you bid.

What the notice says

NHS England (NHSE) has concluded a competitive dialogue procurement under the Public Contracts Regulations 2015 for the establishment of the Hospital 2.0 Alliance Framework ("H2A Framework") and the Hospital 2.0 Alliance Agreement. These two instruments form the basis of a multi-supplier integrated delivery model created to deliver the New Hospital Programme (NHP). The H2A Framework provides the mechanism for NHS Trusts to award Call-Off Contracts for schemes forming part of the New Hospital Programme using a Model Call-Off Contract. The Hospital 2.0 Alliance Agreement establishes the collaborative enterprise environment for NHSE, the Trusts, and the appointed H2A Contractors to foster…Read the full description
NHS England (NHSE) has concluded a competitive dialogue procurement under the Public Contracts Regulations 2015 for the establishment of the Hospital 2.0 Alliance Framework ("H2A Framework") and the Hospital 2.0 Alliance Agreement. These two instruments form the basis of a multi-supplier integrated delivery model created to deliver the New Hospital Programme (NHP). The H2A Framework provides the mechanism for NHS Trusts to award Call-Off Contracts for schemes forming part of the New Hospital Programme using a Model Call-Off Contract. The Hospital 2.0 Alliance Agreement establishes the collaborative enterprise environment for NHSE, the Trusts, and the appointed H2A Contractors to foster alliance working and standardise design and delivery across the programme. Following completion of the collaborative allocation process in accordance with the terms of the H2A Framework as procured and awarded, The Queen Elizabeth King's Lynn NHS Foundation Trust "the Trust" is now awarding the Call-Off Contract for the New QEH, utilising the H2A Framework and the Model Call-Off Contract. The value of the Call-Off Contract given in this notice reflects the estimated value of the Scheme for all stages. The terms of the Call-Off Contract provide for the services and works to be performed in stages pursuant to the terms of the Model Call-Off Contract. Stage Zero Services comprise all the early constructability and advisory works to be completed in Stage Zero as set out in Scope S215 (Stage Zero Services), and all other work, services and actions which the Call-Off Contract requires the Contractor to do during Stage Zero, with an estimated value of £1,871,235.00. Stage One Services comprise all the pre-construction works to be completed in Stage One as set out in Scope S200 (Stage One Services), and all other work, services and actions which the Call-Off Contract requires the Contractor to do during Stage One. Stage Two Works comprise all the remaining design and construction works forming part of the Scope to be carried out during Stage Two, including all tests, services and actions which the Call Off Contract requires the Contractor to do during Stage Two. Progression from Stage Zero to Stage One and from Stage One to Stage Two is conditional on the relevant Notice to Proceed, the Trust and New Hospital Programme's approvals/governance. Additional information: Link to New Hospital Programme - Hospital 2.0 Alliance (H2A) Framework - Contracts Finder - procurement reference: CF-3484300D0O000000rwimUAA

Who won

WinnerValueDates
Skanska Construction UK Limited£767,000,000
Awarded 30 July 2026

Values as the award notice gives them, excluding VAT where stated.

Timeline

  1. Contract award notice · notice 6ebdc1ab-8f54-4433-8e62-48cb965bcf4b-919464

About the buyer

Similar open tenders

All open construction tenders
  1. C473282 - South Mimms Canteen Refurbishment

    MhraEast of EnglandConstruction, Building maintenance and repairs

    Closing soon9 hours leftLow competitionSuitable for SMEsSmall contract

    £235kestimated
  2. Asbestos Management Framework

    Home GroupNorth East, North West, Yorkshire and the Humber, East Midlands, West Midlands, East of England, London, South East, South West, ScotlandArchitecture and engineering, Construction

    Closing soon11 hours leftExpress interest8 lotsSuitable for SMEsFramework

    £5mframework ceiling
  3. Asbestos Management Framework

    Home GroupNorth East, North West, Yorkshire and the Humber, East Midlands, West Midlands, East of England, London, South East, South West, ScotlandArchitecture and engineering, Construction

    Closing soon11 hours left8 lotsSuitable for SMEsFramework

    £5mframework ceiling
  4. Bbv sublot 4 - hsst1020 - saltley viaduct gabion wall

    Balfour Beatty VINCI JV HS2North East, North West, Yorkshire and the Humber, East Midlands, West Midlands, East of England, London, South WestConstruction, Highways and street lighting

    Closing soon16 hours leftSuitable for SMEs

    £1mestimated
  5. Balfour Beatty - Roads North of the Thames - LTC - Bridge Bearings

    Balfour Beatty Civil Engineering LimitedEast of England, South EastConstruction, Architecture and engineering

    Closing soon16 hours leftSuitable for SMEs

    £500kestimated

From notice 6ebdc1ab-8f54-4433-8e62-48cb965bcf4b-919464 on Contracts Finder, first published 28 October 2026. We last checked for changes on 28 October 2026.