Closed

Pagham Lagoon Water Quality Investigations

Natural England · Central government

In brief

Natural England was looking for suppliers for architecture and engineering work. Bidding has closed and no award has been published yet.

The estimated value is £8,333 excluding VAT.

The contract runs for 2 months, starting 2 February 2026.

The buyer says it is suitable for small and medium-sized businesses.

Built from the notice's own fields. Always check the official notice before you bid.

What the notice says

Pagham Lagoon (Unit 1 of Pagham Harbour SSSI) has been reported as having poor water quality by an external stakeholder, who provided water quality data showing significantly elevated levels of E. coli, total coliforms, and Enterococci. While these parameters are not typically assessed by Natural England, the concentrations reported are of potential ecological concern. No other water quality data for the lagoon is currently available. Following further desk-based investigation, the source of the pollutants is still unknown. Natural England are therefore seeking to obtain a baseline understanding of the water quality condition at Pagham Lagoon and identify the sources of pollutants. This…Read the full description
Pagham Lagoon (Unit 1 of Pagham Harbour SSSI) has been reported as having poor water quality by an external stakeholder, who provided water quality data showing significantly elevated levels of E. coli, total coliforms, and Enterococci. While these parameters are not typically assessed by Natural England, the concentrations reported are of potential ecological concern. No other water quality data for the lagoon is currently available. Following further desk-based investigation, the source of the pollutants is still unknown. Natural England are therefore seeking to obtain a baseline understanding of the water quality condition at Pagham Lagoon and identify the sources of pollutants. This will allow Natural England to determine the best course of action to address the water quality issues within Pagham Lagoon. We will then use this baseline knowledge to implement targeted interventions to ensure SSSI condition improvement. The requirements for the investigation are: 1. Desk based review of known/mapped outfalls into the lagoon, and any other existing evidence. 2. Mapping of surface water drainage system that feeds into the lagoon, to identify key potential sources. 3. Testing of the water quality within the lagoon is expected to include a broad range of parameters to establish baseline conditions and identify potential sources of pollution. The following parameters should be assessed as a minimum: • Dissolved Oxygen • Biochemical Oxygen Demand (BOD) • Turbidity • Nitrogen (likely Dissolved Inorganic Nitrogen due to the saline nature) • Phosphorus (preferably soluble reactive phosphorous) • Ammonia • Conductivity • Temperature • Sulphate • Soluble reactive phosphorous Additional parameters of concern will include: • E. coli • Enterococci • Consideration will also be given to possible sediment sampling, subject to confirmation of lagoon connectivity and sediment deposition processes. • Sampling will be undertaken under various weather conditions to determine whether water quality fluctuations are linked to storm events. • Final written report compiling findings from the desk based and on the ground investigation, identifying and distinguishing sources of pollution, and recommendations for actions to improve water quality review of the information suppliers would need to decide whether they would be interested in an opportunity. This is to be completed by 31st March 2026

Timeline

  1. Tender notice · UK4, notice 001703-2026
  2. Tender notice · UK4, notice 003752-2026

About the buyer

Natural EnglandLast 12 months

Procurements

210

Awards

145

Suppliers it has used most for architecture and engineering

  1. EOD Services Sennelager Training Area

    FCDO ServicesSouth EastFire safety, Architecture and engineering

    Closing soon3 hours leftExpress interestSuitable for SMEs

    £375kestimated
  2. ISO11 Fumigation Lobby Replacement Project - Civil Works and CDM Principal Designer/Principal Contractor Role

    The Pirbright InstituteSouth EastConstruction, Management consultancy

    Closing soon27 hours leftSmall contract

    £154kestimated
  3. Design Consultancy Framework

    Oxford Health NHS Foundation TrustSouth EastManagement consultancy, IT services and software

    Closing soon27 hours leftExpress interest11 lotsSuitable for SMEsFramework

    £4.5mframework ceiling
  4. Site Energy Project Development Services

    The Pirbright InstituteSouth EastArchitecture and engineering, Energy and utilities

    Closing soon2 days leftSmall contract

    £51kestimated
  5. Provision of EA, QS and CDM Consultant Services for Chatsworth Avenue and Hadrians Community Centre

    Waverley Borough CouncilSouth EastArchitecture and engineering

    Closing soon2 days leftSmall contract

    Value not stated

From notice 001703-2026 on Find a Tender, first published 9 January 2026, last updated 16 January 2026. We last checked for changes on 28 September 2026.