Upcoming
Piccadilly Line Upgrade WP5 Northfields Stabling Enabling
Transport for London · Public undertaking
In brief
Transport for London has announced plans to buy construction work. This is an early notice: there is nothing to bid on yet, but it tells you a tender may follow.
The notice does not state a value.
The contract runs for 1 year, up to 18 months with extensions, starting 6 November 2026.
The buyer says it is suitable for small and medium-sized businesses.
Built from the notice's own fields. Always check the official notice before you bid.
Can I win this?
Competition
Usually low: a median of 2 bids per contract for this buyer (from 72 awards in the last 12 months).
What the notice says
This procurement seeks approval to undertake a programme of enabling civil works at Northfields Depot to support the introduction of the new 24 Tube Stock (24TS) fleet on the Piccadilly line. The works are essential to ensure the depot infrastructure is compatible with the operational, maintenance, and stabling requirements of the new trains. The 24TS fleet introduces modern train design features, including different vehicle dimensions, access requirements, power systems, and maintenance needs compared to the existing rolling stock. As a result, sections of the depot's roads, access routes, and supporting infrastructure must be modified to safely accommodate the new fleet. The…Read the full description
This procurement seeks approval to undertake a programme of enabling civil works at Northfields Depot to support the introduction of the new 24 Tube Stock (24TS) fleet on the Piccadilly line. The works are essential to ensure the depot infrastructure is compatible with the operational, maintenance, and stabling requirements of the new trains.
The 24TS fleet introduces modern train design features, including different vehicle dimensions, access requirements, power systems, and maintenance needs compared to the existing rolling stock. As a result, sections of the depot's roads, access routes, and supporting infrastructure must be modified to safely accommodate the new fleet.
The proposed civil works will include adjustments to track alignments, road layouts, and clearances across key areas of the depot (including roads IE to 19E, 9W to 19W, and 4W to 8W), as well as any associated structural and groundworks required to enable safe and efficient train movements and stabling. These works will also facilitate access for maintenance activities and ensure compliance with current safety and operational standards.
Without these enabling works, the depot would not be capable of reliably supporting the introduction and operation of the 24TS fleet, which is critical to the Piccadilly line upgrade programme. The works therefore form a key dependency for fleet deployment, improved service capacity, and long-term network reliability.
How to bid
- Read the full notice on Find a Tender, including any tender documents it links to.
- Register your organisation on the Central Digital Platform (through Find a Tender) if you have not already. Suppliers need to be registered to take part in procurements under the Procurement Act 2023.
- Follow the submission instructions in the notice; it does not name an e-tendering portal.
Timeline
- Preliminary market engagement notice · UK2, notice 062064-2026
About the buyer
Transport for LondonLast 12 months
Procurements
376Awards
150Suppliers it has used most for construction
- Delcore Fire Engineering Ltd2 contracts
- Siemens Mobility Limited2 contracts
- Alan Dick Communications Limited1 contract
- Amalgamated Construction Ltd1 contract
- Amey Rail Limited1 contract
Similar open tenders
All open construction tenders- £1mframework ceiling
- £92.8mestimated
- £50mframework ceiling
- £40mframework ceiling
- £2.61mestimated
From notice 062064-2026 on Find a Tender, first published 2 July 2026. We last checked for changes on 28 September 2026.