Closed

Provision of Bulk Fuel Tank Planned Preventative and Reactive Maintenance

Govia Thameslink Railway Limited · Private utility

In brief

Govia Thameslink Railway Limited was looking for suppliers for heating and plumbing work. Bidding has closed and no award has been published yet.

The estimated value is £1,080,000 including VAT.

The contract runs for 2 years, up to 5 years with extensions, starting 1 April 2026.

The buyer says it is suitable for small and medium-sized businesses.

Built from the notice's own fields. Always check the official notice before you bid.

What the notice says

The objective of the Services is to deliver Planned Preventative and Reactive Maintenance and ancillary goods appertaining to Bulk Fuel Tanks at Selhurst and St Leonards Depots The supplier shall be responsible for PPM for each location, including the following activities: The supplier shall provide GTR with a schedule of planned preventative maintenance (PPM) for all of the equipment in scope, as per the table (appendix 1), located on the Norwood side of Selhurst Depot (a GTR managed facility) and at St Leonards Railway Depot (a third party managed facility). Such equipment shall consist of the tanks, additive injection system, cabinets and pipework. The PPM shall consist of: •Monthly…Read the full description
The objective of the Services is to deliver Planned Preventative and Reactive Maintenance and ancillary goods appertaining to Bulk Fuel Tanks at Selhurst and St Leonards Depots The supplier shall be responsible for PPM for each location, including the following activities: The supplier shall provide GTR with a schedule of planned preventative maintenance (PPM) for all of the equipment in scope, as per the table (appendix 1), located on the Norwood side of Selhurst Depot (a GTR managed facility) and at St Leonards Railway Depot (a third party managed facility). Such equipment shall consist of the tanks, additive injection system, cabinets and pipework. The PPM shall consist of: •Monthly bulk fuel tank de-watering maintenance: the monthly removal of •water contamination from bulk fuel tanks located at Selhurst Depot; •Monthly removal, maintenance and cleaning of bulk fuel filters located at •Selhurst Depot; •Annual additive injection system maintenance: the annual maintenance of •additive injection systems at Selhurst Depot and at St Leonards Railway Depot consisting of: •Calibration of the additive injection systems with a suitable tanker delivery; •Maintenance to diaphragms in injection system; •Tidy up of external cabinets; •Confirm pipework is leak-free and replace any damaged pipework and connections; Ancillary Fuel Systems PPM – Consisting Of: •Monthly fuel dispenser filter maintenance at Selhurst Depot; •Monthly fuel polishing system maintenance at Selhurst Depot; •Monthly fuel tank level monitoring system maintenance; •Monthly fuel additive injection system maintenance at Selhurst Depot and at St Leonards Railway Depot; Continuous cloud data contract for tank (fuel and additives) level monitoring (see section 3 of this TPS) at Selhurst Depot and at St Leonards Railway Depot; Continuous cloud data contract for fuel dispensation monitoring (see section 2) at Selhurst Depot and at St Leonards Railway Depot, including the recording of vehicle details for each dispensation. Bulk fuel tank sampling, every 6 months, at Selhurst Depot and St Leonards Railway Depot; Reactive services for carrying out AAW required for fuel points, bulk fuel tanks, additive tanks, ancillary fuel systems, additive injection systems and Class 171 fuel tank fill valves (see section 3 of this TPS for required service levels) at Selhurst Depot and at St Leonards Railway Depot; Annual maintenance of the lube oil tank at Selhurst Depot. The supplier shall be responsible for the provision of Ancillary Goods and Services at Selhurst Depot and at St Leonards Railway Depot, as follows: •CarbonClear™ Rail Fuel Detergent – 967 litre / 880kg IBC; •FuelClear™ M15 Fuel Biocide; •Replacement of Class 171 fuel tank fill valves (098/015314) as required; •Class 171 fuel tank fill valve refurbishment (as required) in accordance with refurbishment specification to be provided by GTR; 3.Tanks and Associated Pipework- Annual Hardware Support and Software Licence at Selhurst Depot Planned Preventative Maintenance: The supplier shall be responsible for PPM for each location, including the following activities: •The supplier shall provide GTR with a schedule of planned preventative maintenance (PPM) for all of the equipment in scope, as per the below table, located on the Norwood side of Selhurst Depot (a GTR managed facility) and at St Leonards Railway Depot (a third party managed facility). Such equipment shall consist of the tanks, additive injection system, cabinets and pipework. •The PPM shall consist of: •Monthly bulk fuel tank de-watering maintenance: the monthly removal of water contamination from bulk fuel tanks located at Selhurst Depot; •Monthly removal, maintenance and cleaning of bulk fuel filters located at Selhurst Depot; •Annual additive injection system maintenance: the annual maintenance of additive injection systems at Selhurst Depot and at St Leonards Railway Depot consisting of: Calibration of the additive injection systems with a suitable tanker delivery; Maintenance to diaphragms in injection system; Tidy up of external cabinets; Confirm pipework is leak-free and replace any damaged pipework and connections; oAncillary Fuel Systems PPM – This includes: Monthly fuel dispenser filter maintenance at Selhurst Depot; Monthly fuel polishing system maintenance at Selhurst Depot; Monthly fuel tank level monitoring system maintenance; Monthly fuel additive injection system maintenance at Selhurst Depot and at St Leonards Railway Depot; oContinuous cloud data contract for tank (fuel and additives) level monitoring (see section 3 of this TPS) at Selhurst Depot and at St Leonards Railway Depot; oContinuous cloud data contract for fuel dispensation monitoring at Selhurst Depot and at St Leonards Railway Depot, including the recording of vehicle details for each dispensation; oBulk fuel tank sampling, every 6 months, at Selhurst Depot and St Leonards Railway Depot ; oReactive services for carrying out AAW required for fuel points, bulk fuel tanks, additive tanks, ancillary fuel systems, additive injection systems and Class 171 fuel tank fill valves at Selhurst Depot and at St Leonards Railway Depot; oAnnual maintenance of the lube oil tank at Selhurst Depot. To view this notice, please click here: https://goviathameslinkrailway.delta-esourcing.com/delta/viewNotice.html?noticeId=984191974

Timeline

  1. Tender notice · UK4, notice 062469-2025

About the buyer

  1. Westminster Housing Responsive Repairs and Major Works Contracts

    Westminster City CouncilLondonConstruction, Building maintenance and repairs

    Open7 days left2 lots

    £746mestimated
  2. GL RFCA Kensington ARC Boiler Replacement

    Reserve Forces' and Cadets' Association for Greater LondonLondonConstruction, Heating, plumbing and ventilation

    Open8 days leftSuitable for SMEsSmall contract

    £170kestimated
  3. SCAPE Construction Works and Services Framework

    Scape Procure LimitedNorth East, North West, Yorkshire and the Humber, East Midlands, West Midlands, East of England, London, South East, South West, Wales, Northern IrelandEnergy and utilities, Construction

    Open10 days leftExpress interest5 lotsSuitable for SMEsFramework

    £8bnframework ceiling
  4. GL RFCA Barnet ARC Boiler Replacement

    Reserve Forces' and Cadets' Association for Greater LondonLondonConstruction, Heating, plumbing and ventilation

    Open13 days leftSuitable for SMEsSmall contract

    £170kestimated
  5. D2 Dehumidification (L&A and Radiation Stores)

    Science Museum GroupLondonHeating, plumbing and ventilation, Construction

    Open15 days leftSmall contract

    £500kestimated

From notice 062469-2025 on Find a Tender, first published 6 October 2025. We last checked for changes on 28 September 2026.