AwardedAwarded 20 May 2026
Provision of Service Quality Regime (SQR) System
XC Trains Limited · Private utility
In brief
XC Trains Limited awarded IT and software work to Yioshi Ltd on 20 May 2026.
The notice gives a value of £360,000 including VAT.
The contract runs for 3 years, up to 5 years with extensions, starting 20 February 2026.
The buyer says it is suitable for small and medium-sized businesses.
Built from the notice's own fields. Always check the official notice before you bid.
What the notice says
XC Trains Limited (XC) operates passenger rail services over those routes listed within Appendix 2 of the ITP document. XC is a unique operation in that it runs from the Southwest in England to the North of Scotland and is the most extensive rail franchise in Britain, calling at more than 100 stations. XC serves 7 of the 10 largest UK cities with 7 routes radiating from a central hub in Birmingham. The Service Quality Regime (SQR) was set up by the Department for Transport (DfT) to incentivise Train Operating Companies (TOCs) to ensure customer experience standards across the railway network are maintained and improved. The regime is defined in the National Rail Contracts (NRCs) that exist…Read the full description
XC Trains Limited (XC) operates passenger rail services over those routes listed within Appendix 2 of the ITP document. XC is a unique operation in that it runs from the Southwest in England to the North of Scotland and is the most extensive rail franchise in Britain, calling at more than 100 stations. XC serves 7 of the 10 largest UK cities with 7 routes radiating from a central hub in Birmingham.
The Service Quality Regime (SQR) was set up by the Department for Transport (DfT) to incentivise Train Operating Companies (TOCs) to ensure customer experience standards across the railway network are maintained and improved. The regime is defined in the National Rail Contracts (NRCs) that exist between TOCs and the DfT, including in XC's NRC. The NRC sets out the obligations that TOCs have to deliver to ensure compliance with the SQR, and the repercussions if they are not.
XC's SQR has been in place since late 2021 and has seen a few changes since it first started. XC is also proud to have helped the DfT trial changes to SQR during this time to pave the way for other TOCs following in the future.
The key elements and strategic objectives of the Project are:
- A cloud-based database for all SQR-related data, including an SQ Register, reference data, inspection data and rectification evidence data and provision of inspection forms to be used by third party inspectors;
- An inspection forms system that will be used by third-party inspectors and Mystery Shoppers on their mobile devices to undertake and submit inspection data and provision of inspection-related notifications;
- A web-based Back-office System for XC users and inspections supplier quality controllers to view and work with inspection data including the recording of rectification evidence, and creation and maintenance of application programming interfaces (APIs);
- System functionality to generate email notifications in response to triggers linked to data being created or modified within the database;
- APIs to enable the system to integrate with other systems; and
- Reporting both on a regular cycle and as required.
- The purpose of the Procurement is to select a supplier to provide a Service Quality Regime System.
Who won
| Winner | Value | Dates |
|---|---|---|
| Yioshi Ltd (SME) | £558,000 | Awarded 20 May 2026 |
Values as the award notice gives them, excluding VAT where stated.
Timeline
- Tender notice · UK4, notice 062909-2025
- Contract award notice · UK6, notice 046577-2026
About the buyer
XC Trains LimitedLast 12 months
Procurements
7Awards
6Suppliers it has used most for IT and software
- Journeo Fleet Systems Limited1 contract
- Yioshi Ltd1 contract
Similar open tenders
All open IT and software tenders- £82kestimated
- £143kestimated
- £7.2mframework ceiling
- £250kestimated
- £9.17mestimated
From notice 062909-2025 on Find a Tender, first published 7 October 2025, last updated 20 May 2026. We last checked for changes on 28 September 2026.